{{Infobox rocket | name = Space Launch System | image = Artemis II launch (SLS MAF 20260401 ArtemisIILaunch 02) crop.jpg | caption = SLS with the Orion spacecraft launching from Pad 39B for Artemis II | alt = NASA's Space Launch System launching Artemis II with a bright trail of flame. | function = Super heavy-lift launch vehicle | manufacturer = {{Unbulleted indent list | Aerojet Rocketdyne | Boeing | Northrop Grumman | United Launch Alliance }} | country-origin = United States | pcost = {{US$|31.6 billion|link=yes}} as of 2025 (excluding Orion) | cpl = {{US$|2.5 billion}} (excluding Orion) | cpl-year = {{US$|2.6 billion}} (FY23) (excluding Orion)
| height = {{cvt|322|ft|order=flip}} | diameter = {{cvt|27.6|ft|order=flip}}[1] | mass = {{cvt|5,750,000|lb|order=flip}}[2] | stages = 2½ {{Infobox rocket/stage | thrust = {{cvt|8800000|lbf|MN|order=flip}} }}
| capacities = {{Infobox rocket/Payload |location = LEO |altitude = {{cvt|200|km}}[3] |inclination = 28.5° |mass = {{cvt|95000|kg}}[4] }} {{Infobox rocket/Payload | location = TLI | kilos = {{cvt|59500|lb|order=flip}} }} | comparable = {{flatlist| }} | derived_from = {{flatlist| }} | status = Active | sites = Kennedy, LC-39B | launches = 2 | success = 2 | first = November 16, 2022 | last = April 1, 2026 (most recent) | payloads = Orion (crew of 4) | stagedata = {{Infobox rocket/Stage | type = booster | diff = | name = five-segment SRB | number = 2 | length = {{cvt|177|ft|order=flip}} | diameter = {{cvt|12|ft|order=flip}} | empty = | gross = {{cvt|1,600,000|lb|order=flip}} | thrust = {{Unbulleted indent list | {{Abbr|SL|at sea level}}: {{cvt|3,280,000|lbf|MN|order=flip}} | {{Abbr|vac|in vacuum}}: {{cvt|3,600,000|lbf|MN|order=flip}} }} | total = {{Unbulleted indent list | {{Abbr|SL|at sea level}}: {{cvt|6,560,000|lbf|MN|order=flip}} | {{Abbr|vac|in vacuum}}: {{cvt|7,200,000|lbf|MN|order=flip}} }} | SI = {{cvt|269|isp|lk=on}} | burntime = 126 seconds | fuel = APCP (Al / AP / PBAN) }} {{Infobox rocket/Stage | type = stage | stageno = First | name = Core | length = {{cvt|64.6|m}} | diameter = {{cvt|8.4|m}} | empty = {{cvt|215,910|lb|order=flip}}[5] | gross = {{cvt|2392910|lb|order=flip}} | propmass = {{Unbulleted indent list | LH{{sub|2}}: {{cvt|317000|lb|order=flip}} | LOX: {{cvt|1860000|lb|order=flip}} }} | engines = 4 × RS-25 | thrust = {{Unbulleted indent list | {{Abbr|SL|at sea level}}: {{cvt|1,672,000|lbf|MN|order=flip|1}} | engines = {{Unbulleted indent list | 2 × RL10C[9] | 2 × RL10E (planned upgrade)[10] }} | thrust = {{Unbulleted indent list | RL10C: {{cvt|{{#expr:22890*2}}|lb-f|kN|order=flip}} | RL10E: {{cvt|{{#expr:24120*2}}|lb-f|kN|order=flip}}[11] }} | SI = {{Unbulleted indent list | RL10C: {{cvt|453.8|isp}} | RL10E: {{cvt|460.9|isp}}[11] }} | burntime = {{Abbr|CV-HE|Centaur V High Energy}}: 1,077 seconds[12] | fuel = LOX / {{chem2|LH2|link=Liquid hydrogen}} }} }}
The Space Launch System (SLS) is an American two-stage super heavy-lift expendable launch vehicle used by NASA. The primary launch vehicle for the Artemis program, SLS is designed to launch the four-person Orion spacecraft for missions to the Moon, on a trans-lunar injection trajectory. The rocket first launched on November 16, 2022, carrying the uncrewed Artemis I mission. Its first crewed launch was for the Artemis II lunar flyby on April 1, 2026, becoming the second launch vehicle to carry humans beyond low Earth orbit (LEO), after NASA's Saturn V of the Apollo program, and the third to ever be planned to fly humans past LEO, after the N1.
Development of SLS began in 2011 as a congressionally mandated replacement for the retiring Space Shuttle program and the cancelled Ares I and Ares V launch vehicles of the Constellation program, incorporating some hardware from both programs. Costing US$31.6 billion as of 2025, the project has been criticized for mismanagement, budget overruns, and delays, but ultimately succeeded in human spaceflight in 2026.
All SLS launches take place from Launch Complex 39B at the Kennedy Space Center in Florida. SLS' first stage uses the new Boeing-built core stage, powered by four Shuttle-derived RS-25 engines. Attached to the core are two Northrop Grumman five-segment Solid Rocket Boosters, built for the Ares vehicles, tested on Ares I-X, and developed from the Shuttle's four-segment SRB. SLS currently uses the Interim Cryogenic Propulsion Stage (ICPS) as its second stage, for the insertions to low Earth orbit and trans-lunar injection. ICPS uses the RL10 engine, and was derived from the Delta Cryogenic Second Stage designed by Japan's space agency. Aerojet Rocketdyne builds the RS-25 and RL-10 engines.
Starting from Artemis IV, SLS will use the Centaur V upper stage, developed for the Vulcan Centaur, instead of ICPS. NASA previously planned to upgrade SLS from its current Block 1 configuration to a Block 1B and Block 2, but cancelled these plans in February 2026, aiming to standardize on Block 1, to "reduce risk and maintain schedule stability". Block 1B was to use the Exploration Upper Stage, and Block 2 would have used new solid rocket boosters.
While SLS has the highest liftoff thrust of any rocket to ever carry humans, {{Convert|39|MN|lk=on|abbr=off}},{{Efn|The Soviet N-1 rocket produced 45.7 MN and was also designed to carry humans to the Moon, but was never flown manned. SpaceX Starship is also planned to carry humans, and has demonstrated liftoff thrust exceeding 70 MN.{{cn|date=April 2026}}}}[13] SLS's payload capacity to trans-lunar injection of {{Convert|27|MT|lb|0}} is only around half that of the Saturn V's {{Convert|48.6|MT|lb|0}} payload.[14][15][16][17] Thus for Artemis lunar landings, beginning with Artemis IV, Orion is planned to dock with the Human Landing System (HLS) in lunar orbit, separately launched on a non-SLS rocket; SpaceX's Starship HLS and Blue Origin's Blue Moon are under development as HLS vehicles.[18]
Beginning from Artemis V, NASA will transfer SLS operations to the Deep Space Transport LLC, a commercial launch provider consortium of Boeing and Northrop Grumman.
- Energia
- Falcon Heavy
- Long March 9
- N1
- Saturn V
- Starship
- Ares V
- Delta IV
- Space Shuttle
Components
The SLS is a Space Shuttle-derived launch vehicle. Its first stage consists of a central core stage powered by four engines, flanked by two space shuttle-derived solid rocket boosters.
NASA had planned to introduce upgraded variants of the rocket. The Block 1B configuration was to incorporate a larger, purpose-built upper stage, while the Block 2 configuration was to feature newly developed solid rocket boosters. On February 26, 2026, NASA announced that it would standardize the Block 1 configuration and pursue alternative upper-stage options.[19][20][21]
Core stage
The SLS core stage is built by Boeing at NASA's Michoud Assembly Facility in New Orleans. It measures 65 m in length and 8.4 m in diameter, matching the diameter of the Space Shuttle external tank to allow NASA to leverage Shuttle-era experience. The stage is visually similar to the Shuttle tank due to its rust-colored spray-on insulation.
The stage contains liquid hydrogen and liquid oxygen propellant tanks, the attach points for the solid rocket boosters, avionics, equipment for autogenous pressurization of the tanks, and the Main Propulsion System (MPS), an assembly of four RS-25 engines with associated plumbing and hydraulic gimbal actuators. The first core stages reused MPS plumbing removed from the three remaining Space Shuttle orbiters following their decommissioning. The core stage, when combined with the solid rocket boosters, is capable of propelling the Orion spacecraft into a highly elliptical orbit without the upper stage firing, though the upper stage is required for trans-lunar injection.
The core stage structure is primarily made of 2219 aluminum alloy, and compared to the Space Shuttle external tank, several manufacturing improvements were incorporated. Production began in 2014, but delays in manufacturing, testing, and integration postponed the readiness of the first flight article by several years. It uses ten barrel-shaped main sections, four domes, and seven rings.
The first four SLS missions will each use four of the remaining fourteen RS-25D engines left over from the Space Shuttle program. The final two engines needed were assembled from existing RS-25D spare parts.[22] Aerojet Rocketdyne refurbished these engines with modernized controllers, expanded throttle capability, and additional insulation to handle the higher thermal environment caused by proximity to the solid rocket boosters. Later flights will transition to the RS-25E, optimized for expendable use, being faster to build and costing 30% less. Thrust for the refurbished RS-25D engines has been increased from 2188 to 2281 kN, while the RS-25E is rated at 2321 kN per engine. The first test firing of an RS-25E occurred in June 2025 and was declared successful.[23]
The SLS uses a conical frustum-shaped interstage known as the Launch Vehicle Stage Adapter (LVSA) between the core stage and the narrower diameter upper stage. The LVSA consists of sixteen aluminum-lithium panels made of 2195 aluminum alloy and is built by Teledyne Brown Engineering.[24] The first unit cost approximately $60 million, with the next two costing $85 million combined.[25]
Solid rocket boosters
Shuttle-derived
The first eight SLS flights are planned to use two five-segment solid rocket boosters derived from the four-segment Space Shuttle Solid Rocket Booster manufactured by Northrop Grumman. The booster for the SLS incorporates casing segments previously flown as part of the Shuttle program, with the addition of a center segment to increase performance. The boosters feature updated avionics and lighter insulation but do not include a parachute recovery system, as they are expended after launch.
The boosters are filled with an ammonium perchlorate composite propellant, consisting of aluminum powder (fuel) and ammonium perchlorate (oxidizer), bound together with polybutadiene acrylonitrile. The mixture has a rubber eraser-like consistency and is cast into each segment.[26]
At liftoff, the two boosters together produce more than 75 percent of the total thrust required to propel SLS. The five-segment configuration provides approximately 25 percent greater total impulse than the Shuttle-era boosters.
The available inventory of Shuttle-era booster casing segments limits use of this configuration to eight SLS flights.
BOLE
The Booster Obsolescence and Life Extension (BOLE) program was announced in 2019 to develop replacement solid rocket boosters for SLS once the supply of Shuttle-derived hardware is exhausted. In 2021, NASA awarded Northrop Grumman a $3.2 billion contract to produce Shuttle-derived boosters for five missions (Artemis IV–VIII) and to design, develop, and test the new BOLE booster.[27]
The BOLE design replaces Shuttle-era steel motor cases with carbon-fiber composite cases, which are lighter and stronger. It also substitutes the hydraulic thrust vector control system with an electronic system and uses a different propellant formulation derived from Northrop Grumman's commercial solid rocket motors.[27]
Each BOLE booster is designed to produce approximately 3.9 e6lb-f of thrust,[27] about 19 percent greater than the five-segment Shuttle-derived boosters, thereby increasing overall payload capability.
As of 2025, BOLE remains in development. A prototype was test-fired in June 2025 but experienced a nozzle failure approximately 15 seconds before the end of the motor firing. However, the long-term future of the program is uncertain: SLS was authorized for only five flights at that time, and no funding has been provided for production of operational BOLE boosters.[27]
Shuttle-derived
The first eight SLS flights are planned to use two five-segment solid rocket boosters derived from the four-segment Space Shuttle Solid Rocket Booster manufactured by Northrop Grumman. The booster for the SLS incorporates casing segments previously flown as part of the Shuttle program, with the addition of a center segment to increase performance. The boosters feature updated avionics and lighter insulation but do not include a parachute recovery system, as they are expended after launch.
The boosters are filled with an ammonium perchlorate composite propellant, consisting of aluminum powder (fuel) and ammonium perchlorate (oxidizer), bound together with polybutadiene acrylonitrile. The mixture has a rubber eraser-like consistency and is cast into each segment.[26]
At liftoff, the two boosters together produce more than 75 percent of the total thrust required to propel SLS. The five-segment configuration provides approximately 25 percent greater total impulse than the Shuttle-era boosters.
The available inventory of Shuttle-era booster casing segments limits use of this configuration to eight SLS flights.
BOLE
The Booster Obsolescence and Life Extension (BOLE) program was announced in 2019 to develop replacement solid rocket boosters for SLS once the supply of Shuttle-derived hardware is exhausted. In 2021, NASA awarded Northrop Grumman a $3.2 billion contract to produce Shuttle-derived boosters for five missions (Artemis IV–VIII) and to design, develop, and test the new BOLE booster.[27]
The BOLE design replaces Shuttle-era steel motor cases with carbon-fiber composite cases, which are lighter and stronger. It also substitutes the hydraulic thrust vector control system with an electronic system and uses a different propellant formulation derived from Northrop Grumman's commercial solid rocket motors.[27]
Each BOLE booster is designed to produce approximately 3.9 e6lb-f of thrust,[27] about 19 percent greater than the five-segment Shuttle-derived boosters, thereby increasing overall payload capability.
As of 2025, BOLE remains in development. A prototype was test-fired in June 2025 but experienced a nozzle failure approximately 15 seconds before the end of the motor firing. However, the long-term future of the program is uncertain: SLS was authorized for only five flights at that time, and no funding has been provided for production of operational BOLE boosters.[27]
Upper stage
Interim Cryogenic Propulsion Stage
The Interim Cryogenic Propulsion Stage (ICPS) is the upper stage used on the initial Block 1 configuration of the SLS. Three ICPS units were built by United Launch Alliance (ULA), a joint venture of Boeing and Lockheed Martin. The ICPS is derived from the Delta Cryogenic Second Stage (DCSS), incorporating minimal modifications for integration with SLS. Following the discontinuation of the DCSS, further ICPS production is no longer available as an option.
The ICPS flown on Artemis I was powered by a single RL10B-2 engine, also built by Aerojet Rocketdyne. The ICPS units built for Artemis II and III use a single RL10C-2.[28]
Exploration Upper Stage (cancelled)
The Exploration Upper Stage (EUS) was originally planned to debut on Artemis IV as the upper stage for the Block 1B configuration. It would have shared the 8.4 m diameter of the SLS core stage and be powered by four RL10C-3 engines, with a later upgrade to improved RL10C-X engines. Although the EUS progressed through design review, it did not enter full-scale hardware production and was ultimately canceled in February 2026, prior to flight.[29]
Centaur V (future)
In February 2026, NASA announced plans to standardize the SLS on the Block 1 configuration and discontinue development of the Exploration Upper Stage (EUS). With production of the DCSS ended, NASA selected an existing commercially developed upper stage for missions following depletion of the ICPS stock: ULA's Centaur V, which uses a pair of RL10 engines and is expected to provide modestly improved performance over the ICPS.[29][30]
Interim Cryogenic Propulsion Stage
The Interim Cryogenic Propulsion Stage (ICPS) is the upper stage used on the initial Block 1 configuration of the SLS. Three ICPS units were built by United Launch Alliance (ULA), a joint venture of Boeing and Lockheed Martin. The ICPS is derived from the Delta Cryogenic Second Stage (DCSS), incorporating minimal modifications for integration with SLS. Following the discontinuation of the DCSS, further ICPS production is no longer available as an option.
The ICPS flown on Artemis I was powered by a single RL10B-2 engine, also built by Aerojet Rocketdyne. The ICPS units built for Artemis II and III use a single RL10C-2.[28]
Exploration Upper Stage (cancelled)
The Exploration Upper Stage (EUS) was originally planned to debut on Artemis IV as the upper stage for the Block 1B configuration. It would have shared the 8.4 m diameter of the SLS core stage and be powered by four RL10C-3 engines, with a later upgrade to improved RL10C-X engines. Although the EUS progressed through design review, it did not enter full-scale hardware production and was ultimately canceled in February 2026, prior to flight.[29]
Centaur V (future)
In February 2026, NASA announced plans to standardize the SLS on the Block 1 configuration and discontinue development of the Exploration Upper Stage (EUS). With production of the DCSS ended, NASA selected an existing commercially developed upper stage for missions following depletion of the ICPS stock: ULA's Centaur V, which uses a pair of RL10 engines and is expected to provide modestly improved performance over the ICPS.[29][30]
Block variants
Development
Funding
During the joint Senate-NASA presentation in September 2011, it was stated that the SLS program had a projected development cost of US$18 billion through 2017, with $10 billion for the SLS rocket, $6 billion for the Orion spacecraft, and $2 billion for upgrades to the launch pad and other facilities at Kennedy Space Center.[32][33] These costs and schedules were considered optimistic in an independent 2011 cost assessment report by Booz Allen Hamilton for NASA.[34] An internal 2011 NASA document estimated the cost of the program through 2025 to total at least $41 billion for four 95 t launches (1 uncrewed, 3 crewed),[35][36] with the 130 t version ready no earlier than 2030.[37] The Human Exploration Framework Team estimated unit costs for 'Block 0' at $1.6 billion and Block 1 at $1.86 billion in 2010.[38] However, since these estimates were made, the Block 0 SLS vehicle was dropped in late 2011, and the design was not completed.
In September 2012, an SLS deputy project manager stated that $500 million is a reasonable target average cost per flight for the SLS program.[39] In 2013, the Space Review estimated the cost per launch at $5 billion, depending on the rate of launches.[40][41] NASA announced in 2013 that the European Space Agency will build the Orion service module.[42] In August 2014, as the SLS program passed its Key Decision Point C review and was deemed ready to enter full development, costs from February 2014 until its planned launch in September 2018 were estimated at $7.021 billion. Ground systems modifications and construction would require an additional $1.8 billion over the same time.[43]
In October 2018, NASA's Inspector General reported that the Boeing core stage contract had made up 40% of the $11.9 billion spent on the SLS as of August 2018. By 2021, development of the core stage was expected to have cost $8.9 billion, twice the initially planned amount.[44] In December 2018, NASA estimated that yearly budgets for the SLS will range from $2.1 to $2.3 billion between 2019 and 2023.[45]
In March 2019, the Trump administration released its fiscal year 2020 budget request for NASA, which notably proposed dropped funding for the Block 1B and 2 variants of SLS. Congressional action ultimately included the funding in the passed budget.[46]
On May 1, 2020, NASA awarded a contract extension to Aerojet Rocketdyne to manufacture 18 additional RS-25 engines with associated services for $1.79 billion, bringing the total RS-25 contract value to almost $3.5 billion.
Budget
NASA has spent $29.0 billion on SLS development from 2011 through 2024, in nominal dollars. This is equivalent to $35.4 billion in 2025 dollars using the NASA New Start Inflation Indices.
In 2025, the Enacted NASA Budget for Exploration, which includes SLS, is approximately the same again as 2024.
Included in the above SLS costs above are (1) the Interim Cryogenic Propulsion Stage (ICPS), a $412 million contract[52] and (2) the costs of developing the Exploration Upper Stage (below).
Excluded from the SLS cost above are the costs to assemble, integrate, prepare and launch the SLS and its payloads, funded separately in the NASA Exploration Ground Systems, currently at about $600 million per year, and anticipated to stay there through at least the first four launches of SLS. Also excluded are payloads that launch on the SLS, such as the Orion crew capsule, the predecessor programs that contributed to the development of the SLS, such as the Ares V cargo launch vehicle project, funded from 2008 to 2010 for a total of $70 million, and the Ares I crew launch vehicle, funded from 2006 to 2010 for a total of $4.8 billion[53] in development, including the 5-segment Solid Rocket Boosters used on the SLS.
Despite calls from the Trump administration to terminate the SLS program after Artemis III, the 2025 One Big Beautiful Bill Act included $4.1 billion to fund SLS rockets for the Artemis IV and V missions, with mandated minimum spending of $1.025 billion per year from FY 2026 through 29.[54] However, as a compromise, lawmakers suggested eliminating the EUS, and directed NASA to evaluate alternatives such as the Centaur V or New Glenn's GS2 upper stage. In early 2026 this change was implemented with the Centaur V being selected as the future SLS upper stage.[55][30]
Budget
NASA has spent $29.0 billion on SLS development from 2011 through 2024, in nominal dollars. This is equivalent to $35.4 billion in 2025 dollars using the NASA New Start Inflation Indices.
In 2025, the Enacted NASA Budget for Exploration, which includes SLS, is approximately the same again as 2024.
Included in the above SLS costs above are (1) the Interim Cryogenic Propulsion Stage (ICPS), a $412 million contract[52] and (2) the costs of developing the Exploration Upper Stage (below).
Excluded from the SLS cost above are the costs to assemble, integrate, prepare and launch the SLS and its payloads, funded separately in the NASA Exploration Ground Systems, currently at about $600 million per year, and anticipated to stay there through at least the first four launches of SLS. Also excluded are payloads that launch on the SLS, such as the Orion crew capsule, the predecessor programs that contributed to the development of the SLS, such as the Ares V cargo launch vehicle project, funded from 2008 to 2010 for a total of $70 million, and the Ares I crew launch vehicle, funded from 2006 to 2010 for a total of $4.8 billion[53] in development, including the 5-segment Solid Rocket Boosters used on the SLS.
Despite calls from the Trump administration to terminate the SLS program after Artemis III, the 2025 One Big Beautiful Bill Act included $4.1 billion to fund SLS rockets for the Artemis IV and V missions, with mandated minimum spending of $1.025 billion per year from FY 2026 through 29.[54] However, as a compromise, lawmakers suggested eliminating the EUS, and directed NASA to evaluate alternatives such as the Centaur V or New Glenn's GS2 upper stage. In early 2026 this change was implemented with the Centaur V being selected as the future SLS upper stage.[55][30]
Early plans
The SLS was created by an act of the U.S. Congress in the NASA Authorization Act of 2010, Public Law 111–267, in which NASA was directed to create a system for launching payloads and crew into space that would replace the capabilities lost with the retirement of the Space Shuttle. The act set out certain goals, such as being able to lift 70–100 tons into low earth orbit with evolvability to 130 tons, a target date of December 31, 2016, for the system to be fully operational, and a directive to use "to the extent practicable" existing components, hardware, and workforce from the Space Shuttle and from Ares I.
On September 14, 2011, NASA announced their plan to meet these requirements: the design for the SLS, with the Orion spacecraft as payload.[62][63][64] The SLS has considered several future development routes of potential launch configurations, with the planned evolution of the blocks of the rocket having been modified many times. Many options, all of which just needed to meet the congressionally mandated payload minimums, were considered, including a Block 0 variant with three main engines, a variant with five main engines, a Block 1A variant with upgraded boosters instead of the improved second stage, and a Block 2 with five main engines plus the Earth Departure Stage, with up to three J-2X engines.
In the initial announcement of the design of the SLS, NASA also announced an "Advanced Booster Competition", to select which boosters would be used on Block 2 of the SLS.[65][66] Several companies proposed boosters for this competition, all of which were indicated as viable:[67] Aerojet and Teledyne Brown proposed three booster engines each with dual combustion chambers,[68] Alliant Techsystems proposed a modified solid rocket booster with lighter casing, more energetic propellant, and four segments instead of five,[69] and Pratt & Whitney Rocketdyne and Dynetics proposed a liquid-fueled booster named Pyrios.[70] However, this competition was planned for a development plan in which Block 1A would be followed by Block 2A, with upgraded boosters. NASA canceled Block 1A and the planned competition in April 2014, in favor of simply remaining with the Ares I's five-segment solid rocket boosters, themselves modified from the Space Shuttle's solid rocket boosters, until at least the late 2020s.[71] The overly powerful advanced booster would have resulted in unsuitably high acceleration, and would need modifications to Launch Complex 39B, its flame trench, and Mobile Launcher.[72]
On July 31, 2013, the SLS passed Preliminary Design Review. The review included not only the rocket and boosters but also ground support and logistical arrangements.[73]
On August 7, 2014, the SLS Block 1 passed a milestone known as Key Decision Point C and entered full-scale development, with an estimated launch date of November 2018.[74]
EUS options
In 2013, NASA and Boeing analyzed the performance of several Exploration Upper Stage (EUS) engine options. The analysis was based on a second-stage usable propellant load of 105 metric tons, and compared stages with four RL10 engines, two MARC-60 engines, or one J-2X engine.[75][76] In 2014, NASA also considered using the European Vinci instead of the RL10, which offered the same specific impulse but with 64% greater thrust, which would allow for the same performance at a lower cost.[77]
In 2018, Blue Origin submitted a proposal to replace the EUS with a cheaper alternative to be designed and fabricated by the company, but it was rejected by NASA in November 2019 on multiple grounds; these included lower performance compared to the existing EUS design, incompatibility of the proposal with the height of the door of the Vehicle Assembly Building being only 390 ft, and unacceptable acceleration of Orion components such as its solar panels due to the higher thrust of the engines being used for the fuel tank.[78][79]
In February 2026, NASA administrator Jared Isaacman announced the cancellation of EUS.[80]
SRB tests
From 2009 to 2011, three full-duration static fire tests of five-segment solid rocket boosters were conducted under the Constellation Program, including tests at low and high core temperatures, to validate performance at extreme temperatures.[81][82][83] The 5-segment solid rocket booster would be carried over to SLS. Northrop Grumman Innovation Systems has completed full-duration static fire tests of the five-segment solid rocket boosters. Qualification Motor 1 was tested on March 10, 2015.[84] Qualification Motor 2 was successfully tested on June 28, 2016.[85]
EUS options
In 2013, NASA and Boeing analyzed the performance of several Exploration Upper Stage (EUS) engine options. The analysis was based on a second-stage usable propellant load of 105 metric tons, and compared stages with four RL10 engines, two MARC-60 engines, or one J-2X engine.[75][76] In 2014, NASA also considered using the European Vinci instead of the RL10, which offered the same specific impulse but with 64% greater thrust, which would allow for the same performance at a lower cost.[77]
In 2018, Blue Origin submitted a proposal to replace the EUS with a cheaper alternative to be designed and fabricated by the company, but it was rejected by NASA in November 2019 on multiple grounds; these included lower performance compared to the existing EUS design, incompatibility of the proposal with the height of the door of the Vehicle Assembly Building being only 390 ft, and unacceptable acceleration of Orion components such as its solar panels due to the higher thrust of the engines being used for the fuel tank.[78][79]
In February 2026, NASA administrator Jared Isaacman announced the cancellation of EUS.[80]
SRB tests
From 2009 to 2011, three full-duration static fire tests of five-segment solid rocket boosters were conducted under the Constellation Program, including tests at low and high core temperatures, to validate performance at extreme temperatures.[81][82][83] The 5-segment solid rocket booster would be carried over to SLS. Northrop Grumman Innovation Systems has completed full-duration static fire tests of the five-segment solid rocket boosters. Qualification Motor 1 was tested on March 10, 2015.[84] Qualification Motor 2 was successfully tested on June 28, 2016.[85]
Proposed cancellation
On February 7, 2025, Boeing, the primary contractor for the SLS, informed its employees working on the rocket program that they may face layoffs when the company's contract expires in March. The announcement coincided with the anticipated release of the presidential budget, suggesting the Trump administration might propose canceling the SLS program.[86]
On May 2, 2025, the Trump administration released its fiscal year 2026 budget proposal for NASA, which calls for terminating the SLS and Orion spacecraft programs after Artemis III.[87][88] The budget proposal described the SLS as "grossly expensive", noting that it costs $4 billion per launch and has exceeded its budget by 140 percent. The budget allocates funding for a program to transition to "more cost-effective commercial systems", a move projected by the White House Office of Management and Budget to save NASA $879 million.[89]
The 2025 One Big Beautiful Bill Act included funding for SLS rockets for the Artemis IV and V missions, but a clause directed NASA to evaluate alternatives to the EUS.[54][55]
Launch costs
NASA has been reluctant to provide an official per-flight cost estimate for the SLS.[90] However, independent agencies, such as the White House Office of Management and Budget and the NASA Office of Inspector General, have offered their own estimates.
A White House Office of Management and Budget letter to the Senate Appropriations Committee in October 2019 estimated that SLS's total cost to the taxpayer was estimated at "over $2 billion" per launch. When questioned by a journalist, a NASA spokesperson did not deny this per-flight cost estimate.
The NASA Office of Inspector General has conducted several audits of the SLS program. A November 2021 report estimated that, at least for the first four launches of Artemis program, the per-launch production and operating costs would be $2.2 billion for SLS, plus $568 million for Exploration Ground Systems. Additionally, the payload would cost $1 billion for Orion and $300 million for the European Service Module. An October 2023 report found that recurring production costs for SLS, excluding development and integration costs, are estimated to be at least $2.5 billion per launch. In 2025, Sean Duffy, the then acting NASA administrator, said that, "Artemis I, Artemis II, and Artemis III are all $4 billion a launch".[55]
NASA has said that it is working with Boeing to bring down the cost of SLS launches and that a higher launch frequency could potentially lead to economies of scale, and would allow fixed costs to be spread out over more launches. However, the NASA Office of Inspector General has called NASA's cost savings goals highly unrealistic and other potential government customers have made it clear they have no interest in using SLS.
Operation
Construction
As of 2020, three SLS versions were planned: Block 1, Block 1B, and Block 2. Each would use the same core stage with its four main engines, but Block 1B will feature the Exploration Upper Stage (EUS), and Block 2 will combine the EUS with upgraded boosters.[91][92]
The ICPS for Artemis 1 was delivered by ULA to NASA about July 2017[93] and was housed at Kennedy Space Center as of November 2018.[94]
Construction of core stage
In mid-November 2014, construction of the first core stage hardware began using a new friction stir welding system in the South Vertical Assembly Building at NASA's Michoud Assembly Facility. Between 2015 and 2017, NASA test fired RS-25 engines in preparation for use on SLS.
The core stage for the first SLS, built at Michoud Assembly Facility by Boeing, had all four engines attached in November 2019,[95] and it was declared finished by NASA in December 2019.[96]
The first core stage left Michoud Assembly Facility for comprehensive testing at Stennis Space Center in January 2020.[97] The static firing test program at Stennis Space Center, known as the Green Run, operated all the core stage systems simultaneously for the first time.[98][99] Test 7 (of 8), the wet dress rehearsal, was carried out in December 2020 and the fire (test 8) took place on January 16, 2021, but shut down earlier than expected,[100] about 67 seconds in total rather than the desired eight minutes. The reason for the early shutdown was later reported to be because of conservative test commit criteria on the thrust vector control system, specific only for ground testing and not for flight. If this scenario occurred during a flight, the rocket would have continued to fly normally. There was no sign of damage to the core stage or the engines, contrary to initial concerns.[101]
The second fire test was completed on March 18, 2021, with all four engines igniting, throttling down as expected to simulate in-flight conditions, and gimballing profiles. The core stage was shipped to Kennedy Space Center to be mated with the rest of the rocket for Artemis I. It left Stennis on April 24 and arrived at Kennedy on April 27.[102] It was refurbished there in preparation for stacking.[103] On June 12, 2021, NASA announced the assembly of the first SLS rocket was completed at the Kennedy Space Center. The assembled SLS was used for the uncrewed Artemis I mission in 2022.
The first SLS, for Artemis I, launched an Orion spacecraft into a lunar orbit on a test flight in fall 2022,[104] and NASA and Boeing are constructing the next three rockets for Artemis II, Artemis III, and Artemis IV. Boeing stated in July 2021 that while the COVID-19 pandemic had affected their suppliers and schedules, such as delaying parts needed for hydraulics, they would still be able to provide the Artemis II SLS core stage per NASA's schedule, with months to spare. The spray-on foam insulation process for Artemis II was automated for most sections of the core stage, saving 12 days in the schedule. The Artemis II forward skirt, the foremost component of the core stage, was affixed on the liquid oxygen tank in late May 2021. By September 25, 2023, the core stage was functionally complete, as all sections were assembled and the four RS-25 engines had been installed.[105] The complete core stage was set to ship to NASA in late fall 2023,[106][107] eight months later than was predicted originally.[108] The complete core stage was delivered in July 2024.[109] For Artemis III, assembly of elements of the thrust structure began at Michoud Assembly Facility in early 2021. By August 2025, the thrust structure was completed and moved to storage in the Vehicle Assembly Building at Kennedy, to await the rest of the stage's arrival in mid-2026.[110] The liquid hydrogen tank for Artemis III was originally planned to be the Artemis I tank, but it was set aside as the welds were found to be faulty. Repair techniques were developed, and the tank re-entered production and will be proof tested for strength, for use on Artemis III.
Construction of core stage
In mid-November 2014, construction of the first core stage hardware began using a new friction stir welding system in the South Vertical Assembly Building at NASA's Michoud Assembly Facility. Between 2015 and 2017, NASA test fired RS-25 engines in preparation for use on SLS.
The core stage for the first SLS, built at Michoud Assembly Facility by Boeing, had all four engines attached in November 2019,[95] and it was declared finished by NASA in December 2019.[96]
The first core stage left Michoud Assembly Facility for comprehensive testing at Stennis Space Center in January 2020.[97] The static firing test program at Stennis Space Center, known as the Green Run, operated all the core stage systems simultaneously for the first time.[98][99] Test 7 (of 8), the wet dress rehearsal, was carried out in December 2020 and the fire (test 8) took place on January 16, 2021, but shut down earlier than expected,[100] about 67 seconds in total rather than the desired eight minutes. The reason for the early shutdown was later reported to be because of conservative test commit criteria on the thrust vector control system, specific only for ground testing and not for flight. If this scenario occurred during a flight, the rocket would have continued to fly normally. There was no sign of damage to the core stage or the engines, contrary to initial concerns.[101]
The second fire test was completed on March 18, 2021, with all four engines igniting, throttling down as expected to simulate in-flight conditions, and gimballing profiles. The core stage was shipped to Kennedy Space Center to be mated with the rest of the rocket for Artemis I. It left Stennis on April 24 and arrived at Kennedy on April 27.[102] It was refurbished there in preparation for stacking.[103] On June 12, 2021, NASA announced the assembly of the first SLS rocket was completed at the Kennedy Space Center. The assembled SLS was used for the uncrewed Artemis I mission in 2022.
The first SLS, for Artemis I, launched an Orion spacecraft into a lunar orbit on a test flight in fall 2022,[104] and NASA and Boeing are constructing the next three rockets for Artemis II, Artemis III, and Artemis IV. Boeing stated in July 2021 that while the COVID-19 pandemic had affected their suppliers and schedules, such as delaying parts needed for hydraulics, they would still be able to provide the Artemis II SLS core stage per NASA's schedule, with months to spare. The spray-on foam insulation process for Artemis II was automated for most sections of the core stage, saving 12 days in the schedule. The Artemis II forward skirt, the foremost component of the core stage, was affixed on the liquid oxygen tank in late May 2021. By September 25, 2023, the core stage was functionally complete, as all sections were assembled and the four RS-25 engines had been installed.[105] The complete core stage was set to ship to NASA in late fall 2023,[106][107] eight months later than was predicted originally.[108] The complete core stage was delivered in July 2024.[109] For Artemis III, assembly of elements of the thrust structure began at Michoud Assembly Facility in early 2021. By August 2025, the thrust structure was completed and moved to storage in the Vehicle Assembly Building at Kennedy, to await the rest of the stage's arrival in mid-2026.[110] The liquid hydrogen tank for Artemis III was originally planned to be the Artemis I tank, but it was set aside as the welds were found to be faulty. Repair techniques were developed, and the tank re-entered production and will be proof tested for strength, for use on Artemis III.
Launches
Originally planned for late 2016, the uncrewed first flight of SLS slipped more than twenty-six times and almost six years. As of earlier that month, the first launch was originally scheduled for 8:30 am EDT, August 29, 2022.[117] It was postponed to 2:17 pm EDT (18:17 UTC), September 3, after the launch director called a scrub due to a temperature sensor falsely indicating that an RS-25 engine's hydrogen bleed intake was too warm. The September 3 attempt was then scrubbed due to a hydrogen leak in the tail service mast quick disconnect arm, which was fixed; the next launch option was at first a period in late October and then a launch in mid-November, due to unfavorable weather during Hurricane Ian.[118] It launched on November 16.[119][120]
NASA originally limited the amount of time the solid rocket boosters can remain stacked to "about a year" from the time two segments are joined. The first and second segments of the Artemis I boosters were joined on January 7, 2021. NASA could choose to extend the time limit based on an engineering review. On September 29, 2021, Northrop Grumman indicated that the limit could be extended to eighteen months for Artemis I, based on an analysis of the data collected when the boosters were being stacked; an analysis weeks before the actual launch date later extended that to December 2022 for the boosters of Artemis I, almost two years after stacking.[121]
In late 2015, the SLS program was stated to have a 70% confidence level for the first Orion flight that carries crew, the second SLS flight overall, to happen by 2023;[122][123][124] however, the flight did not take place until 2026.[125]
Usage beyond Artemis
Efforts have been made to expand the Artemis missions to launching NASA's robotic space probes and observatories. However, SLS program officials have noted that between the launch cadence of Artemis missions and supply chain constraints, it is unlikely that rockets could be built to support science missions before the late 2020s or early 2030s.[126]
Another challenge is that the large solid-rocket boosters produce significant vibrations, which can damage sensitive scientific instruments. During wind-tunnel testing, torsional load values (a measurement of twisting and vibration) were nearly double initial estimates.[127] Although program officials later acknowledged the issue, they expressed confidence in their ability to mitigate it.[126]
As of October 2024, NASA has studied using SLS for Neptune Odyssey,[128][129] Europa Lander,[130][131][132] Enceladus Orbilander, Persephone,[133] HabEx,[134] Origins Space Telescope,[135] LUVOIR,[136] Lynx,[137] and Interstellar probe.[138]
Initially, Congress mandated that NASA use the SLS to launch the Europa Clipper probe. However, concerns about the SLS's availability led NASA to seek congressional approval for competitive launch bids. SpaceX ultimately won the contract, saving the agency an estimated US$2 billion in direct launch costs over SLS, albeit at the cost of a longer flight.[127]
After the launch of Artemis IV, NASA plans to transfer production and launch operations of SLS to Deep Space Transport LLC, a joint venture between Boeing and Northrop Grumman. The agency hopes the companies can find more buyers for flights on the rocket to bring costs per flight down to $1 billion. However, finding a market for the large and costly rocket will be difficult. Reuters reported that the US Department of Defense, long considered a potential customer, stated in 2023 that it has no interest in the rocket as other launch vehicles already offer them the capability that they need at an affordable price.
Usage beyond Artemis
Efforts have been made to expand the Artemis missions to launching NASA's robotic space probes and observatories. However, SLS program officials have noted that between the launch cadence of Artemis missions and supply chain constraints, it is unlikely that rockets could be built to support science missions before the late 2020s or early 2030s.[126]
Another challenge is that the large solid-rocket boosters produce significant vibrations, which can damage sensitive scientific instruments. During wind-tunnel testing, torsional load values (a measurement of twisting and vibration) were nearly double initial estimates.[127] Although program officials later acknowledged the issue, they expressed confidence in their ability to mitigate it.[126]
As of October 2024, NASA has studied using SLS for Neptune Odyssey,[128][129] Europa Lander,[130][131][132] Enceladus Orbilander, Persephone,[133] HabEx,[134] Origins Space Telescope,[135] LUVOIR,[136] Lynx,[137] and Interstellar probe.[138]
Initially, Congress mandated that NASA use the SLS to launch the Europa Clipper probe. However, concerns about the SLS's availability led NASA to seek congressional approval for competitive launch bids. SpaceX ultimately won the contract, saving the agency an estimated US$2 billion in direct launch costs over SLS, albeit at the cost of a longer flight.[127]
After the launch of Artemis IV, NASA plans to transfer production and launch operations of SLS to Deep Space Transport LLC, a joint venture between Boeing and Northrop Grumman. The agency hopes the companies can find more buyers for flights on the rocket to bring costs per flight down to $1 billion. However, finding a market for the large and costly rocket will be difficult. Reuters reported that the US Department of Defense, long considered a potential customer, stated in 2023 that it has no interest in the rocket as other launch vehicles already offer them the capability that they need at an affordable price.
Criticism
The SLS has been criticized based on program cost, lack of commercial involvement, and non-competitiveness caused by legislation requiring the use of Space Shuttle components "where possible".[139]
Funding
As the Space Shuttle program drew to a close in 2009, the Obama administration convened the Augustine Commission to assess NASA's future human spaceflight endeavors. The commission's findings were stark: NASA's proposed Ares V rocket, intended for lunar and Martian missions, was unsustainable and should be canceled. The administration further advocated for a public-private partnership, where private companies would develop and operate spacecraft, and NASA would purchase launch services on a fixed-cost basis.
The recommendations faced fierce opposition from senators representing states with significant aerospace industries. In response, in 2011, Congress mandated the development of the SLS. The program was characterized by a complex web of political compromises, ensuring that various regions and interests benefited, maintaining jobs and contracts for existing space shuttle contractors.[140][141] Utah Senator Orrin Hatch ensured the new rocket used the Shuttle's solid boosters, which were manufactured in his state. Alabama Senator Richard Shelby insisted that the Marshall Space Flight Center design and test the rocket. Florida Senator Bill Nelson brought home billions of dollars to Kennedy Space Center to modernize its launch facilities.[142][143]
Almost immediately, Representative Tom McClintock called on the Government Accountability Office to investigate possible violations of the Competition in Contracting Act, arguing that the requirement that Shuttle components be used on SLS were non-competitive and assured contracts to existing suppliers.
The Obama administration's 2014 budget called for canceling SLS and turning over space transportation to commercial companies. The White House sent Lori Garver, the NASA deputy administrator, along with astronaut Sally Ride and other experts to defend the proposal, saying the SLS program was too slow and wasteful. However, Senators Shelby and Nelson quickly moved to fight efforts to cut the program and were ultimately victorious. After retirement from NASA, Garver would go on to recommend cancellation of the SLS.[144]
During the First Trump administration, NASA administrator Jim Bridenstine suggested to a Senate committee that the agency was considering using the Falcon Heavy or Delta IV Heavy rocket to launch Orion instead of SLS. Afterward, the administrator was reportedly called into a meeting with Senator Shelby, who told Bridenstine he should resign for making the suggestion in a public meeting.
In 2023, Cristina Chaplain, former assistant director of the GAO, expressed doubts about reducing the rocket's cost to a competitive threshold, "just given the history and how challenging it is to build."
Management
In 2019, the Government Accountability Office (GAO) noted that NASA had assessed the performance of contractor Boeing positively, though the project had experienced cost growth and delay. A March 2020 report by Office of Inspector General found NASA moved out $889 million of costs relating to SLS boosters, but did not update the SLS budget to match. This kept the budget overrun to 15% in FY 2019; an overrun of 30% would have required NASA to request additional funding from the U.S. Congress The Inspector General report found that were it not for this "masking" of cost, the overrun would have been 33% by FY 2019. The GAO stated "NASA's current approach for reporting cost growth misrepresents the cost performance of the program".
Proposed alternatives
In 2009, the Augustine commission proposed a commercial 75 t launcher for lunar exploration. In 2011–2012, the Space Access Society, Space Frontier Foundation, and The Planetary Society called for the cancellation of the project, arguing that the SLS would consume the funds for other projects from the NASA budget. U.S. Representative Dana Rohrabacher and others proposed the development of an orbital propellant depot and the acceleration of the Commercial Crew Development program as an alternative to the SLS program.
An unpublished NASA study and another from the Georgia Institute of Technology found these approaches could have lower costs. In 2012, United Launch Alliance also suggested using existing rockets with on-orbit assembly and propellant depots as needed. In 2019, a former ULA employee alleged that Boeing viewed orbital refueling technology as a threat to the SLS and blocked investment in the technology. In 2010, SpaceX's CEO Elon Musk claimed that his company could build a launch vehicle in the 140–150 t payload range for $2.5 billion, or $300 million (in 2010 dollars) per launch, not including a potential upper-stage upgrade.
Former NASA Administrator Charlie Bolden, expressed that the SLS could be replaced in the future in an interview with Politico in September 2020. Bolden said that the "SLS will go away ... because at some point commercial entities are going to catch up." Bolden further stated, "They are really going to build a heavy-lift launch vehicle sort of like SLS that they will be able to fly for a much cheaper price than NASA can do SLS. That's just the way it works."
Shortly after the New Glenn 9×4 rocket variant was announced in November 2025, journalist Eric Berger noted that it would offer lift capacity approaching that of the SLS Block 1 while retaining a reusable first stage and a larger payload fairing, and could cost less than one-tenth as much per launch.[145]
See also
- Austere Human Missions to Mars
- Comparison of orbital launch systems
- Criticism of the Space Shuttle program
- DIRECT, proposals prior to SLS
- Shuttle-Derived Heavy Lift Launch Vehicle, a 2009 concept launch vehicle
- Ares V, a 2000s cargo vehicle design for the Constellation Program
- National Launch System, 1990s
- Saturn rocket family, 1960s
- Starship HLS, lunar variant of super heavy-lift vehicle Starship
- Studied Space Shuttle Variations and Derivatives
External links
- Space Launch System and Multi-Purpose Crew Vehicle page on NASA.gov
- "Preliminary Report on Multi-Purpose Crew Vehicle and Space Launch System" (PDF), NASA
- SLS Future Frontiers video
- Video animations of mission to asteroid, the Moon, and Mars, beyondearth.com
- "NASA Continues Journey to Mars Planning", spacepolicyonline.com
References
- NASA. Space Launch System Core Stage nasa.gov, October 27, 2021, retrieved November 19, 2022^
- SLS October 2015 Fact Sheet retrieved November 19, 2022^
- 2018 draft factsheet of SLS capabilities NASA, August 20, 2018, retrieved August 24, 2022^
- 2024 update on SLS status NASA, retrieved May 16, 2025^
- The results are in… *drumroll* 🥁 Core stage weighs a total of 215,910 pounds! When full of propellant, core stage will weigh over 2 million pounds. Using the Vehicle Assembly Building high bay crane and a secondary crane, Exploration Ground Systems teams lifted the @NASA_SLS core stage for @NASAArtemis II approximately 6 inches from its current mounts. Teams repeated the lift, weighing the core stage twice to ensure an exact weight reading was achieved. retrieved October 3, 2024^
- --> | vac: 2,049,200 lbf }} | SI = | burntime = 480 seconds | fuel = LH2 / LOX }} {{Infobox rocket/Stage | type = stage | diff = | stageno = Second | name = ICPS | length = {{cvt|13.7|m}} | diameter = {{Unbulleted indent list | LH2 tank: {{cvt|5|m}} | LOX tank: {{cvt|3.2|m}} {{cite web|url=https://www.ulalaunch.com/docs/default-source/rockets/delta-iv-user%27s-guide.pdf|title=Delta IV Launch Services User's Guide|publisher=United Launch Alliance|access-date=April 13, 2024|archive-date=September 21, 2018|archive-url=https://web.archive.org/web/20180921034929/https://www.ulalaunch.com/docs/default-source/rockets/delta-iv-user%27s-guide.pdf|url-status=live}}^
- Lee Kanayama. As Centaur turns 60 years old, ULA prepares to evolve Centaur V NASASpaceFlight.com, May 9, 2022, retrieved May 29, 2022^
- Eugen Reich. Raketen: Die Internationale Enzyklopädie Motorbuch Verlag, 2020^
- United Launch Alliance Selects Aerojet Rocketdyne's RL10 Engine ULA, May 11, 2018, retrieved May 13, 2018^
- Jeff Foust. New RL10 engine to be introduced on Vulcan in 2025 SpaceNews, November 28, 2023, retrieved December 23, 2024^
- RL10 Propulsion System Datasheet L3Harris, retrieved December 23, 2024^
- Vulcan Launch Systems User's Guide United Launch Alliance, October 16, 2023, retrieved October 1, 2024^
- Elisha Sauers. Is SLS still the most powerful rocket? 5 facts as Artemis 2 rolls out Mashable, 2026-01-17, retrieved 2026-04-15^
- Space Launch System (SLS) Fact Sheet NASA, retrieved 2026-04-07^
- SLS Space Launch System Secondary Payloads NASA, retrieved 2026-04-07^
- Heavy-Lift Launch Vehicle Capability NASA, retrieved 2026-04-07^
- Steve Creech. Progress on Enabling Unprecedented Payloads for Space in the 21st Century 2010-01-01^
- "Artemis mission plan"^
- Loren Grush. NASA Overhauls Moon Mission in Effort to Cut Risks and Costs Bloomberg News, February 27, 2026, retrieved March 2, 2026^
- Jackie Wattles. NASA abruptly changes its roadmap to putting boots back on the moon CNN, February 27, 2026, retrieved March 2, 2026^
- NASA Adds Mission to Artemis Lunar Program, Updates Architecture - NASA retrieved March 2, 2026^
- Stephen Clark. NASA just swapped a 10-year-old Artemis II engine with one nearly twice its age Ars Technica, April 30, 2025, retrieved March 4, 2026^
- LaToya Dean. NASA Tests New RS-25 Engine NASA, June 23, 2025, retrieved June 28, 2025^
- Teledyne to Build NASA's $60 Million Launch Vehicle Stage Adapter retrieved April 1, 2023^
- Teledyne Brown Engineering Awarded $85 Million NASA Contract to Provide Key Stage of NASA's Space Launch System Vehicle Returning Astronauts to the Moon www.teledyne.com, retrieved May 31, 2023^
- Beverly Perry. We've Got (Rocket) Chemistry, Part 2 Rocketology: NASA’s Space Launch System, National Aeronautics and Space Administration, April 21, 2016, retrieved September 30, 2022^
- Stephen Clark. NASA tested a new SLS booster that may never fly, and the end of it blew off Ars Technica, June 26, 2025, retrieved June 28, 2025^
- Rosenberg, Zach. "Delta second stage chosen as SLS interim". Flight International, May 8, 2012.^
- Eric Berger. NASA shakes up its Artemis program to speed up lunar return Ars Technica, February 27, 2026, retrieved February 2, 2026^
- Charles Boyer. NASA Formally Selects ULA's Centaur V For Artemis IV and V TalkOfTitusville.com, March 6, 2026, retrieved March 24, 2026^
- Space Launch System Lift Capabilities NASA, April 29, 2020, retrieved August 29, 2024^
- Marcia Smith. New NASA Crew Transportation System to Cost US$18 Billion Through 2017 Space Policy Online, September 14, 2011, retrieved September 15, 2011^
- Future of NASA Space Program Cspan.org, September 14, 2011, retrieved March 25, 2015^
- Independent Cost Assessment of the Space Launch System, Multi-purpose Crew Vehicle and 21st Century Ground Systems Programs: Executive Summary of Final Report Booz Allen Hamilton, August 19, 2011, retrieved March 3, 2012^
- Andy Paszior. White House Experiences Sticker Shock Over NASA's Plans The Wall Street Journal, September 7, 2011, retrieved February 22, 2015^
- ESD Integration, Budget Availability Scenarios Space Policy Online, August 19, 2011, retrieved September 15, 2011^
- Marcia Smith. The NASA Numbers Behind That WSJ Article Space Policy Online, September 9, 2011, retrieved September 15, 2011^
- HEFT Phase I Closeout nasawatch.com, September 2010, retrieved March 25, 2012^
- NASA's huge new rocket may cost US$500 million per launch NBC News, September 12, 2012, retrieved November 13, 2019^
- Roop. NASA defends Space Launch System against charge it 'is draining the lifeblood' of space program al.com, July 29, 2013, retrieved February 18, 2015^
- John Strickland. Revisiting SLS/Orion launch costs The Space Review, July 15, 2013, retrieved February 18, 2015^
- NASA Signs Agreement for a European-Provided Orion Service Module NASA, April 12, 2015^
- Jason Davis. NASA Budget Lists Timelines, Costs and Risks for First SLS Flight The Planetary Society, retrieved March 11, 2015^
- NASA's Management of the Space Launch System Stages Contract oig.nasa.gov, NASA Office of Inspector General Office of Audits, October 10, 2018, retrieved October 14, 2018^
- NASA FY 2019 Budget Estimates nasa.gov, retrieved December 16, 2018^
- Rich Smith. Is NASA Preparing to Cancel Its Space Launch System? The Motley Fool, March 26, 2019, retrieved May 15, 2019^
- ''“FY 2021 President's Budget Request Summary” (PDF). NASA. Retrieved October 31, 2022.'' Archived (PDF) from the original on October 31, 2022. This article incorporates text from this source, which is in the public domain.^
- ''“FY 2023 President's Budget Request Summary” (PDF). NASA. Retrieved June 6, 2024.'' Archived (PDF) from the original on June 6, 2024. This article incorporates text from this source, which is in the public domain. ^
- ''“FY 2024 President's Budget Request Summary” (PDF). NASA. Retrieved June 6, 2024.'' Archived (PDF) from the original on June 6, 2024. This article incorporates text from this source, which is in the public domain. ^
- FY 2025 President's Budget Request Summary National Aeronautics and Space Administration, retrieved August 22, 2025^
- FY 2026 President's Budget Request Summary National Aeronautics and Space Administration, retrieved August 22, 2025^
- Definitive Contract NNM12AA82C govtribe.com, retrieved December 16, 2018^
- FY 2008 Budget Estimates NASA, retrieved June 23, 2016^
- Brooks Mendenhall. "One Big Beautiful Bill" sets stage for NASA's return to the Moon Astronomy Magazine, July 9, 2025, retrieved September 12, 2025^
- Eric Berger. Congress and Trump may compromise on the SLS rocket by axing its costly upper stage Ars Technica, September 8, 2025, retrieved September 12, 2025^
- “Consolidated Appropriations Act, 2016’" (PDF). p.63. Archived from the original October 31, 2022. Retrieved October 31, 2022. This article incorporates text from this source, which is in the public domain.^
- NASA outlines plan for 2024 lunar landing SpaceNews, May 1, 2019, retrieved May 15, 2019^
- Eric Berger. NASA's full Artemis plan revealed: 37 launches and a lunar outpost Ars Technica, May 20, 2019, retrieved May 20, 2019^
- Philip Sloss. Amid competing priorities, Boeing redesigns NASA SLS Exploration Upper Stage NASASpaceFlight.com, December 18, 2019, retrieved July 25, 2020^
- ''“National Aeronautics and Space Administration FY 2021 Spending Plan” (PDF) June Update. NASA. Retrieved January 3, 2023. Archived from the original January 3, 2023. This article incorporates text from this source, which is in the public domain.''^
- “National Aeronautics and Space Administration FY 2022 Spending Plan" (PDF). NASA. Retrieved January 3, 2023. Archived from the original on January 3, 2023. This article incorporates text from this source, which is in the public domain.^
- NASA Announces Key Decision For Next Deep Space Transportation System NASA, May 24, 2011, retrieved January 26, 2012^
- Press Conference on the Future of NASA Space Program C-Span, September 14, 2011, retrieved September 14, 2011^
- Chang. NASA Unveils New Rocket Design The New York Times, September 14, 2011, retrieved September 14, 2011^
- Cowing. NASA's New Space Launch System Announced – Destination TBD SpaceRef, September 14, 2011, retrieved January 26, 2012^
- Morring. NASA Will Compete Space Launch System Boosters Aviation Week, June 17, 2011, retrieved June 20, 2011^
- SLS Block II drives hydrocarbon engine research thespacereview.com, January 14, 2013, retrieved September 13, 2013^
- NASA's Space Launch System: Partnering For Tomorrow NASA, retrieved March 12, 2013^
- The Dark Knights – ATK's Advanced Boosters for SLS revealed NASASpaceFlight.com, January 14, 2013, retrieved September 10, 2013^
- Hutchinson. New F-1B rocket engine upgrades Apollo-era design with 1.8M lbs of thrust Ars Technica, April 15, 2013, retrieved April 15, 2013^
- Second SLS Mission Might Not Carry Crew SpaceNews, May 21, 2014, retrieved July 25, 2014^
- Wind Tunnel testing conducted on SLS configurations, including Block 1B NASASpaceFlight.com, July 2012, retrieved November 13, 2012^
- NASA's Space Launch System Program PDR: Answers to the Acronym NASA, August 1, 2013, retrieved August 3, 2013^
- NASA Completes Key Review of World's Most Powerful Rocket in Support NASA, April 15, 2015, retrieved October 26, 2015^
- Chris Gebhardt. SLS upper stage proposals reveal increasing payload-to-destination options NASASpaceFlight.com, November 13, 2013, retrieved November 18, 2013^
- David Todd. SLS design may ditch J-2X upper stage engine for four RL-10 engines Seradata, June 3, 2013^
- David Todd. Next Steps for SLS: Europe's Vinci is a contender for Exploration Upper-Stage Engine Seradata, November 7, 2014^
- Eric Berger. NASA rejects Blue Origin's offer of a cheaper upper stage for the SLS rocket Ars Technica, November 5, 2019, retrieved December 19, 2019^
- Redacted_EUS.pdf sam.gov, October 31, 2019, retrieved October 6, 2021^
- Eric Berger. NASA shakes up its Artemis program to speed up lunar return Ars Technica, February 27, 2026, retrieved March 28, 2026^
- NASA and ATK Successfully Test Ares First Stage Motor NASA, September 10, 2009, retrieved January 30, 2012^
- NASA and ATK Successfully Test Five-Segment Solid Rocket Motor NASA, August 31, 2010, retrieved January 30, 2012^
- NASA Successfully Tests Five-Segment Solid Rocket Motor NASA, August 31, 2010, retrieved September 8, 2011^
- Chris Bergin. QM-1 shakes Utah with two minutes of thunder NASASpaceFlight.com, March 10, 2015, retrieved March 10, 2015^
- Orbital ATK Successfully Tests the World's Largest Solid Rocket Motor Northrop Grumman, June 28, 2016, retrieved October 11, 2021^
- Eric Berger. Boeing has informed its employees that NASA may cancel SLS contracts Ars Technica, February 7, 2025, retrieved February 7, 2025^
- Eric Berger. White House budget seeks to end SLS, Orion, and Lunar Gateway programs Ars Technica, May 2, 2025, retrieved May 2, 2025^
- Jennifer M. Dooren, Bethany Stevens. President Trump's FY26 Budget Revitalizes Human Space Exploration NASA, May 2, 2025, retrieved May 2, 2025^
- Fiscal Year 2026 Discretionary Budget Request United States Office of Management and Budget, May 2, 2025, retrieved May 2, 2025^
- Eric Berger. NASA chooses not to tell Congress how much deep space missions cost arstechnica.com, October 20, 2017, retrieved December 16, 2018^
- The NASA Authorization Act of 2010 Featured Legislation, U.S. Senate, July 15, 2010, retrieved May 26, 2011^
- Karl Tate. Space Launch System: NASA's Giant Rocket Explained Space.com, September 16, 2011, retrieved January 26, 2012^
- SLS Upper Stage set to take up residence in the former home of ISS modules July 2017 July 11, 2017, retrieved February 15, 2020^
- Jennifer Harbaugh. Meet the Interim Cryogenic Propulsion Stage for SLS NASA, November 8, 2018^
- All Four Engines Are Attached to the SLS Core Stage for Artemis I Mission NASA, November 8, 2019, retrieved November 12, 2019^
- Stephen Clark. NASA declares first SLS core stage complete Spaceflight Now, December 15, 2019, retrieved October 7, 2021^
- Paul Rincon. Nasa Moon rocket core leaves for testing BBC News, January 9, 2020, retrieved January 9, 2020^
- Boeing, NASA getting ready for SLS Core Stage Green Run campaign ahead of Stennis arrival NASASpaceFlight.com, December 14, 2019, retrieved January 9, 2020^
- NASA Will Have 8 Minute Hold Down Test in 2020 Next Big Future, retrieved August 2, 2019^
- Jeff Foust. Green Run hotfire test ends early SpaceNews, January 16, 2021, retrieved January 17, 2021^
- Paul Rincon. SLS: NASA finds cause of 'megarocket' test shutdown BBC News, January 20, 2021, retrieved January 20, 2021^
- Brian Dunbar. Space Launch System Core Stage Arrives at the Kennedy Space Center NASA, April 29, 2021, retrieved June 1, 2021^
- Philip Sloss. SLS Core Stage thermal protection system refurbishment in work at Kennedy for Artemis 1 NASASpaceFlight.com, May 20, 2021, retrieved May 26, 2021^
- Former NASA Official: Moon launch this month may be "embarrassing" The Byte, August 25, 2022, retrieved September 15, 2022^
- Lee Mohon. All Engines Added to NASA's Artemis II Moon Rocket Core Stage – Artemis NASA Blogs, September 25, 2023, retrieved September 25, 2023^
- Stephen Clark. Rocket Report: Iran launches satellite; Artemis II boosters get train ride Ars Technica, September 29, 2023, retrieved October 2, 2023^
- Philip Sloss. Artemis II Moon mission transitioning from planning to preparation NASASpaceFlight.com, May 2, 2023, retrieved June 6, 2023^
- Philip Sloss. Boeing aiming to deliver second SLS Core Stage to NASA in March NASASpaceFlight.com, July 25, 2022, retrieved July 30, 2022^
- Boeing delivers second stage of SLS rocket to NASA - AGN Boeing delivers second stage of SLS rocket to NASA July 17, 2024^
- NASA Communications team. NASA Begins Processing Artemis III Moon Rocket at Kennedy NASA, August 18, 2025, retrieved August 18, 2025^
- Chris Bergin. Exploration Mission 1: SLS and Orion mission to the Moon outlined NASASpaceFlight.com, NASASpaceFlight, February 29, 2012, retrieved September 2, 2022^
- Nasa scrambles to fix Moon rocket issues ahead of Artemis launch – live The Independent, August 29, 2022, retrieved August 29, 2022^
- Ashley Strickland. Today's Artemis I launch has been scrubbed after engine issue CNN, August 29, 2022, retrieved August 29, 2022^
- Jeff Foust. First Artemis 1 launch attempt scrubbed SpaceNews, August 29, 2022, retrieved August 29, 2022^
- Jeff Foust. Second Artemis 1 launch attempt scrubbed SpaceNews, September 3, 2022, retrieved September 4, 2022^
- Rachel Kraft. NASA Adjusts Dates for Artemis I Cryogenic Demonstration Test and Launch; Progress at Pad Continues NASA, September 12, 2022, retrieved September 16, 2022^
- Weather remains 70% Favorable, Teams on Track to Begin Countdown Saturday – Artemis August 26, 2022, retrieved August 27, 2022^
- Rachel Kraft. Artemis I Launch Attempt Scrubbed NASA Blogs, September 3, 2022, retrieved September 3, 2022^
- SLS Artemis I Mission RocketLaunch.org, November 16, 2022, retrieved March 27, 2024^
- Joey Roulette, Steve Gorman. NASA's next-generation Artemis mission heads to moon on debut test flight Reuters, November 16, 2022, retrieved November 16, 2022^
- SLS returns to the pad for next Artemis launch attempt November 4, 2022, retrieved November 16, 2022^
- Jeff Foust. First Crewed Orion Mission May Slip to 2023 SpaceNews, September 16, 2015, retrieved June 23, 2016^
- Stephen Clark. Orion spacecraft may not fly with astronauts until 2023 Spaceflight Now, September 16, 2015, retrieved June 23, 2016^
- Smith Clark. Mikulski "Deeply Troubled" by NASA's Budget Request; SLS Won't Use 70 Percent JCL spacepolicyonline.com, May 1, 2014, retrieved June 23, 2016^
- William Harwood. NASA launches Artemis II crew on flight around the moon. Here's everything to know about the mission. CBS News, retrieved April 4, 2026^
- Jeff Foust. Supply chain, Artemis program limit SLS use for science missions SpaceNews, July 8, 2021, retrieved November 27, 2024^
- Eric Berger. SpaceX to launch the Europa Clipper mission for a bargain price Ars Technica, July 23, 2021, retrieved November 28, 2021^
- Jamie Carter. The $3.4 Billion Plan For NASA To Explore 'Pluto's Twin' And The Rings Of Neptune Then Execute A 'Death Dive' Forbes, September 27, 2021, retrieved October 13, 2021^
- Abigail M. Rymer, Kirby D. Runyon, Brenda Clyde, Jorge I. Núñez, Romina Nikoukar, Krista M. Soderlund, Kunio Sayanagi, Mark Hofstadter. Neptune Odyssey: A Flagship Concept for the Exploration of the Neptune–Triton System The Planetary Science Journal, September 8, 2021^
- Jeff Foust. Europa lander work continues despite budget uncertainty SpaceNews, March 31, 2017, retrieved March 31, 2017^
- Jeff Foust. Final fiscal year 2019 budget bill secures US$21.5 billion for NASA SpaceNews, February 17, 2019^
- Europa Lander Mission Concept Overview Grace Tan-Wang, Steve Sell, Jet Propulsion Laboratory, NASA, AbSciCon2019, Bellevue, Washington. June 26, 2019^
- Stephen Clark. Five years after New Horizons flyby, scientists assess next mission to Pluto Spaceflightnow, July 14, 2020, retrieved October 13, 2021^
- Section 9-11 9.4.1 Basis of estimate, p. 281. Habitable Exoplanet Observatory Final Report Jet Propulsion Laboratory, August 25, 2019, retrieved May 11, 2020^
- Origins Space Telescope Mission Concept Study Report October 11, 2019, retrieved May 14, 2020^
- Ethan Siegel. New Space Telescope, 40 Times The Power Of Hubble, To Unlock Astronomy's Future Forbes, September 19, 2017, retrieved October 13, 2021^
- Lynx X-Ray Observatory NASA, retrieved October 13, 2021^
- Lee Billings. Proposed Interstellar Mission Reaches for the Stars, One Generation at a Time Scientific American, November 12, 2019, retrieved October 13, 2021^
- Christian Davenport. Relief and pride as NASA's huge SLS rocket finally flies The Washington Post, November 16, 2022, retrieved July 29, 2023^
- David W. Brown. NASA's Last Rocket The New York Times, March 17, 2021, retrieved August 29, 2024^
- Christian Davenport. Relief and pride as NASA's huge SLS rocket finally flies Washington Post, November 16, 2022, retrieved August 29, 2024^
- Eric Berger. How I learned to stop worrying and love the big $60B NASA rocket Ars Technica, September 9, 2016, retrieved August 28, 2024^
- Eric Berger. Congress apparently feels a need for "reaffirmation" of SLS rocket Ars Technica, July 10, 2024, retrieved August 28, 2024^
- Jeff Foust. Garver: NASA Should Cancel SLS and Mars 2020 Rover SpaceNews, January 3, 2014^
- Eric Berger. Blue Origin revealed some massively cool plans for its New Glenn rocket Ars Technica, November 20, 2025, retrieved November 20, 2025^
- <ref name="SFF-20110915"> Ferris Valyn. Monster Rocket Will Eat America's Space Program Space Frontier Foundation, September 15, 2011, retrieved September 16, 2011^
- Congressman, Space Frontier Foundation, And Tea Party In Space Call For NASA SLS Investigation moonandback.com, October 4, 2011, retrieved October 20, 2011^
- The Senate Launch System Competitive Space Task Force, October 4, 2011, retrieved October 20, 2011^
- Vanderbilt. Impossibly High NASA Development Costs Are Heart of the Matter moonandback.com, September 15, 2011, retrieved January 26, 2012^
- Garver: NASA Should Cancel SLS and Mars 2020 Rover Space News, January 2014, retrieved August 25, 2015^
- Bolden talks expectations for Biden's space policy Politico, 2020, retrieved September 11, 2020^
- Review of U.S. Human Space Flight Plans Committee. Seeking A Human Spaceflight Program Worthy of A Great Nation NASA, October 2009, retrieved April 15, 2010^
- Statement before the Committee on Science, Space, and Technology US House of Representatives Hearing: A Review of the NASA's Space Launch System The Planetary Society, July 12, 2011, retrieved January 26, 2012^
- Dana Rohrabacher. Nothing New or Innovative, Including It's Astronomical Price Tag September 14, 2011, retrieved September 14, 2011^
- Doug Messier. Rohrabacher calls for "emergency" funding for CCDev Parabolic Arc, parabolicarc.com, August 24, 2011, retrieved September 15, 2011^
- Foust. A monster rocket, or just a monster? The Space Review, September 15, 2011, retrieved October 20, 2011^
- Doug Mohney. Did NASA Hide In-space Fuel Depots To Get a Heavy Lift Rocket? Satellite Spotlight, October 21, 2011, retrieved November 10, 2011^
- Propellant Depot Requirements Study HAT Technical Interchange Meeting, July 21, 2011, retrieved May 25, 2012^
- Keith Cowing. Internal NASA Studies Show Cheaper and Faster Alternatives to the Space Launch System SpaceRef, October 12, 2011, retrieved November 10, 2011^
- Near Term Space Exploration with Commercial Launch Vehicles Plus Propellant Depot Georgia Institute of Technology / National Institute of Aerospace, September 2, 2010, retrieved March 7, 2012^
- Space Launch System NASA, October 11, 2017, retrieved September 4, 2018^
- New Report Finds Nasa Awarded Boeing Large Fees Despite SLS Launch Slips ArsTechnica, June 19, 2019, retrieved August 1, 2019^
- Space News: Contractors continue to win award fees despite SLS and Orion delays Space News, June 19, 2019, retrieved August 1, 2019^
- SMSR Integrated Master Schedule Office of Safety and Mission Assurance, NASA, June 7, 2021, retrieved June 9, 2021^
- Philip Sloss. NASA, Boeing looking to begin SLS Exploration Upper Stage manufacturing in 2021 Nasaspaceflight, March 4, 2021, retrieved June 23, 2021^
- Kim Henry. Getting to Know You, Rocket Edition: Interim Cryogenic Propulsion Stage nasa.gov, October 30, 2014, retrieved July 25, 2020^
- Foust. Can NASA develop a heavy-lift rocket? The Space Review, November 1, 2011, retrieved October 20, 2011^
- NASA Commits to Future Artemis Missions with More SLS Rocket Engines NASA, May 1, 2020, retrieved May 4, 2020^
- Chris Bergin. SLS requires Advanced Boosters by flight nine due to lack of Shuttle heritage components NASASpaceFlight.com, May 8, 2018, retrieved November 15, 2019^
- Alex Priskos. Five-segment Solid Rocket Motor Development Status ntrs.nasa.gov, NASA, May 7, 2012, retrieved March 11, 2015^
- Space Launch System: How to launch NASA's new monster rocket NASASpaceFlight.com, February 20, 2012, retrieved April 9, 2012^
- Eric Berger. The SLS rocket may have curbed development of on-orbit refueling for a decade Ars Technica, August 1, 2019, retrieved August 5, 2019^
- John K. Jr. Strickland. The SpaceX Falcon Heavy Booster: Why Is It Important? National Space Society, retrieved January 4, 2012^
- Four to Five: Engineer Details Changes Made to SLS Booster Spaceflight Insider, January 10, 2016, retrieved June 9, 2020^
- Affordable Exploration Architecture United Launch Alliance, 2009^
- Bonin. Human spaceflight for less: the case for smaller launch vehicles, revisited The Space Review, June 6, 2011, retrieved September 20, 2011^
- NASA confirms EUS for SLS Block 1B design and EM-2 flight NASASpaceFlight.com, June 6, 2014, retrieved July 24, 2014^
- Jennifer Harbaugh. Space Launch System RS-25 Core Stage Engines NASA, January 29, 2020, retrieved August 29, 2021^
- Philip Sloss. EGS, Jacobs completing first round of Artemis 1 pre-launch integrated tests prior to Orion stacking NASASpaceFlight, September 29, 2021, retrieved September 29, 2021^
- Stephen Clark. NASA's hopes waning for SLS test flight this year Spaceflight Now, August 31, 2021, retrieved September 1, 2021^
- NASA Studies Scaled-Up Falcon, Merlin Aviation Week, December 2, 2010^
- Space Launch System Solid Rocket Booster NASA, February 2021, retrieved August 16, 2022^
- Philip Sloss. NASA, Northrop Grumman designing new BOLE SRB for SLS Block 2 vehicle NASASpaceFlight, July 12, 2021, retrieved August 13, 2021^
- Mark E. Tobias, David R. Griffin, Joshua E. McMillin, Terry D. Haws, Micheal E. Fuller. Booster Obsolescence and Life Extension (BOLE) for Space Launch System (SLS) NASA Technical Reports Server, NASA, March 2, 2019, retrieved November 15, 2019^
- Mark E. Tobias, David R. Griffin, Joshua E. McMillin, Terry D. Haws, Micheal E. Fuller. Booster Obsolescence and Life Extension (BOLE) for Space Launch System (SLS) NASA Technical Reports Server, NASA, April 27, 2020, retrieved August 12, 2021^
- Jeremy J. Redden. SLS Booster Development NASA Technical Reports Server, July 27, 2015, retrieved October 1, 2020^
- Russell T. Vought. Letter to the Chair and Vice Chair of the Senate Appropriations Committee with respect to 10 of the FY 2020 annual appropriations bills White House, retrieved November 13, 2019^
- Eric Berger. NASA does not deny the "over US$2 billion" cost of a single SLS launch Ars Technica, Condé Nest, November 8, 2019, retrieved November 13, 2019^
- Updated FY 2020 Spending Plan NASA, retrieved October 3, 2021^
- FY 2019 Spend Plan NASA, retrieved October 3, 2021^
- FY 2018 Operating Plan NASA, retrieved October 3, 2021^
- FY 2017 Operating Plan NASA, retrieved October 3, 2021^
- FY 2016 Operating Plan (Sept. 4 update) NASA, retrieved October 3, 2021^
- FY 2015 Operating Plan Update (Aug. 2015) NASA, retrieved October 3, 2021^
- FY 2014 Operating Plan NASA, retrieved October 3, 2021^
- FY 2013 Operating Plan NASA, retrieved October 3, 2021^
- FY 2014 Complete Budget Estimates NASA, retrieved October 3, 2021^
- FY 2013 Complete Budget Estimates NASA, retrieved October 3, 2021^
- Space Launch System Spaceflight Insider, September 9, 2018, retrieved October 4, 2021^
- SLS Lift Capabilities and Configurations NASA, April 29, 2020, retrieved January 20, 2021^
- Jennifer Harbaugh. NASA, Public Marks Assembly of SLS Stage with Artemis Day nasa.gov, NASA, December 9, 2019, retrieved December 10, 2019^
- space launch system nasa.gov, 2012^
- Clark. NASA to set exploration architecture this summer Spaceflight Now, March 31, 2011, retrieved May 26, 2011^
- Bergin. SLS finally announced by NASA – Forward path taking shape NASASpaceFlight.com, September 14, 2011, retrieved January 26, 2012^
- NASA Awards Aerojet Rocketdyne $1.79 Billion Contract Modification to Build Additional RS-25 Rocket Engines to Support Artemis Program www.rocket.com, retrieved March 29, 2021^
- NASA's Space Launch System Core Stage Passes Major Milestone, Ready to Start Construction Space Travel, December 27, 2012, retrieved December 27, 2012^
- Bergin. SLS planning focuses on dual phase approach opening with SD HLV NASASpaceFlight.com, April 25, 2011, retrieved January 26, 2012^
- Bergin, Chris. Managers SLS announcement after SD HLV victory NASASpaceFlight.com, June 16, 2011, retrieved January 26, 2012^
- Chris Bergin. Acronyms to Ascent – SLS managers create development milestone roadmap NASASpaceFlight.com, February 23, 2012, retrieved April 9, 2012^
- Public Law 111–267 111th Congress, 42 USC 18322. SEC. 302 (c) (2) 42 USC 18323. SEC. 303 (a) (2) October 11, 2010, retrieved September 14, 2020^
- S.3729 – National Aeronautics and Space Administration Authorization Act of 2010 United States Congress, October 11, 2010, retrieved September 14, 2020^
- Jason Davis. To Mars, with a monster rocket: How politicians and engineers created NASA's Space Launch System The Planetary Society, October 3, 2016, retrieved September 14, 2020^
- William Harwood. NASA unveils new super rocket for manned flights beyond Earth orbit CBS News, September 14, 2011, retrieved September 14, 2020^
- Jeff Foust. NASA inspector general foresees additional SLS/Orion delays SpaceNews, April 13, 2017, retrieved September 14, 2020^
- Stephen Clark. NASA confirms first flight of Space Launch System will slip to 2019 Spaceflight Now, April 28, 2017, retrieved April 29, 2017^
- Stephen Clark. NASA expects first Space Launch System flight to slip into 2020 Spaceflight Now, November 20, 2017, retrieved May 24, 2018^
- Chris Gebhardt. SLS debut slips to April 2021, KSC teams working through launch sims NASASpaceFlight, February 21, 2020, retrieved February 21, 2020^
- Stephen Clark. Hopeful for launch next year, NASA aims to resume SLS operations within weeks May 1, 2020, retrieved May 3, 2020^
- Eric Berger. NASA's big rocket misses another deadline, now won't fly until 2022 Ars Technica, August 31, 2021, retrieved September 1, 2021^
- Philip Sloss. New Artemis 1 schedule uncertainty as NASA EGS ready to continue SLS Booster stacking nasaspaceflight, December 4, 2020, retrieved September 28, 2021^
- Stephen Clark. Stacking complete for SLS boosters Spaceflight Now, March 9, 2021, retrieved September 28, 2021^
- Clark Stephen. NASA proceeds with SLS booster stacking in Florida before core stage arrives Spaceflight Now, January 15, 2021, retrieved September 28, 2021^
- Jennifer Harbaugh. The Great Escape: SLS Provides Power for Missions to the Moon NASA, July 9, 2018, retrieved September 4, 2018^
- NASA'S MANAGEMENT OF SPACE LAUNCH SYSTEM PROGRAM COSTS AND CONTRACTS NASA – Office of Inspector General – Office of Audits, March 10, 2020, retrieved September 14, 2020^
- NASA HUMAN SPACE EXPLORATION: Persistent Delays and Cost Growth Reinforce Concerns over Management of Programs GAO, retrieved September 15, 2020^
- Philip Sloss. Boeing working on multiple Cores, first EUS hardware for Artemis missions 2–4 NASASpaceFlight.com, July 19, 2021, retrieved October 11, 2021^
- Shields up! Spray foam evolving to protect NASA SLS Boeing, July 14, 2021, retrieved October 11, 2021^
- SLS Monthly Highlights February 2020 NASA, February 2020, retrieved October 11, 2021^
- NASA'S SPACE LAUNCH SYSTEM BEGINS MOVING TO THE LAUNCH SITE NASA, April 15, 2020, retrieved October 12, 2021^
- Ben Evans. NASA Orders 18 More RS-25 Engines for SLS Moon Rocket, at $1.79 Billion AmericaSpace, May 2, 2020, retrieved October 13, 2021^
- Philip Sloss. NASA, Aerojet Rocketdyne plan busy RS-25 test schedule for 2021 NASASpaceFlight, December 31, 2020, retrieved October 13, 2021^
- Richard Ballard. Next-Generation RS-25 Engines for the NASA Space Launch System NASA Marshall Space Flight Center, 2017, retrieved October 13, 2021^
- NASA'S MANAGEMENT OF THE ARTEMIS MISSIONS Office of Inspector General (United States), NASA, November 15, 2021, retrieved November 15, 2021^
- NASA FY2021 budget estimates NASA, retrieved September 14, 2020^
- NASA's Ground Systems Development and Operations Program Completes Preliminary Design Review NASA, March 27, 2014, retrieved June 23, 2016^
- Mike Wall. NASA's Artemis 1 moon mission, 1st flight of new megarocket, won't launch until May Space.com, February 24, 2022, retrieved February 25, 2022^
- Philip Sloss. Artemis 1 Orion joins SLS to complete vehicle stack NASASpaceFlight, October 21, 2021, retrieved October 22, 2021^
- Nathan Barker, Chris Gebhardt. NASA moon rocket SLS rolls out to "rebuilt" LC-39B ahead of Artemis 1 rehearsal NASASpaceFlight, March 17, 2022, retrieved March 18, 2022^
- Steven Clark. NASA targets February launch for Artemis 1 moon mission Spaceflight Now, October 22, 2021, retrieved March 18, 2022^
- NASA's Giant Rocket for Deep-Space Travel Passes Key Review Space.com, July 26, 2012, retrieved March 18, 2022^
- Jeff Foust. NASA Says SLS and Orion Will Slip to 2018 Despite Extra Funding SpaceNews, December 10, 2014^
- Jeff Foust. First SLS launch now expected in second half of 2021 SpaceNews, March 2, 2020, retrieved March 19, 2022^
- Neel Patel. The seven most exciting space missions of 2020 MIT Technology Review, December 31, 2019, retrieved March 18, 2022^
- Jason Davis. The anatomy of a delay: Here's a timeline of twists and turns for NASA's SLS and Orion programs The Planetary Society, May 17, 2017, retrieved March 18, 2022^
- Stephen Clark. NASA not planning another Artemis 1 countdown dress rehearsal Spaceflightnow, June 22, 2022, retrieved June 24, 2022^
- Stephen Clark. NASA's moon rocket rolls back to Vehicle Assembly Building for repairs Spaceflight Now, April 26, 2022, retrieved April 26, 2022^
- Artemis I Integrated Testing Update NASA, December 17, 2021, retrieved December 18, 2021^
- The SLS rocket finally has a believable launch date, and it's soon Ars Technica, July 20, 2022, retrieved July 20, 2022^
- NASA Sets Date for Next Launch Attempt for Artemis I Moon Mission NASA, October 12, 2022, retrieved October 13, 2022^
- Teams Confirm No Damage to Flight Hardware, Focus on November for Launch NASA, September 30, 2022, retrieved September 30, 2022^
- NASA Prepares Rocket, Spacecraft Ahead of Tropical Storm Nicole, Re-targets Launch NASA, November 8, 2022, retrieved November 8, 2022^
- Bergin. SLS trades lean towards opening with four RS-25s on the core stage NASASpaceflight.com, October 4, 2011, retrieved January 26, 2012^
- Martin Payne. SLS takes on new buckling standards, drops Super Light alloy NASASpaceFlight.com, February 18, 2013, retrieved June 26, 2023^
- Martin Burkey. A (much) Closer Look at How We Build SLS – Rocketology: NASA's Space Launch System NASA Blogs, June 2, 2016, retrieved June 26, 2023^
- SLS prepares for PDR – Evolution eyes Dual-Use Upper Stage NASASpaceFlight.com, June 2013, retrieved March 12, 2015^
- ''“NASA FY22 Inflation Tables – to be utilized in FY23 ” (Excel). NASA. Retrieved October 31, 2022''. This article incorporates text from this source, which is in the public domain.^
- Fiscal Year 2010 Budget Estimates NASA, retrieved June 23, 2016^
- NASA Announces Design For New Deep Space Exploration System NASA, September 14, 2011, retrieved September 14, 2011^
- Chris Bergin. Advanced Boosters progress towards a solid future for SLS NasaSpaceFlight.com, February 20, 2015, retrieved February 25, 2015^
- Jeff Foust. SLS Debut Likely To Slip to 2018 SpaceNews, August 27, 2014, retrieved March 12, 2015^
- "NASA’s Transition of the Space Launch System to a Commercial Services Contract " oig.nasa.gov. October 12, 2023. Retrieved June 7, 2024.^
- SLS Engine Section Barrel Hot off the Vertical Weld Center at Michoud NASA, retrieved November 16, 2014^
- Lloyd Campbell. NASA conducts 13th test of Space Launch System RS-25 engine SpaceflightInsider.com, March 25, 2017, retrieved April 29, 2017^
- Jeff Foust. Next Artemis 1 launch attempt set for Sept. 3 SpaceNews, August 30, 2022, retrieved August 31, 2022^
- Ashley Strickland. Artemis I launch team is ready for another 'try' on Saturday CNN, Warner Bros Discovery, September 1, 2022, retrieved September 2, 2022^
- Chris Gebhardt. NASA discusses path to SLS repairs as launch uncertainty looms for September, October NASASpaceflight, September 8, 2022, retrieved September 8, 2022^
- Rachel Kraft. Artemis I Managers Wave Off Sept. 27 Launch, Preparing for Rollback – Artemis NASA Blogs, September 24, 2022, retrieved September 24, 2022^
- NASA to Roll Artemis I Rocket and Spacecraft Back to VAB Tonight – Artemis blogs.nasa.gov, September 26, 2022, retrieved September 26, 2022^
- Jeff Foust. SLS to roll back to VAB as hurricane approaches Florida SpaceNews, September 26, 2022, retrieved September 27, 2022^
- SLS core stage fact sheet^
- Sean Sean Potter. NASA Prepares for Space Launch System Rocket Services Contract NASA, July 27, 2022, retrieved August 10, 2022^
- Joey Roulette. Analysis: Boeing, Northrop face obstacles in commercializing flagship US rocket Reuters, June 8, 2023, retrieved June 8, 2023^
- Eric Berger. So long Senator Shelby: Key architect of SLS rocket won't seek reelection Ars Technica, February 9, 2021, retrieved August 28, 2024^
- SLS Core Stage Fact Sheet NASA, retrieved October 4, 2021^
- What is ICPS? United Launch Alliance, June 23, 2021, retrieved October 4, 2021^
- RL10 Engine retrieved July 5, 2021^