New York Marriott Marquis

The New York Marriott Marquis is a Marriott hotel on Times Square, in the Theater District of Midtown Manhattan in New York City, New York, U.S. Designed by architect John C. Portman Jr., the hotel is at 1535 Broadway, between 45th and 46th Streets. It has 1,971 rooms and 101000 sqft of meeting space.

The hotel has two wings, one on 45th Street and one on 46th Street, connected by a podium at ground level. The first two stories contain retail space, while the Marquis Theatre was built within the building's third floor. The hotel's atrium lobby is at the eighth floor and also includes meeting space and restaurants. Thirty-six stories of guestrooms rise above the lobby, overlooking it. The top three stories contain The View, one of New York City's highest restaurants and revolves for a 360° view of the city. An architectural feature of the hotel is its freestanding concrete elevator core, which has twelve glass elevator cabs on its exterior.

Real estate agent Peter Sharp acquired the site in the 1960s with plans to build an office building on the site. The hotel was first announced in 1972 and official plans were released in 1973, but the hotel was postponed after the New York City fiscal crisis in 1975. The hotel was restarted in the late 1970s under mayor Ed Koch. There was extensive controversy over the destruction of five old theaters on the site, and various lawsuits and protests delayed the start of construction until 1982. By the time construction began, Westin had been replaced with Marriott. The hotel opened on September 3, 1985, and has undergone several renovations and modifications since then. By the late 1990s, the hotel was one of the most profitable in the Marriott chain. Marriott bought out Portman's minority ownership stake in 1993 and acquired the underlying site in 2013.

Site

The New York Marriott Marquis is on the west side of Broadway, along Times Square between 45th Street (George Abbott Way) to the south and 46th Street to the north, in the Midtown Manhattan neighborhood of New York City, New York, U.S.[4] The New York City Department of City Planning gives the address as 1535 Broadway. The land lot is irregularly shaped and covers 74,287 ft2, with a frontage of 207.94 ft on Broadway and a depth of 433.94 ft. The Broadway frontage runs diagonally to the 45th and 46th Street frontages. The northern end of the hotel faces Duffy Square.[5]

The sidewalk in front of Broadway was slightly widened when the hotel was built in the 1980s. The widened sidewalk was known as Broadway Plaza.[6][7] As originally proposed, it would have been a pedestrian mall extending across the roadbed of Broadway eastward to Seventh Avenue.[7] M. Paul Friedberg had designed a plaza with benches and barriers,[7] but the plan was ultimately scrapped. In the 2010s, the sidewalk was further widened, and the adjoining roadbed was converted into a permanent pedestrian plaza with benches.[8][9] The expanded plaza measures 95 ft long and extends the curb line eastward to Seventh Avenue.[10]

The surrounding area is part of Manhattan's Theater District and contains many Broadway theaters.[4] On the same block are the Richard Rodgers Theatre, Music Box Theatre, and Imperial Theatre to the west. Other nearby buildings include the Paramount Hotel to the northwest; the Hotel Edison and Lunt-Fontanne Theatre to the north; TSX Broadway, the Palace and Embassy, theaters, and the I. Miller Building to the northeast; 1540 Broadway to the east; 1530 Broadway to the southeast; One Astor Plaza to the south; and the Booth, Gerald Schoenfeld, Bernard B. Jacobs, and John Golden theaters to the southwest.[5] Historically, the Marriott's site was occupied by five theaters: the original Helen Hayes, Morosco, Bijou, Astor, and Gaiety (later Victoria), all built in the early 20th century.[12][13]

Architecture

The New York Marriott Marquis was designed by John C. Portman Jr. and is operated by Marriott International.[4] It is part of the Marriott Marquis brand of hotels, a joint venture between Marriott and Portman.[14] The hotel building has 51 stories and two basements, rising to a height of 574 ft.[15][16] While there had been rumors that the elevators serve a 55th floor,[17][18] Marriott states that the top floor number in the hotel is 49, which is used as office space.[17] According to Host Hotels & Resorts, the hotel's owner, the hotel has 1,966 rooms and 101000 ft2 of meeting space.[19]

Form and facade

The 1973 plans for the hotel called for two rectangular wings, one on 45th Street and one on 46th Street, connected by a twelve-story podium. Five-story sections of guest rooms were to be recessed between these wings, with each section alternating in depth.[20][21][22] The modern hotel is similar to what was originally planned, but the podium is eight stories tall.[23] Above the base of the hotel, in the middle of the Broadway facade, a curving drum sits atop the Marriott marquee. The rectangular wings on 45th and 46th Street contain open terraces on the eighth story, which face Times Square and Broadway. The wings are each 36 ft deep and are connected by a truss measuring 112 ft long.[24]

The facade is made of gray precast concrete panels with vertical stripes, which were manufactured by Canadian company Prefac-Vibrek. The lower stories' panels were installed using cranes, while the upper stories' panels were installed with a monorail assembly. The precast panels are hung from steel beams that are placed around the hotel building's perimeter. Some openings were also made in the facade so exterior signs could be attached to it. The windows are recessed deeply into the concrete panels, a design similar to a Venetian blind.[24]

Signs

On Broadway, the base of the facade originally had four signs. The largest measured 30 by and was placed at the center of the Broadway facade, while the other signs measured 23 by.[25]

The central sign on Broadway was known as the Kodarama and was originally used by Kodak to display color photos, which were changed several times per year and were accompanied by a caption sign measuring 6 by. The photos were printed on large Duratrans strips, which were double-laminated on the front to protect against weather and wind. The Kodak photos were framed by a large display box and were cooled by a vacuum system behind the box.[26] The signs were largely supported on beams that protruded from the facade. The Kodak sign was enlarged in 1999 to a display measuring 52 by. The enlarged display was divided into three parts: the primary display on the bottom, a Jumbotron in the upper right corner, and a tertiary display on the upper left corner. The Kodarama, along with the Coca-Cola sign, were the only signs along Times Square in the mid-1980s that were sponsored by major companies.[27]

In 2014, a new electronic sign was installed on the Broadway facade, spanning the whole length of the block and wrapping around to 45th and 46th Streets.[28][29] The screen, made by Mitsubishi Electric, measures 330 by and has 24 million pixels.[30] The new screen covers 25,740 ft2 and is made of interlocking panels measuring 6 by. The preexisting framing was extended and reinforced to support the newer sign, and a 57 ft Vierendeel truss was installed across the center of the Broadway facade.

Signs

On Broadway, the base of the facade originally had four signs. The largest measured 30 by and was placed at the center of the Broadway facade, while the other signs measured 23 by.[25]

The central sign on Broadway was known as the Kodarama and was originally used by Kodak to display color photos, which were changed several times per year and were accompanied by a caption sign measuring 6 by. The photos were printed on large Duratrans strips, which were double-laminated on the front to protect against weather and wind. The Kodak photos were framed by a large display box and were cooled by a vacuum system behind the box.[26] The signs were largely supported on beams that protruded from the facade. The Kodak sign was enlarged in 1999 to a display measuring 52 by. The enlarged display was divided into three parts: the primary display on the bottom, a Jumbotron in the upper right corner, and a tertiary display on the upper left corner. The Kodarama, along with the Coca-Cola sign, were the only signs along Times Square in the mid-1980s that were sponsored by major companies.[27]

In 2014, a new electronic sign was installed on the Broadway facade, spanning the whole length of the block and wrapping around to 45th and 46th Streets.[28][29] The screen, made by Mitsubishi Electric, measures 330 by and has 24 million pixels.[30] The new screen covers 25,740 ft2 and is made of interlocking panels measuring 6 by. The preexisting framing was extended and reinforced to support the newer sign, and a 57 ft Vierendeel truss was installed across the center of the Broadway facade.

Structural features

The foundation is on high-quality rock and uses spread footings capable of 40 ST/ft2. The site was excavated to a depth of 60 ft.[31] The hotel originally had two basement levels, but the first basement level was demolished in the 2010s, creating one basement level with a double-height ceiling. When the basement was modified, a steel frame was built adjacent to the foundation wall.

The superstructure of the hotel consists of 21500 ST of steel, manufactured by the Mosher Steel Company. Some of the steel beams measured as much as 125 ft long and weighed up to 70 ST apiece. As the steel was erected, a layer of minerals bonded with cement was sprayed onto the steel members, providing fireproofing.[31] The columns are placed about 8 ft behind the facade, and horizontal beams are cantilevered outward from the columns to support the exterior signs. Weidlinger Associates was the structural engineer[32] but, after the hotel was completed, it was reinforced with additional steel framing from Burgess Steel.[15] The second story of the hotel was removed in the 2010s, creating a double-height space on the ground story. The ground-story columns were reinforced with plates, and the depth of some beams was reduced by up to 1 ft.[32]

On the first ten stories, the floor decks consist of concrete poured over sheets of corrugated metal.[31] The guestroom floors above are made of concrete panels, which weigh about 10 ST each.[31] They measure 8 ft wide, 36 or long,[31][33] and 12 in thick.[33] According to an engineer, the precast slabs provided not only a finished ceiling (as opposed to a bare surface) but also lateral stability.[33] The floor decks contain standard steel trusses at some location, as well as Vierendeel trusses that carry some of the hotel rooms across the width of the atrium.[32] The structural steel is entirely encased inside floor slabs and walls, which allows light to pass into the central atrium.[15][32]

The freestanding elevator core is made of concrete and is rounded in shape.[24][33][34] It was manufactured by Collavino Brothers.[31] The core measures 55 ft wide and carries twelve passenger elevators on its exterior, as well as four elevators at the center.[35] The exterior elevators are surrounded by glass and overlook the atrium lobby.[31] The cabs are enclosed by glass and have fiber-optic lighting.[15] The elevator system, supplied by Schindler, has a destination dispatch system, which assigns passengers to elevator cars according to their destination floors.[36][37] The destination-dispatch system was completed in 2006[36][38] and modernized in 2019.[39] Six additional elevators are used by service staff.[38][40]

Interior

Base

Under normal zoning regulations, the maximum floor area ratio (FAR) for any building on the hotel's site was 15. During the hotel's planning, the FAR received two bonuses of 20 percent each, bringing the FAR to 21.6. The developers had to include privately owned public space at the building's base for the first bonus, and they built a new theater (the Marquis Theatre) for the second bonus.[22][41] The privately operated public space consists of two passageways between 45th and 46th Streets.[6] The passageway on the eastern side of the site contains a driveway,[6][42][24] which was designed with five vehicular lanes and was intended to divert taxi traffic away from Broadway.[42] To the west is a pedestrian walkway,[42] which functions as an northward extension of Shubert Alley[6][34] and was proposed as early as 1970.[41] Both the driveway and the Shubert Alley Extension have doors that lead to an indoor pedestrian area.[6]

The ground and second stories were designed with 10000 ft2 of retail space,[43] though the second story was demolished in the 2010s.[32] In the original plans, the retail space would have spanned seven stories at the base,[20][21][22] and a ninth-story terrace was to have enclosed the retail space.[21] The seven-story retail mall was part of the floor-area bonus for the hotel, but it was omitted in the final plan. While 40300 ft2 of public space was to have been provided in exchange for the floor-area bonus, a 2000 study by the Municipal Art Society could not locate the additional space.[6] Ernest P. Gathwaite, a professor at York College of the City University of New York, designed six landscape murals for the hotel, each measuring 12 ft wide.[44]

The Marquis Theatre is on the building's third floor.[45] In exchange for including the theater, the hotel was given a bonus of nearly 300000 ft2. As a stipulation of the bonus, the New York City Board of Estimate specified that there had to be 1,500 seats in the theater. The stage is immediately above the hotel driveway, and the ballroom is above the theater's ceiling.[46] The third through seventh stories contain theater offices,[6] as well as additional meeting rooms.[47]

Atrium lobby

The hotel's atrium lobby is placed on the eighth floor.[6][31][48] Because of security concerns when the hotel was constructed in the 1980s, there was originally only one set of escalators leading from street level to the hotel lobby.[48] A planted atrium rises 37 stories from the lobby to the rooftop restaurant. The atrium, extending 400 ft tall, is one of the world's tallest indoor spaces.[24] A sky bridge measuring 240 ft long is just above the atrium floor. This sky bridge has 90 tons of steel and contains LED signs on the side. The reception desks were originally placed on the south wall. Following a 2020s renovation, the desks were relocated to the north wall, separated by wooden archways, and a prismatic-glass wall was installed behind the desks. In addition, the lobby contains an acrylic sculpture by Parachilna, installed in 2022.[47]

Adjacent to the lobby, the hotel has a set of restaurants and a revolving cocktail lounge on its eastern side.[31] Robert Pinart designed five stained-glass panels for the lobby restaurant: three in the main restaurant area and two in an adjacent cocktail lounge.[49] As of 2022, the eighth floor contains Revel & Rye Bar and Restaurant, which includes a gold-colored ceiling and rows of lighting. There is also a 200-seat members' lounge called the M Club, with a business center and a library.[47] There is an adjoining lounge called the Broadway Lounge,[50][51] which serves cuisine inspired by food trucks.[52] The space has six chandeliers designed to resemble the Times Square Ball, as well as double-height windows facing Times Square.[47] The Broadway Lounge also connects to the hotel's two outdoor terraces on Broadway, which are known as Perch.[47][51]

The Marriott Marquis also has a 29000 ft2 ballroom, advertised during construction as the largest in New York City.[34][23] The main ballroom is known as the Broadway Ballroom and has a maximum capacity of 2,800,[53] with a black "vanishing ceiling" and LED chandeliers. There are also 46 smaller meeting rooms,[23][53] with a total area of 80000 ft2.[23] One of the meeting rooms is the Westside Ballroom, which covers 21,550 ft2 and has a capacity of 2,400 guests.[54] Another room, the Liberty Ballroom on the eighth floor, has a capacity of 140 to 150 people and faces Shubert Alley.[54] The conference space also includes 40 breakout rooms.[53] There is also a large ninth-story atrium known as the Terrace, connecting several of the meeting rooms. The Terrace is decorated with streetlight-shaped lamps and can also function as a meeting space.[47]

Upper stories

The hotel was built with 1,876[31][55] or 1,877 rooms,[56][57] each measuring 13.7 by.[31] Each room is designed to face the atrium.[23][31] Rather than physical keys, each room could be entered using a computerized card.[58] The hotel contains rooms in numerous sizes, including "family connector", "deluxe", and "superior" rooms.[59] The rooms also include TVs and custom furnishings.[47] By 2025, there were 1,971 rooms.[60]

The 47th through 49th stories contain the View, New York City's only rooftop revolving restaurant.[31][61] The View specializes in American cuisine for brunch and dinner.[52][62] The restaurant is designed with 700 seats.[23] As of 2025, the dining room is on the 47th story, and the bar is on the 48th story.[62] The dining room level generally makes a full revolution every 60 minutes, and the bar level rotates once every 45 minutes.[63] It originally rotated clockwise and made a full revolution every 70 to 80 minutes.[64] The rotating restaurant was manufactured by the Macton Corporation. It consists of a set of static pedestals with wheels attached to them. The restaurant and lounges are then placed on platforms above the wheels; there are rails on the underside of each platform, which one designer compared to the opposite of a train.[31]

Base

Under normal zoning regulations, the maximum floor area ratio (FAR) for any building on the hotel's site was 15. During the hotel's planning, the FAR received two bonuses of 20 percent each, bringing the FAR to 21.6. The developers had to include privately owned public space at the building's base for the first bonus, and they built a new theater (the Marquis Theatre) for the second bonus.[22][41] The privately operated public space consists of two passageways between 45th and 46th Streets.[6] The passageway on the eastern side of the site contains a driveway,[6][42][24] which was designed with five vehicular lanes and was intended to divert taxi traffic away from Broadway.[42] To the west is a pedestrian walkway,[42] which functions as an northward extension of Shubert Alley[6][34] and was proposed as early as 1970.[41] Both the driveway and the Shubert Alley Extension have doors that lead to an indoor pedestrian area.[6]

The ground and second stories were designed with 10000 ft2 of retail space,[43] though the second story was demolished in the 2010s.[32] In the original plans, the retail space would have spanned seven stories at the base,[20][21][22] and a ninth-story terrace was to have enclosed the retail space.[21] The seven-story retail mall was part of the floor-area bonus for the hotel, but it was omitted in the final plan. While 40300 ft2 of public space was to have been provided in exchange for the floor-area bonus, a 2000 study by the Municipal Art Society could not locate the additional space.[6] Ernest P. Gathwaite, a professor at York College of the City University of New York, designed six landscape murals for the hotel, each measuring 12 ft wide.[44]

The Marquis Theatre is on the building's third floor.[45] In exchange for including the theater, the hotel was given a bonus of nearly 300000 ft2. As a stipulation of the bonus, the New York City Board of Estimate specified that there had to be 1,500 seats in the theater. The stage is immediately above the hotel driveway, and the ballroom is above the theater's ceiling.[46] The third through seventh stories contain theater offices,[6] as well as additional meeting rooms.[47]

Atrium lobby

The hotel's atrium lobby is placed on the eighth floor.[6][31][48] Because of security concerns when the hotel was constructed in the 1980s, there was originally only one set of escalators leading from street level to the hotel lobby.[48] A planted atrium rises 37 stories from the lobby to the rooftop restaurant. The atrium, extending 400 ft tall, is one of the world's tallest indoor spaces.[24] A sky bridge measuring 240 ft long is just above the atrium floor. This sky bridge has 90 tons of steel and contains LED signs on the side. The reception desks were originally placed on the south wall. Following a 2020s renovation, the desks were relocated to the north wall, separated by wooden archways, and a prismatic-glass wall was installed behind the desks. In addition, the lobby contains an acrylic sculpture by Parachilna, installed in 2022.[47]

Adjacent to the lobby, the hotel has a set of restaurants and a revolving cocktail lounge on its eastern side.[31] Robert Pinart designed five stained-glass panels for the lobby restaurant: three in the main restaurant area and two in an adjacent cocktail lounge.[49] As of 2022, the eighth floor contains Revel & Rye Bar and Restaurant, which includes a gold-colored ceiling and rows of lighting. There is also a 200-seat members' lounge called the M Club, with a business center and a library.[47] There is an adjoining lounge called the Broadway Lounge,[50][51] which serves cuisine inspired by food trucks.[52] The space has six chandeliers designed to resemble the Times Square Ball, as well as double-height windows facing Times Square.[47] The Broadway Lounge also connects to the hotel's two outdoor terraces on Broadway, which are known as Perch.[47][51]

The Marriott Marquis also has a 29000 ft2 ballroom, advertised during construction as the largest in New York City.[34][23] The main ballroom is known as the Broadway Ballroom and has a maximum capacity of 2,800,[53] with a black "vanishing ceiling" and LED chandeliers. There are also 46 smaller meeting rooms,[23][53] with a total area of 80000 ft2.[23] One of the meeting rooms is the Westside Ballroom, which covers 21,550 ft2 and has a capacity of 2,400 guests.[54] Another room, the Liberty Ballroom on the eighth floor, has a capacity of 140 to 150 people and faces Shubert Alley.[54] The conference space also includes 40 breakout rooms.[53] There is also a large ninth-story atrium known as the Terrace, connecting several of the meeting rooms. The Terrace is decorated with streetlight-shaped lamps and can also function as a meeting space.[47]

Upper stories

The hotel was built with 1,876[31][55] or 1,877 rooms,[56][57] each measuring 13.7 by.[31] Each room is designed to face the atrium.[23][31] Rather than physical keys, each room could be entered using a computerized card.[58] The hotel contains rooms in numerous sizes, including "family connector", "deluxe", and "superior" rooms.[59] The rooms also include TVs and custom furnishings.[47] By 2025, there were 1,971 rooms.[60]

The 47th through 49th stories contain the View, New York City's only rooftop revolving restaurant.[31][61] The View specializes in American cuisine for brunch and dinner.[52][62] The restaurant is designed with 700 seats.[23] As of 2025, the dining room is on the 47th story, and the bar is on the 48th story.[62] The dining room level generally makes a full revolution every 60 minutes, and the bar level rotates once every 45 minutes.[63] It originally rotated clockwise and made a full revolution every 70 to 80 minutes.[64] The rotating restaurant was manufactured by the Macton Corporation. It consists of a set of static pedestals with wheels attached to them. The restaurant and lounges are then placed on platforms above the wheels; there are rails on the underside of each platform, which one designer compared to the opposite of a train.[31]

History

Planning

By the 1960s, Times Square was in decline, and its dilapidated condition was widely perceived among the public as representative of the city's decline as a whole.[13][60] In the late 1960s, real-estate agent Peter Sharp had acquired the Morosco, Astor, Helen Hayes, and Victoria theaters, with plans to build an office tower on the site.[65][66] However, Sharp could not find a willing major tenant for the property.[66] Sharp also tried to acquire the Piccadilly Hotel to the west, but the hotel's owners refused to sell.[67]

Initial concept and delays

Jaquelin T. Robertson, who led the city government's office of Midtown Planning and Development, convinced Sharp in 1970 to hire Robert Venturi as a consultant. Venturi, along with Denise Scott Brown and Steven Izenour, proposed large signs and "low public spaces".[13][68] Sharp was not impressed with Venturi's plan, and there was too much office space in Midtown, so Venturi's plans were scrapped.[13][69] Robertson and Sharp then visited Portman's Hyatt Regency Atlanta hotel in 1971, where Robertson recalled Sharp "stayed up half the night looking around".[69] Sharp offered to hire Portman, who readily accepted, as Portman had expressed interest in designing a building in New York City for several years. Portman agreed to provide 90 percent of financing for the project.[13][69] The New York Times subsequently recalled that Portman had taken the project because New York City was the "most claustrophobic city he had ever seen".[70] Sharp closed some of the theaters in the meantime, including the Astor in 1972.[71] Less than twelve legitimate theaters still existed in Times Square, so closing them was not a major concern to the public.[72]

On November 3, 1972, Western International Hotels (later Westin) and Portman announced they would build a 2,000-room hotel for $75 million.[73][74][75] The hotel would contain two towers connected by several multi-story walkways,[73][76] and it would complement a convention center on the Hudson River, later the Javits Center.[13][77] At the time, there had been no major hotel projects in New York City since the 1964 World's Fair,[74] and the number of hotel rooms in the city had declined since 1969.[78] Robertson praised the development as a harbinger of "the renaissance of Times Square".[13][73] By April 1973, the plans for the hotel had been changed to a single tower with a hollow atrium, increasing the projected cost to $90 million. Furthermore, difficulties in obtaining property title for the land lots had delayed the hotel.[79] Portman and mayor John Lindsay officially announced plans for the 54-story, 2,020-room Portman Hotel on July 11, 1973.[80][81] By then, the projected cost had risen to $150 million.[82][83] Portman also promised to renovate the 46th Street Theatre (later the Richard Rodgers Theatre) as part of the development.[84] Construction was set to begin in 1974, with the hotel set to open in 1977.[81][20]

The hotel received mixed reviews, with architectural critics and theatrical personalities being particularly negative toward the project.[22][84] The hotel also required approval for two special permits to increase the floor area ratio.[22][85] New York City Planning Commission chairman John Eugene Zuccotti scheduled a hearing for these permits in mid-1973.[80] The Portman Hotel was experiencing delays by the end of 1973 because of a lack of funding.[77] The New York City fiscal crisis had also endangered public funding for the convention center,[86] and, by January 1975, Portman warned that he would withdraw from the Portman Hotel unless the convention center was funded.[87][88] Construction costs had decreased enough that the hotel only needed $100 million, but only about $38 million had been raised,[87][89] as potential investors were reluctant to provide funds amid the declining economic conditions.[67] That December, Portman announced he would cancel the plans for the Portman Hotel.[90][91][92] Though the designs were completed and the city government had given approvals, investors had not shown interest in the project.[91][92] The cancellation meant that, for the time being, the Morosco and Helen Hayes theaters could continue to operate.[90] The Bankers Trust Company owned the site of the theaters.[93][94]

Revival of plans

In January 1976, the city negotiated with Portman to revive plans for the hotel.[95] By the middle of the year, the city's hotel industry had recovered and was running near capacity.[96] Portman Properties officials said in March 1978 that the company could raise $150 million for the hotel if the city government received a $15 million federal action grant.[93][97] The New York City Board of Estimate voted to approve a tax exemption for the hotel that August, thereby permitting Portman Properties to contact potential lenders.[98] The Urban Development Corporation (UDC), an agency of the New York state government, was to obtain the land and lease it back to the hotel operators for a long period;[99] it is unknown how much the UDC paid.[67] Later in 1978, the board authorized the city government to apply for the action grant on Portman's behalf.[100] Gerald Schoenfeld of the Shubert Organization predicted in September 1978 that the hotel was planned to start construction early the following year.[101]

By early 1979, the federal grant had still not been approved.[102] The federal grant application had been submitted but was held in abeyance until the outside financing was secured.[103] The cost of the hotel had risen to at least $240 million by June 1979, though about $60 million of that cost would become from the planned action grant and Portman's equity.[104] Equitable Life Assurance was negotiating with several other lenders to write a mortgage to cover the remaining cost.[105] Ultimately, Metropolitan Life and Manufacturers Hanover joined Equitable in funding the project.[106] Trust Houses Forte of London expressed interest in operating the hotel,[96][103] but the developers announced in November 1979 that they still had difficulties obtaining financing.[96][107] The operators of the Piccadilly Hotel said the same month that they would not sell to Portman.[108][96][109] The Piccadilly planned to continue offering low rates for their rooms, as opposed to the luxury prices planned for the Portman Hotel.[109][110]

Difficulties

The plans entailed the demolition of the original Helen Hayes, Morosco, and Bijou, as well as the remnants of the Astor and Gaiety.[12] Theatrical advocates and preservationists felt the Portman Hotel's new theater would be bulky and impersonal, like the Minskoff and the Uris (Gershwin).[96] The New York City Landmarks Preservation Commission (LPC) had internally described the Helen Hayes as "one of the finest theaters" in New York City,[96][111] and the Helen Hayes had been declared eligible for National Register of Historic Places (NRHP) listing in 1978.[112] In November 1979, a lawyer filed a lawsuit to force the LPC to consider the old Helen Hayes Theatre as a city landmark,[113] though the LPC had no opinion on the theaters.[114] The next month, Actors' Equity Association asked the city to reconsider the demolition of the old theaters.[115] The International Alliance of Theatrical Stage Employees conversely supported the project,[116] as did theatrical operators such as the Shubert Organization.[72][117]

In February 1980, actors such as Anthony Perkins, José Ferrer, and Tony Randall protested the proposed demolition of the Helen Hayes, Morosco, and Bijou.[96][118] With the city government set to obtain the Piccadilly Hotel through land condemnation, the Piccadilly's owners sued in March 1980 to stop the condemnation.[119] Actors' Equity collected signatures for a petition against the federal action grant, which still had not been distributed.[120] In July 1980, Manhattan Community Board 5 voted to affirm the Portman Hotel,[121][122] despite testimony from opponents including impresario Joseph Papp.[122][123] The Times reported that the project would probably proceed because of low interest rates and high demand for hotel rooms.[122][124] Opponents brought the issue before a New York City Council committee that had no power over the hotel's approval,[125] and they also alleged that Community Board 5 had approved the hotel without sufficient information.[126]

The city government gave approval in November 1980 to seek an additional $6.5 million in action grants, or $21.5 million total.[122][127] The next month, the Piccadilly's owners settled their lawsuit against the city, enabling Portman to acquire that site.[128][129] The project's remaining opponents, including Actors' Equity, filed a new lawsuit against the hotel.[129] The United States Department of Housing and Urban Development formally placed the federal action grant on hold in January 1981, supposedly because the documents had been sent a few days late.[130][131] The incoming administration of Ronald Reagan planned to eliminate the grant program altogether,[122][132] though Koch expressed confidence the hotel could be built regardless of the grant.[133] The action grant was approved in April 1981.[134]

Initial concept and delays

Jaquelin T. Robertson, who led the city government's office of Midtown Planning and Development, convinced Sharp in 1970 to hire Robert Venturi as a consultant. Venturi, along with Denise Scott Brown and Steven Izenour, proposed large signs and "low public spaces".[13][68] Sharp was not impressed with Venturi's plan, and there was too much office space in Midtown, so Venturi's plans were scrapped.[13][69] Robertson and Sharp then visited Portman's Hyatt Regency Atlanta hotel in 1971, where Robertson recalled Sharp "stayed up half the night looking around".[69] Sharp offered to hire Portman, who readily accepted, as Portman had expressed interest in designing a building in New York City for several years. Portman agreed to provide 90 percent of financing for the project.[13][69] The New York Times subsequently recalled that Portman had taken the project because New York City was the "most claustrophobic city he had ever seen".[70] Sharp closed some of the theaters in the meantime, including the Astor in 1972.[71] Less than twelve legitimate theaters still existed in Times Square, so closing them was not a major concern to the public.[72]

On November 3, 1972, Western International Hotels (later Westin) and Portman announced they would build a 2,000-room hotel for $75 million.[73][74][75] The hotel would contain two towers connected by several multi-story walkways,[73][76] and it would complement a convention center on the Hudson River, later the Javits Center.[13][77] At the time, there had been no major hotel projects in New York City since the 1964 World's Fair,[74] and the number of hotel rooms in the city had declined since 1969.[78] Robertson praised the development as a harbinger of "the renaissance of Times Square".[13][73] By April 1973, the plans for the hotel had been changed to a single tower with a hollow atrium, increasing the projected cost to $90 million. Furthermore, difficulties in obtaining property title for the land lots had delayed the hotel.[79] Portman and mayor John Lindsay officially announced plans for the 54-story, 2,020-room Portman Hotel on July 11, 1973.[80][81] By then, the projected cost had risen to $150 million.[82][83] Portman also promised to renovate the 46th Street Theatre (later the Richard Rodgers Theatre) as part of the development.[84] Construction was set to begin in 1974, with the hotel set to open in 1977.[81][20]

The hotel received mixed reviews, with architectural critics and theatrical personalities being particularly negative toward the project.[22][84] The hotel also required approval for two special permits to increase the floor area ratio.[22][85] New York City Planning Commission chairman John Eugene Zuccotti scheduled a hearing for these permits in mid-1973.[80] The Portman Hotel was experiencing delays by the end of 1973 because of a lack of funding.[77] The New York City fiscal crisis had also endangered public funding for the convention center,[86] and, by January 1975, Portman warned that he would withdraw from the Portman Hotel unless the convention center was funded.[87][88] Construction costs had decreased enough that the hotel only needed $100 million, but only about $38 million had been raised,[87][89] as potential investors were reluctant to provide funds amid the declining economic conditions.[67] That December, Portman announced he would cancel the plans for the Portman Hotel.[90][91][92] Though the designs were completed and the city government had given approvals, investors had not shown interest in the project.[91][92] The cancellation meant that, for the time being, the Morosco and Helen Hayes theaters could continue to operate.[90] The Bankers Trust Company owned the site of the theaters.[93][94]

Revival of plans

In January 1976, the city negotiated with Portman to revive plans for the hotel.[95] By the middle of the year, the city's hotel industry had recovered and was running near capacity.[96] Portman Properties officials said in March 1978 that the company could raise $150 million for the hotel if the city government received a $15 million federal action grant.[93][97] The New York City Board of Estimate voted to approve a tax exemption for the hotel that August, thereby permitting Portman Properties to contact potential lenders.[98] The Urban Development Corporation (UDC), an agency of the New York state government, was to obtain the land and lease it back to the hotel operators for a long period;[99] it is unknown how much the UDC paid.[67] Later in 1978, the board authorized the city government to apply for the action grant on Portman's behalf.[100] Gerald Schoenfeld of the Shubert Organization predicted in September 1978 that the hotel was planned to start construction early the following year.[101]

By early 1979, the federal grant had still not been approved.[102] The federal grant application had been submitted but was held in abeyance until the outside financing was secured.[103] The cost of the hotel had risen to at least $240 million by June 1979, though about $60 million of that cost would become from the planned action grant and Portman's equity.[104] Equitable Life Assurance was negotiating with several other lenders to write a mortgage to cover the remaining cost.[105] Ultimately, Metropolitan Life and Manufacturers Hanover joined Equitable in funding the project.[106] Trust Houses Forte of London expressed interest in operating the hotel,[96][103] but the developers announced in November 1979 that they still had difficulties obtaining financing.[96][107] The operators of the Piccadilly Hotel said the same month that they would not sell to Portman.[108][96][109] The Piccadilly planned to continue offering low rates for their rooms, as opposed to the luxury prices planned for the Portman Hotel.[109][110]

Difficulties

The plans entailed the demolition of the original Helen Hayes, Morosco, and Bijou, as well as the remnants of the Astor and Gaiety.[12] Theatrical advocates and preservationists felt the Portman Hotel's new theater would be bulky and impersonal, like the Minskoff and the Uris (Gershwin).[96] The New York City Landmarks Preservation Commission (LPC) had internally described the Helen Hayes as "one of the finest theaters" in New York City,[96][111] and the Helen Hayes had been declared eligible for National Register of Historic Places (NRHP) listing in 1978.[112] In November 1979, a lawyer filed a lawsuit to force the LPC to consider the old Helen Hayes Theatre as a city landmark,[113] though the LPC had no opinion on the theaters.[114] The next month, Actors' Equity Association asked the city to reconsider the demolition of the old theaters.[115] The International Alliance of Theatrical Stage Employees conversely supported the project,[116] as did theatrical operators such as the Shubert Organization.[72][117]

In February 1980, actors such as Anthony Perkins, José Ferrer, and Tony Randall protested the proposed demolition of the Helen Hayes, Morosco, and Bijou.[96][118] With the city government set to obtain the Piccadilly Hotel through land condemnation, the Piccadilly's owners sued in March 1980 to stop the condemnation.[119] Actors' Equity collected signatures for a petition against the federal action grant, which still had not been distributed.[120] In July 1980, Manhattan Community Board 5 voted to affirm the Portman Hotel,[121][122] despite testimony from opponents including impresario Joseph Papp.[122][123] The Times reported that the project would probably proceed because of low interest rates and high demand for hotel rooms.[122][124] Opponents brought the issue before a New York City Council committee that had no power over the hotel's approval,[125] and they also alleged that Community Board 5 had approved the hotel without sufficient information.[126]

The city government gave approval in November 1980 to seek an additional $6.5 million in action grants, or $21.5 million total.[122][127] The next month, the Piccadilly's owners settled their lawsuit against the city, enabling Portman to acquire that site.[128][129] The project's remaining opponents, including Actors' Equity, filed a new lawsuit against the hotel.[129] The United States Department of Housing and Urban Development formally placed the federal action grant on hold in January 1981, supposedly because the documents had been sent a few days late.[130][131] The incoming administration of Ronald Reagan planned to eliminate the grant program altogether,[122][132] though Koch expressed confidence the hotel could be built regardless of the grant.[133] The action grant was approved in April 1981.[134]

Development

Portman had begun formally acquiring land for the hotel in January 1981,[135] terminating existing leases.[136] Marriott was reported as the likely operator of the new hotel that March[137] and subsequently signed a 25-year contract to manage the hotel.[34] The hotel continued to be known colloquially as the Portman Hotel,[23] but it encountered so many delays that it was nicknamed "Portman's Folly".[70] The hotel's developer was officially known as the Times Square Hotel Company, which leased the land from the UDC at $900,000 per year. The original lease ran for 75 years, but Marriott could exercise an option to buy the land at fair market value after paying off the federal grant.[138] A financing agreement was finalized in March 1982.[139]

Site clearing and preservation efforts

By mid-1981, the only remaining issues to address before the start of construction were a public hearing for the planning process, as well as a lawsuit from Actors' Equity.[140] Though opponents made many comments at the public hearings,[141] the city published an environmental impact statement in favor of Portman's plans.[72][56] As a last-ditch effort, opponents put forth a competing proposal by Lee Harris Pomeroy, which was largely similar to Portman's plans[142] but would cantilever the hotel over the theaters.[143] Portman Properties did not challenge the validity of the proposal but said it would further prolong the hotel's construction,[72][56] and the City Planning Commission ultimately denied Pomeroy's proposal.[144] Nevertheless, Pomeroy's plan earned a merit award from the Municipal Art Society.[145] A pedestrian plaza was also planned for the section of Broadway in front of the hotel, but this too was controversial.[72][146] In general, supporters of the hotel also advocated for the pedestrian plaza, while opponents of the hotel were against the plaza.[147]

Actors' Equity and other preservation groups had tried to add the Morosco to the NRHP in early 1981, though the federal government initially rejected the move.[148] After opponents further advocated NRHP listings for the site,[149] the Morosco was deemed eligible for the NRHP that November.[150] Subsequently, lawyers for Actors' Equity and Natural Resources Defense Council accused Reagan aide Lyn Nofziger and interior secretary James G. Watt of coercing the Advisory Council on Historic Preservation in favor of the Portman development.[112][151][152] A Times writer stated that the preservation issue had become particularly "heated among playwrights", to the point where it could not be discussed in theatrical meetings.[72] A federal appeals court granted a temporary injunction against demolishing the Morosco and Helen Hayes theaters on January 6, 1982,[153][154] but a state court approved the demolition three days later.[153][155] By January 15, the Bijou was demolished.[156]

A federal judge ruled to allow the other theaters' demolition in February 1982, rejecting claims of political influence.[157] Actors held a protest to save the theaters on March 3,[158] and a state judge granted two week-long injunctions.[159] A federal injunction was also in place until the Supreme Court of the United States chose whether to hear the case.[160] The New York Court of Appeals refused to hear an appeal on March 17,[161] and it rejected another appeal three days later.[160][162] By then, three of the five theaters had been demolished.[160] Robert Redford filed a lawsuit to stop the hotel's construction on the technicality that it would be built on the pedestrian plaza.[163] Demolition of the Helen Hayes and Morosco commenced on March 22, after the U.S. Supreme Court refused to hear the case, and several high-profile actors and theatrical personalities were arrested in the ensuing protests.[164] The Morosco was demolished quickly as it was never listed on the NRHP, but some historically and architecturally significant items from the Helen Hayes were preserved.[165] The controversy over the theaters' demolition prompted a larger-scale preservation movement for Broadway theaters in the 1980s.[153][166]

Construction

By May 1982, Portman indicated he would drop plans for the Broadway pedestrian plaza, citing large community opposition.[147] The facade had to be redesigned as a result of the pedestrian plaza's cancellation. The site had been cleared by mid-1982, except for the Piccadilly Hotel. That July, Portman had put together $15 million to acquire the site of the Piccadilly Hotel, which was closed immediately.[167][168] Simultaneously, Portman Properties signed contracts with its lenders for a $221.5 million financing package, which would fund much of the $320 million cost.[169][170] Equitable Life, Metropolitan Life, Manufacturers Hanover, and the New York State Common Retirement Fund would collectively loan $200 million,(composed of a $150 million first mortgage and $50 million second mortgage) while the city would loan the action grant of $21.5 million.[167][170] The Piccadilly's items were then sold off,[171] but its demolition was delayed in late 1982 due to a lack of proper permits.[172] The Portman Hotel's foundation was excavated through blasting, which had to be timed to avoid interrupting performances at nearby theaters.[31] The Portman Hotel was one of several in New York City being built in the mid-1980s, with a collective 3,500 rooms between them.[173] Marriott Corporation president Bill Marriott and the company's executive vice president Fred Malek hoped the new hotel would revitalize Times Square, the decline of which they had personally witnessed when they were younger.[174] The hotel was still not officially named until the end of 1982, when it became the "Marriott Marquis".[175] By then, excavations were nearly complete.[176] The concrete elevator core was then poured through a steel-and-wood formwork that was moved upward at a rate of 1 ft per hour.[31] The core had risen to the fourth story in January 1983.[35] A sign with the Marriott name was hung on the core, though members of the public were still unaware that Marriott was in charge of the project, according to a New York Daily News account.[177] The core had risen to nearly its full height by mid-1983, with the girders to be built afterward.[178]

The steel superstructure was built after the elevator core. Because of the heavy traffic and densely built neighborhood, there was only a small amount of space where builders could work, and materials could not be staged nearby. The steel beams were therefore transported from a facility in Kearny, New Jersey, and then installed immediately. Work typically took place on the east side of the site during afternoons, when the theaters to the west were giving matinee productions.[31] After a protest in mid-1983 over the lack of minority workers at the site,[179] the developers hired additional minority workers to comply with a UDC rule, and several women joined the then-exclusively-male project.[180] Delays also ensued due to labor strikes and alleged sabotage; The Wall Street Journal quoted an anonymous source as saying that already-installed electrical wiring would be ripped out and that cement would be flushed down the toilet. In addition, due to threats of strikes from multiple labor unions, steel beams could not be delivered directly to the site, and workers had to pour the concrete floors on site instead of using precast concrete.[181]

Completion

The Marriott Marquis was refinanced with $328.5 million from 23 lenders in January 1984. Marriott put up 89 percent of the equity and Portman put up the remainder.[23][182] By then, potential guests had made at least 300,000 nights of reservations at the Marriott Marquis.[23][31] One guest had reserved a room for the Times Square Ball drop on New Year's Eve 1999,[31][183] which the guest ultimately attended.[184] The Marriott chain also began negotiating with potential theater operators.[34] The Marriott Marquis planned to charge $175 per room per night.[185] The costs of the hotel had risen to $400 million.[185][186] The hotel topped out at a ceremony in October 1984.[187][188][189] At the ceremony, Koch praised the hotel as the "first gem in the new Times Square crown".[188]

In November 1984, the Nederlander Organization accepted the rights to operate the hotel's theater.[190] As the hotel was being completed in mid-1985, a worker was killed after falling several stories at the site.[191] Prior to the hotel's opening, the Times described the hotel as "the linchpin of an ambitious plan to redevelop Times Square", and several major organizations had booked conventions there.[186] To prepare for the official opening, some "practice meals" were held in the ballroom for various charities and government agencies.[192] Additionally, in 1985, Portman bought a 28.68 percent ownership stake in the hotel for $26.3 million, and he took a $375 million loan at a 12 percent interest rate.[193]

Site clearing and preservation efforts

By mid-1981, the only remaining issues to address before the start of construction were a public hearing for the planning process, as well as a lawsuit from Actors' Equity.[140] Though opponents made many comments at the public hearings,[141] the city published an environmental impact statement in favor of Portman's plans.[72][56] As a last-ditch effort, opponents put forth a competing proposal by Lee Harris Pomeroy, which was largely similar to Portman's plans[142] but would cantilever the hotel over the theaters.[143] Portman Properties did not challenge the validity of the proposal but said it would further prolong the hotel's construction,[72][56] and the City Planning Commission ultimately denied Pomeroy's proposal.[144] Nevertheless, Pomeroy's plan earned a merit award from the Municipal Art Society.[145] A pedestrian plaza was also planned for the section of Broadway in front of the hotel, but this too was controversial.[72][146] In general, supporters of the hotel also advocated for the pedestrian plaza, while opponents of the hotel were against the plaza.[147]

Actors' Equity and other preservation groups had tried to add the Morosco to the NRHP in early 1981, though the federal government initially rejected the move.[148] After opponents further advocated NRHP listings for the site,[149] the Morosco was deemed eligible for the NRHP that November.[150] Subsequently, lawyers for Actors' Equity and Natural Resources Defense Council accused Reagan aide Lyn Nofziger and interior secretary James G. Watt of coercing the Advisory Council on Historic Preservation in favor of the Portman development.[112][151][152] A Times writer stated that the preservation issue had become particularly "heated among playwrights", to the point where it could not be discussed in theatrical meetings.[72] A federal appeals court granted a temporary injunction against demolishing the Morosco and Helen Hayes theaters on January 6, 1982,[153][154] but a state court approved the demolition three days later.[153][155] By January 15, the Bijou was demolished.[156]

A federal judge ruled to allow the other theaters' demolition in February 1982, rejecting claims of political influence.[157] Actors held a protest to save the theaters on March 3,[158] and a state judge granted two week-long injunctions.[159] A federal injunction was also in place until the Supreme Court of the United States chose whether to hear the case.[160] The New York Court of Appeals refused to hear an appeal on March 17,[161] and it rejected another appeal three days later.[160][162] By then, three of the five theaters had been demolished.[160] Robert Redford filed a lawsuit to stop the hotel's construction on the technicality that it would be built on the pedestrian plaza.[163] Demolition of the Helen Hayes and Morosco commenced on March 22, after the U.S. Supreme Court refused to hear the case, and several high-profile actors and theatrical personalities were arrested in the ensuing protests.[164] The Morosco was demolished quickly as it was never listed on the NRHP, but some historically and architecturally significant items from the Helen Hayes were preserved.[165] The controversy over the theaters' demolition prompted a larger-scale preservation movement for Broadway theaters in the 1980s.[153][166]

Construction

By May 1982, Portman indicated he would drop plans for the Broadway pedestrian plaza, citing large community opposition.[147] The facade had to be redesigned as a result of the pedestrian plaza's cancellation. The site had been cleared by mid-1982, except for the Piccadilly Hotel. That July, Portman had put together $15 million to acquire the site of the Piccadilly Hotel, which was closed immediately.[167][168] Simultaneously, Portman Properties signed contracts with its lenders for a $221.5 million financing package, which would fund much of the $320 million cost.[169][170] Equitable Life, Metropolitan Life, Manufacturers Hanover, and the New York State Common Retirement Fund would collectively loan $200 million,(composed of a $150 million first mortgage and $50 million second mortgage) while the city would loan the action grant of $21.5 million.[167][170] The Piccadilly's items were then sold off,[171] but its demolition was delayed in late 1982 due to a lack of proper permits.[172] The Portman Hotel's foundation was excavated through blasting, which had to be timed to avoid interrupting performances at nearby theaters.[31] The Portman Hotel was one of several in New York City being built in the mid-1980s, with a collective 3,500 rooms between them.[173] Marriott Corporation president Bill Marriott and the company's executive vice president Fred Malek hoped the new hotel would revitalize Times Square, the decline of which they had personally witnessed when they were younger.[174] The hotel was still not officially named until the end of 1982, when it became the "Marriott Marquis".[175] By then, excavations were nearly complete.[176] The concrete elevator core was then poured through a steel-and-wood formwork that was moved upward at a rate of 1 ft per hour.[31] The core had risen to the fourth story in January 1983.[35] A sign with the Marriott name was hung on the core, though members of the public were still unaware that Marriott was in charge of the project, according to a New York Daily News account.[177] The core had risen to nearly its full height by mid-1983, with the girders to be built afterward.[178]

The steel superstructure was built after the elevator core. Because of the heavy traffic and densely built neighborhood, there was only a small amount of space where builders could work, and materials could not be staged nearby. The steel beams were therefore transported from a facility in Kearny, New Jersey, and then installed immediately. Work typically took place on the east side of the site during afternoons, when the theaters to the west were giving matinee productions.[31] After a protest in mid-1983 over the lack of minority workers at the site,[179] the developers hired additional minority workers to comply with a UDC rule, and several women joined the then-exclusively-male project.[180] Delays also ensued due to labor strikes and alleged sabotage; The Wall Street Journal quoted an anonymous source as saying that already-installed electrical wiring would be ripped out and that cement would be flushed down the toilet. In addition, due to threats of strikes from multiple labor unions, steel beams could not be delivered directly to the site, and workers had to pour the concrete floors on site instead of using precast concrete.[181]

Completion

The Marriott Marquis was refinanced with $328.5 million from 23 lenders in January 1984. Marriott put up 89 percent of the equity and Portman put up the remainder.[23][182] By then, potential guests had made at least 300,000 nights of reservations at the Marriott Marquis.[23][31] One guest had reserved a room for the Times Square Ball drop on New Year's Eve 1999,[31][183] which the guest ultimately attended.[184] The Marriott chain also began negotiating with potential theater operators.[34] The Marriott Marquis planned to charge $175 per room per night.[185] The costs of the hotel had risen to $400 million.[185][186] The hotel topped out at a ceremony in October 1984.[187][188][189] At the ceremony, Koch praised the hotel as the "first gem in the new Times Square crown".[188]

In November 1984, the Nederlander Organization accepted the rights to operate the hotel's theater.[190] As the hotel was being completed in mid-1985, a worker was killed after falling several stories at the site.[191] Prior to the hotel's opening, the Times described the hotel as "the linchpin of an ambitious plan to redevelop Times Square", and several major organizations had booked conventions there.[186] To prepare for the official opening, some "practice meals" were held in the ballroom for various charities and government agencies.[192] Additionally, in 1985, Portman bought a 28.68 percent ownership stake in the hotel for $26.3 million, and he took a $375 million loan at a 12 percent interest rate.[193]

Operation

Opening and early years

The Marriott Marquis opened on September 3, 1985.[194][60] It had been slated to open two days earlier, but there had been delays in obtaining a certificate of occupancy for the eighth story.[195] The ultimate approval was given orally on the afternoon before it opened, just before a convention of the Emergency Nurses Association was scheduled to take place at the hotel. The initial opening included the meeting space, restaurants, and five hundred rooms on the lower floors. The rooftop revolving restaurant and theater were still not open.[194] At the time, the hotel was not expected to be finished until the end of that year, but 1.2 million nights of reservations had been booked through 1995.[194][196] Marriott executives projected that it might take years for the hotel to become profitable.[57] Actors Equity still held resentment against the hotel, advocating for the Actors Fund of America to cancel a planned benefit there shortly after the hotel's opening.[197]

The hotel was formally dedicated in October 1985,[70][198] and most of the rooms were open by that time.[60] The Marriott Marquis was one of 13 large hotels, with a combined 9,000 rooms, that had opened in New York City during the early 1980s.[199] In late 1985, Kodak installed the world's largest color photograph display on one of the panels outside the hotel.[25][26] The Marquis Theatre within the hotel opened in July 1986.[200][201] In its first two years, the Marriott Marquis had one million guests.[202][203] The average room rates in 1986 and 1987 were far below the posted rates, in part because nearly half of its patronage was group business, much higher than Marriott originally projected.[202] Though the controversy over the hotel largely subsided, some Broadway performers refused to visit the hotel years after its completion.[203] The Marriott Marquis's events included the National Football League Draft, which was hosted at the hotel from 1986[204] to 1994.[204][205] By the late 1980s, the Marriott Marquis had an occupancy rate of 80 percent year-round, higher than other hotels in Manhattan.[206] It had been one of several hotels to be developed around Times Square,[207] as well as in New York City in general, during the 1980s.[208]

1990s and 2000s

After the hotel's completion, the proportion of tourists staying there gradually increased.[60] By the early 1990s, Portman was having trouble paying off his $375 million loan.[209] As a result, at the end of 1993, the newly spun-off Host Marriott obtained a 28.6 percent ownership stake in the Marriott Marquis from Portman after he defaulted on his loan.[193][209] The following year, coffee brand Maxwell House installed a sign on the hotel's facade.[210] By the mid-1990s, the New York Marriott Marquis was highly profitable, especially with the ongoing revitalization of Times Square.[211][212] A 1997 New York Times report stated that the hotel's rooms had an occupancy rate of 90 percent year-round,[211] while Crain's New York stated that the New York Marquis was the "most successful hotel worldwide" in the Marriott brand when considering its size, revenue, or occupancy rate.[212] At the time, the hotel had 1,700 employees who spoke 47 languages.[213]

In advance of the 1998 Goodwill Games, Marriott affixed a three-story sign made of vinyl panels onto the facade.[214] In 1998, the administration of mayor Rudy Giuliani shortened the site's lease from 75 to 35 years.[215] Marriott would pay $19.9 million when the lease expired in 2017, and Marriott would make a fixed payment on the lease instead of paying a percentage of the taxes.[138][216] The Giuliani administration said the move would allow the city to receive the $19.9 million forty years early and would increase tax revenue by $16 million per year for forty years.[215] The Kodak sign on the facade was renovated and enlarged in 1999.[27]

From the hotel's opening, congestion in the elevators had been a major issue, with waits stretching up to half an hour. The elevators accounted for three of four complaints about the hotel, which itself had one of the most complaints of any Marriott hotel.[38] As a result, the six service elevators were renovated between 2002 and 2004 with the installation of a destination dispatch system. The 16 guest elevators were renovated with a destination dispatch system starting in 2004[40][38] and were completed in 2006.[36] The destination dispatch system was installed because the design of the elevator core prevented the installation of additional elevators.[217] The minibars in the guest rooms were removed by the mid-2000s due to low use.[218] Through the late 2000s, the hotel had a 90 percent occupancy rate throughout the year.[219] A 2008 appraisal found the hotel to be worth $579.7 million, making it the most valuable hotel in the city.[220]

2010s to present

Marriott offered to pay $10.7 million for the hotel site in 2010, though this was unsuccessful.[138] The guestrooms were renovated in 2011 and 2012. As part of the renovation, a restaurant called Crossroads was opened, and a lounge called the Broadway Lounge was also refurbished.[221] By April 2012, the Kodak sign was no longer profitable and Kodak wished to sell its lease to the sign.[222][223] Vornado Realty Trust signed a 20-year lease that August to redevelop the Marriott Marquis's retail space. The company planned to spend up to $140 million on upgrading the signage at the base and renovating the retail space.[224][225] Vornado expected that the upgraded sign would be highly profitable.[226] In 2013, Host Hotels & Resorts acquired outright ownership of the land under the Marriott Marquis from the Empire State Development Corporation (ESD), the parent organization of the UDC, for $19.9 million due to a clause in the renegotiation of the lease from the ESD in 1998.[227][228] City comptroller John Liu sharply criticized the price, saying the site had a market value of $193 million.[138][216]

An enlarged electronic sign at the base was completed in November 2014.[28][29] In September 2018, Vornado acquired the remaining 46 percent ownership stake in the Marriott Marquis's retail space from Host Hotels & Resorts for $442 million, giving Vornado full control of the retail space and exterior sign.[229] At the time, the retail tenants included Invicta, Levi's, Sephora, Swatch, and T-Mobile.[230] During the COVID-19 pandemic in 2020, in which demand for the hotel decreased greatly, Marriott decided to outsource all of its more than 850 foodservice-worker positions.[231] In December 2020, Marriott notified all of the foodservice workers that they would be fired by the following March.[232][233] The move led to protests from the laid-off workers[234][235] and an investigation from the Attorney General of New York,[236] and its remaining workers voted to unionize in early 2021.[231][237] At the time, the hotel's workers had never been unionized.[238]

A major renovation of the hotel began in the late 2010s.[60] Omnibuild oversaw a 16-month, $30 million renovation of the Marriott Marquis.[239][240] As part of the renovation, the bars, restaurants, meeting rooms, and ballrooms were upgraded, and a sky bridge measuring 240 ft long was installed at the ninth story. In addition, a boiler plant that converted gas to steam was installed.[239] The Union Square Hospitality Group was selected to provide food service to the Marriott Marquis's rooms.[231] During late 2022, one of the Marriott Marquis's suites was rethemed to the musical Beetlejuice, which at the time was being staged at the Marquis Theatre.[241] The Union Square Hospitality Group took over the hotel's revolving restaurant in late 2024,[242][243] and Danny Meyer reopened the restaurant in February 2025 after a renovation.[244][245] In addition, Vornado obtained a $450 million loan in April 2025, using the hotel's retail space and the Marquis Theatre as collateral; at the time, the property was free of debt.[246][247] In January 2026, the large billboard wrapping around the hotel's base was turned off in preparation for its replacement with an upgraded display.[248]

Opening and early years

The Marriott Marquis opened on September 3, 1985.[194][60] It had been slated to open two days earlier, but there had been delays in obtaining a certificate of occupancy for the eighth story.[195] The ultimate approval was given orally on the afternoon before it opened, just before a convention of the Emergency Nurses Association was scheduled to take place at the hotel. The initial opening included the meeting space, restaurants, and five hundred rooms on the lower floors. The rooftop revolving restaurant and theater were still not open.[194] At the time, the hotel was not expected to be finished until the end of that year, but 1.2 million nights of reservations had been booked through 1995.[194][196] Marriott executives projected that it might take years for the hotel to become profitable.[57] Actors Equity still held resentment against the hotel, advocating for the Actors Fund of America to cancel a planned benefit there shortly after the hotel's opening.[197]

The hotel was formally dedicated in October 1985,[70][198] and most of the rooms were open by that time.[60] The Marriott Marquis was one of 13 large hotels, with a combined 9,000 rooms, that had opened in New York City during the early 1980s.[199] In late 1985, Kodak installed the world's largest color photograph display on one of the panels outside the hotel.[25][26] The Marquis Theatre within the hotel opened in July 1986.[200][201] In its first two years, the Marriott Marquis had one million guests.[202][203] The average room rates in 1986 and 1987 were far below the posted rates, in part because nearly half of its patronage was group business, much higher than Marriott originally projected.[202] Though the controversy over the hotel largely subsided, some Broadway performers refused to visit the hotel years after its completion.[203] The Marriott Marquis's events included the National Football League Draft, which was hosted at the hotel from 1986[204] to 1994.[204][205] By the late 1980s, the Marriott Marquis had an occupancy rate of 80 percent year-round, higher than other hotels in Manhattan.[206] It had been one of several hotels to be developed around Times Square,[207] as well as in New York City in general, during the 1980s.[208]

1990s and 2000s

After the hotel's completion, the proportion of tourists staying there gradually increased.[60] By the early 1990s, Portman was having trouble paying off his $375 million loan.[209] As a result, at the end of 1993, the newly spun-off Host Marriott obtained a 28.6 percent ownership stake in the Marriott Marquis from Portman after he defaulted on his loan.[193][209] The following year, coffee brand Maxwell House installed a sign on the hotel's facade.[210] By the mid-1990s, the New York Marriott Marquis was highly profitable, especially with the ongoing revitalization of Times Square.[211][212] A 1997 New York Times report stated that the hotel's rooms had an occupancy rate of 90 percent year-round,[211] while Crain's New York stated that the New York Marquis was the "most successful hotel worldwide" in the Marriott brand when considering its size, revenue, or occupancy rate.[212] At the time, the hotel had 1,700 employees who spoke 47 languages.[213]

In advance of the 1998 Goodwill Games, Marriott affixed a three-story sign made of vinyl panels onto the facade.[214] In 1998, the administration of mayor Rudy Giuliani shortened the site's lease from 75 to 35 years.[215] Marriott would pay $19.9 million when the lease expired in 2017, and Marriott would make a fixed payment on the lease instead of paying a percentage of the taxes.[138][216] The Giuliani administration said the move would allow the city to receive the $19.9 million forty years early and would increase tax revenue by $16 million per year for forty years.[215] The Kodak sign on the facade was renovated and enlarged in 1999.[27]

From the hotel's opening, congestion in the elevators had been a major issue, with waits stretching up to half an hour. The elevators accounted for three of four complaints about the hotel, which itself had one of the most complaints of any Marriott hotel.[38] As a result, the six service elevators were renovated between 2002 and 2004 with the installation of a destination dispatch system. The 16 guest elevators were renovated with a destination dispatch system starting in 2004[40][38] and were completed in 2006.[36] The destination dispatch system was installed because the design of the elevator core prevented the installation of additional elevators.[217] The minibars in the guest rooms were removed by the mid-2000s due to low use.[218] Through the late 2000s, the hotel had a 90 percent occupancy rate throughout the year.[219] A 2008 appraisal found the hotel to be worth $579.7 million, making it the most valuable hotel in the city.[220]

2010s to present

Marriott offered to pay $10.7 million for the hotel site in 2010, though this was unsuccessful.[138] The guestrooms were renovated in 2011 and 2012. As part of the renovation, a restaurant called Crossroads was opened, and a lounge called the Broadway Lounge was also refurbished.[221] By April 2012, the Kodak sign was no longer profitable and Kodak wished to sell its lease to the sign.[222][223] Vornado Realty Trust signed a 20-year lease that August to redevelop the Marriott Marquis's retail space. The company planned to spend up to $140 million on upgrading the signage at the base and renovating the retail space.[224][225] Vornado expected that the upgraded sign would be highly profitable.[226] In 2013, Host Hotels & Resorts acquired outright ownership of the land under the Marriott Marquis from the Empire State Development Corporation (ESD), the parent organization of the UDC, for $19.9 million due to a clause in the renegotiation of the lease from the ESD in 1998.[227][228] City comptroller John Liu sharply criticized the price, saying the site had a market value of $193 million.[138][216]

An enlarged electronic sign at the base was completed in November 2014.[28][29] In September 2018, Vornado acquired the remaining 46 percent ownership stake in the Marriott Marquis's retail space from Host Hotels & Resorts for $442 million, giving Vornado full control of the retail space and exterior sign.[229] At the time, the retail tenants included Invicta, Levi's, Sephora, Swatch, and T-Mobile.[230] During the COVID-19 pandemic in 2020, in which demand for the hotel decreased greatly, Marriott decided to outsource all of its more than 850 foodservice-worker positions.[231] In December 2020, Marriott notified all of the foodservice workers that they would be fired by the following March.[232][233] The move led to protests from the laid-off workers[234][235] and an investigation from the Attorney General of New York,[236] and its remaining workers voted to unionize in early 2021.[231][237] At the time, the hotel's workers had never been unionized.[238]

A major renovation of the hotel began in the late 2010s.[60] Omnibuild oversaw a 16-month, $30 million renovation of the Marriott Marquis.[239][240] As part of the renovation, the bars, restaurants, meeting rooms, and ballrooms were upgraded, and a sky bridge measuring 240 ft long was installed at the ninth story. In addition, a boiler plant that converted gas to steam was installed.[239] The Union Square Hospitality Group was selected to provide food service to the Marriott Marquis's rooms.[231] During late 2022, one of the Marriott Marquis's suites was rethemed to the musical Beetlejuice, which at the time was being staged at the Marquis Theatre.[241] The Union Square Hospitality Group took over the hotel's revolving restaurant in late 2024,[242][243] and Danny Meyer reopened the restaurant in February 2025 after a renovation.[244][245] In addition, Vornado obtained a $450 million loan in April 2025, using the hotel's retail space and the Marquis Theatre as collateral; at the time, the property was free of debt.[246][247] In January 2026, the large billboard wrapping around the hotel's base was turned off in preparation for its replacement with an upgraded display.[248]

Critical reception

Of the original plans, architectural critic Ada Louise Huxtable wrote that the Portman Hotel "will be not only the city's tallest, but also its most dramatic, repeating and enlarging a successful Portman formula already in operation in Atlanta, Chicago, and San Francisco".[20] Huxtable wrote that Times Square's redevelopment was contingent on whether the "large, tide-turning" Portman Hotel was able to succeed.[249] Architectural Forum wrote that "any Portman in a storm (especially that of Times Square) will do just fine",[250][22] while The New Yorker commented, "The hotel looked like fun".[250][251] Conversely, Stanley Abercrombie of Architecture Plus said "the hotel threatens to effect, at street level, a weakening rather than a strengthening of Times Square vitality".[250][85]

In 1980, after the redesigned hotel was revealed, Paul Goldberger wrote that he supported the hotel plans. Though Goldberger was slightly disturbed by the planned destruction of the theaters, "the life of an ongoing city is always one of tradeoffs".[110][252] Abercrombie, writing for the Journal of the Institute of American Architects, said in 1982: "The new hotel may do wonderful things for the area, but it could have been even more beneficial if another site had been chosen for it."[253] Michael Sorkin characterized the hotel as "hopelessly self-centered".[254] When the hotel finally opened, Goldberger called the design outdated, with the mass "looming over Times Square like an upended bunker".[58][255] Newsday said two years after the hotel's completion that the "exterior could hold its own against anything in Dallas", while the "interior resembles the set where Luke Skywalker battled Darth Vader."[203] Herbert Muschamp said: "Throughout the hotel, design issues a protective order that makes the city outside a forbidding presence, mercifully kept at bay."[256] U.S. News & World Report, which did not rank the hotel among the top 100 in New York City, wrote: "For some previous visitors it's this Marriott's high-caliber service that wins them over [...] but for others it's the enviable location."[52]

See also

  • List of buildings and structures on Broadway in Manhattan
  • List of hotels in New York City

References

  1. Emporis building ID 114261 Emporis^
  2. {{SkyscraperPage|5811}}^
  3. {{Structurae|20004343}}^
  4. ^
  5. 1535 Broadway, 10036 New York City Department of City Planning, retrieved March 25, 2021^
  6. 1535 Broadway – Marriott Marquis Privately Owned Public Space (APOPS), March 31, 2016, retrieved November 1, 2021^
  7. Abercrombie. 1982^
  8. Tanay Warerkar. See how Snøhetta's transformation of Times Square made it more pedestrian friendly Curbed NY, April 19, 2017, retrieved November 1, 2021^
  9. Rebecca Fishbein. Photos: Times Square's Transformation Into A Pedestrian-Friendly Tourist Fun Zone Is Complete Gothamist, April 19, 2017, retrieved November 1, 2021^
  10. Times Square – CECM Welcome to NYC.gov, November 5, 2020, retrieved November 1, 2021^
  11. Carol Lawson. Helen Hayes Honored as Theater Is Renamed The New York Times, July 22, 1983, retrieved November 8, 2021^
  12. Carter B. Horsley. New Proposal for Times Square Block The New York Times, February 20, 1981, retrieved October 30, 2021^
  13. Stern. Mellins^
  14. Nancy Neill. Bill Marriott Opens His Marquis Business Atlanta, Jul 1985^
  15. New York Marriott Marquis Emporis, retrieved January 1, 2021^
  16. New York Marriott Marquis Hotel – The Skyscraper Center Council on Tall Buildings and Urban Habitat, November 2, 2008, retrieved November 6, 2021^
  17. The Secret Floors of NYC's Marriott Marquis Hotel: Real or Urban Myth? Untapped New York, November 2, 2015, retrieved November 6, 2021^
  18. VIDEO: Ride the Elevator Up to the Marriott Marquis' Secret 55th Floor 6sqft, October 20, 2015, retrieved November 6, 2021^
  19. New York Marriott Marquis Host Hotels & Resorts, retrieved November 6, 2021^
  20. Ada Louise Huxtable. 54 -Story Hotel Expected to Revitalize Times Square The New York Times, July 11, 1973, retrieved October 30, 2021^
  21. Portman show to open on B'way in 1977 Progressive Architecture, Aug 1973, retrieved November 7, 2021^
  22. A bank that lures new customers Architectural Forum, Sep 1973, retrieved November 7, 2021^
  23. Brown. 1984^
  24. Eric P. Jr. Nash. Manhattan Skyscrapers Princeton Architectural Press, 1999^
  25. Philip H. Dougherty. Advertising; Times Sq. Presence For Kodak The New York Times, November 25, 1985, retrieved November 6, 2021^
  26. Irving Pasternack. Eastman Kodak Co. takes on Times Square The Daily Times, November 10, 1985, retrieved November 6, 2021^
  27. Courtney Kane. The Media Business: Advertising; Kodak has given its Times Square billboard a face lift to keep up with the neighborhood. The New York Times, December 23, 1999, retrieved November 7, 2021^
  28. Emily Steel. Times Square's Biggest and Most Expensive Digital Billboard Is Set to Shine The New York Times, November 17, 2014, retrieved November 6, 2021^
  29. Associated Press. 8-story-tall billboard to light up Times Square USA Today, November 18, 2014, retrieved November 6, 2021^
  30. Large HD Digital Advertising Display Lights Up New York Marriott Marquis Hotel Business, November 20, 2014, retrieved November 6, 2021^
  31. Damon Stetson. Putting Together a 50-story Extravaganza The New York Times, January 8, 1984, retrieved November 1, 2021^
  32. Virginia Mosquera. Marriott Marquis Renovation STRUCTURE magazine, November 5, 2012, retrieved November 6, 2021^
  33. Round Table; Concrete in architecture: a current assessment Architectural Record, Nov 1982, retrieved November 7, 2021^
  34. Eric Pace. For Broadway: A New Hotel With a Theater: Hotel With Theater Rising on Broadway The New York Times, July 6, 1983^
  35. Robin Herman, Laurie Johnston. New York Day by Day The New York Times, January 20, 1983, retrieved November 1, 2021^
  36. Clive Thompson. Smart Elevators The New York Times, December 10, 2006, retrieved November 6, 2021^
  37. Cities 101: How Do "Smart Elevators" Work? Untapped New York, August 8, 2013, retrieved November 6, 2021^
  38. Julia Angwin. No-button elevators take orders in lobby Sunday Gazette – Mail, November 19, 2006^
  39. New York Marriott Marquis Hotel Schindler Group, December 20, 2019, retrieved November 5, 2021^
  40. NY Marriott Installs New Elevator System Hotel Business, September 21, 2004, retrieved November 6, 2021^
  41. Maurice Carroll. 8-Block Shubert Alley Extension Is Aim The New York Times, May 3, 1970, retrieved November 1, 2021^
  42. David W. Dunlap. Marriott Marquis Builds Inner Roadway for Taxis The New York Times, July 28, 1984, retrieved November 1, 2021^
  43. Sam Roberts. Vertical Malls: City Sidewalks Move Indoors The New York Times, June 8, 1983, retrieved November 1, 2021^
  44. Here & There New York Daily News, August 18, 1985, retrieved November 2, 2021^
  45. Samuel G. Freedman. Nederlander Is Offered Hotel Theater Rights The New York Times, November 10, 1984, retrieved December 26, 2014^
  46. Samuel G. Freedman. New Theater in Hotel Assailed and Defended The New York Times, January 15, 1985, retrieved November 2, 2021^
  47. Pauline Brettell. An icon reinvented: New York Marriott Marquis renovated & reimagined Hotel Designs, August 31, 2022, retrieved November 17, 2022^
  48. Brown. 1984^
  49. Art of glass The Journal News, September 15, 1985, retrieved November 2, 2021^
  50. Broadway Restaurants & Lounge NYC New York Marriott Marquis, November 1, 2021, retrieved November 6, 2021^
  51. Broadway Lounge at the New York Marriott Marquis Time Out New York, March 22, 2017, retrieved November 6, 2021^
  52. New York Marriott Marquis U.S. News & World Report, retrieved November 7, 2021^
  53. Venues in Manhattan New York Marriott Marquis, November 6, 2021, retrieved November 6, 2021^
  54. Meeting Space NYC New York Marriott Marquis, November 1, 2021, retrieved November 6, 2021^
  55. Daniel Kahn. Motels Are Out, Hotels Rising Newsday, June 9, 1985, retrieved November 2, 2021^
  56. Stern. Fishman^
  57. Leslie Wayne. Marriott Stakes Out New Territory The New York Times, September 22, 1985, retrieved November 2, 2021^
  58. Paul Goldberger. Marriott Marquis Hotel: an Edsel in Times Sq.? The New York Times, August 31, 1985, retrieved November 2, 2021^
  59. Times Square Hotel Suite New York Marriott Marquis, November 2, 2021, retrieved November 2, 2021^
  60. C. J. Hughes. The Marriott Marquis, which revamped Times Square, turns 40 today Crain's New York Business, September 3, 2025, retrieved September 5, 2025^
  61. Jen Carlson. Photos From NYC's Only Revolving Restaurant Gothamist, July 15, 2016, retrieved November 1, 2021^
  62. Adrian Madlener. New York's only revolving restaurant is back in action Wallpaper Magazine, March 10, 2025, retrieved March 14, 2025^
  63. Diana Budds. The Revolving Restaurant Is Back Again (and Again) The New York Times, April 1, 2025, retrieved April 1, 2025^
  64. Eleanor Blau. Two Views of New York, One That Rotates The New York Times, January 24, 1986, retrieved November 6, 2021^
  65. McCandlish Phillips. Planners Ask: Will Success Spoil Times Sq.?; As Changes Near, Planners Ask: Will Success Spoil Times Sq.? The New York Times, July 24, 1969, retrieved October 30, 2021^
  66. Slow-Renting Times Sq. Skyscrapers Throw Pall Over Realty, Restaurants Variety, December 30, 1970^
  67. Extended Shubert Alley (To 46 St.) Stymied By Hotel Refusing to Sell Variety, September 24, 1969^
  68. Robert Venturi. Learning from Las Vegas MIT Press, 1977^
  69. Goldberger. 1973^
  70. William E. Geist. About New York; New Broadway Hotel Gets the Once Over The New York Times, October 12, 1985, retrieved November 6, 2021^
  71. Pictures: New Airconditioning Cost Closes Astor; Reade Site Vs. Subway Rumble; Landlords' Times Square Dilemma Variety, May 31, 1972^
  72. Michiko Kakutani. Portman Hotel: Broadway Is a House Divided The New York Times, January 24, 1982, retrieved November 1, 2021^
  73. Robert D. McFadden. $75-Million, 2,000-Room Hotel Is Being Planned for Times Sq. The New York Times, November 3, 1972, retrieved October 30, 2021^
  74. Owen Moritz. Times Sq. Hotel on Drawing Board New York Daily News, November 3, 1972, retrieved October 30, 2021^
  75. Personal Appearances: Times Sq. Looking Up; Map $75-Mil 56-Story Hotel Variety, November 8, 1972^
  76. Stern. Mellins^
  77. Amei Wallach. Good Times Ahead For Times Square Newsday, December 12, 1973, retrieved October 30, 2021^
  78. William G. Connolly. In Hotels, the Key Is Occupancy, and It Is Up a Little: Hotel Occupancy Up a Little The New York Times, December 17, 1972^
  79. Carter B. Horsley. Delay on Hotel Is Laid to Title The New York Times, April 30, 1973, retrieved October 30, 2021^
  80. Max H. Siegel. City Planning U nit Acts to Speed Building of Times Square Hotel The New York Times, July 12, 1973, retrieved October 30, 2021^
  81. Alfred Miele. City Will Show Plan for 150M Hotel, Theater New York Daily News, July 11, 1973, retrieved October 30, 2021^
  82. 54-story hotel set for NYC The Journal News, July 11, 1973, retrieved October 30, 2021^
  83. See: The Portman Style Newsweek, July 23, 1973 John Portman to build Times Square hotel Architectural Record, Aug 1973, retrieved November 7, 2021^
  84. Stern. Mellins^
  85. Dixie Kid Socko on Great White Way Progressive Architecture, Aug 1973, retrieved November 7, 2021^
  86. Glenn Fowler. Decision Awaited on a Permanent Times Sq. Mall The New York Times, January 21, 1975, retrieved October 30, 2021^
  87. Carter B. Horsley. Fiscal Crisis Perils Proposed Hotel Here The New York Times, January 29, 1975, retrieved October 30, 2021^
  88. Owen Moritz. Times Sq. Developer Calls for Financing New York Daily News, January 29, 1975, retrieved October 30, 2021^
  89. Sybil Baker. Eye Pension $ to Spur Building New York Daily News, March 4, 1975, retrieved October 30, 2021^
  90. Legitimate: Portman Hotel Project Dead; Morosco, Hayes Theatres Okay Variety, December 17, 1975^
  91. Portman Calling Off Times Square Hotel The Atlanta Constitution, December 14, 1975, retrieved October 30, 2021^
  92. Robert D. McFadden. Developer Drops Hotel Plan Here The New York Times, December 14, 1975, retrieved October 30, 2021^
  93. Charles Kaiser. Portman Says It Will Build Hotel On Times Square if U.S. Gives Aid The New York Times, March 1, 1978, retrieved October 30, 2021^
  94. Dick Brass. A 40-Stall Flea Market Gets Scratched by the City New York Daily News, April 15, 1976, retrieved October 30, 2021^
  95. Stewart Ain, Frank Lombardi. City Hopes Tax Incentives Can Spark Job Renaissance New York Daily News, January 11, 1976, retrieved October 30, 2021^
  96. Stern. Fishman^
  97. Joan Shepard. City Seeks 15M for a Hotel New York Daily News, March 1, 1978, retrieved October 30, 2021^
  98. See: Joy Allen. 5 'OKs' for Queens Newsday, August 18, 1978, retrieved October 30, 2021 Tax Package For Portman Hotel 'Sells' Times Sq. Variety, August 23, 1978^
  99. I. D. Robbins. The queen of the sweetheart deals New York Daily News, September 11, 1979, retrieved October 30, 2021^
  100. See: Joy Allen. Water, Sewer Waivers Vetoed Newsday, October 20, 1978, retrieved October 30, 2021 Alan S. Oser. About Real Estate Alexander's Weighs Ex-Macy Jamaica Site The New York Times, November 15, 1978, retrieved October 30, 2021 Miscellany: OK City Bid For Portman Mortgage Variety, October 25, 1978^
  101. Miscellany: Work To Start Next Spring On Portman Hotel In Times Sq Variety, September 20, 1978^
  102. See: Owen Moritz. Hoping to strike a gusher in Times Sq. New York Daily News, January 10, 1979, retrieved October 30, 2021 Steven R. Weisman. New York Pressing for U.S. Urban Aid The New York Times, January 28, 1979, retrieved October 30, 2021^
  103. Glenn Fowler. Plans for a Hotel At Times Square Nearer to Reality The New York Times, October 6, 1979, retrieved October 30, 2021^
  104. Owen Moritz. Times Sq. tune: 'Begin the big inn' New York Daily News, June 20, 1979, retrieved October 30, 2021^
  105. Glenn Fowler. Restoration of Times Sq. Moving Closer to Reality The New York Times, June 18, 1979, retrieved October 30, 2021^
  106. Paul Goldberger. Portman Drama: a Crowded Stage; News Analysis The New York Times, March 6, 1982, retrieved November 1, 2021^
  107. Financing Casts Doubt on Proposal For Portman's Times Square Hotel Theaters That Would Be Razed Rehabilitation Program Explained The New York Times, November 14, 1979, retrieved October 31, 2021^
  108. Keystone to a Renewal Taken Of the Market The New York Times, November 13, 1979, retrieved October 30, 2021^
  109. Owen Moritz. Piccadilly: No sale for new hotel New York Daily News, November 13, 1979, retrieved October 30, 2021^
  110. Paul Goldberger. Has Times Square Room for the Portman?; An Appraisal Different Attitudes Flamboyant Designs Vast Moving Sign Saddening Loss The New York Times, March 6, 1980, retrieved October 31, 2021^
  111. Gregory Gilmartin. Shaping the City: New York and the Municipal Art Societyy Clarkson Potter, 1995^
  112. Bill Peterson. White House Pressure on Panel May Doom Historic Theater The Washington Post, December 20, 1981^
  113. Owen Moritz. Upstaging Helen Hayes! A bad scene, says lawyer New York Daily News, November 1, 1979, retrieved October 30, 2021^
  114. Paul Goldberger. Issue and Debate What's the Proper Role of Landmarks Commission?; The Powers of the Commission What's the Legitimate Role Of the Panel on Landmarks? The Background For a Reduced Role For an Activist Role The Outlook The New York Times, October 1, 1980, retrieved October 31, 2021^
  115. See: Actors' Equity Criticizes Times Square Hotel Plan Newsday, December 4, 1979, retrieved October 30, 2021 C. gerald Fraser. Equity Moves to Save 3 Theaters The New York Times, December 5, 1979, retrieved October 30, 2021^
  116. Legitimate Theatre & Talent: IATSE Backs Plan For Portman Hotel Variety, March 5, 1980^
  117. See: Jennifer Allen. Battling over the Portman Hotel New York Daily News, February 10, 1981, retrieved October 31, 2021 James Carberry, Daniel Hertzberg. West Side Story: New York Plans Renewal of Sleazy Times Square; but the Planning Stage Is About as Far as It Gets The Wall Street Journal, August 20, 1980^
  118. C. Gerald Fraser. Actors Rally Against Hotel Plan; Union Plea for Jobs Picadilly Would Be Torn Down They Are Producers' Theaters' Producers Support Plan The New York Times, February 28, 1980, retrieved October 31, 2021^
  119. See: Katharine Schaffer. Sue to block Times Sq. hotel New York Daily News, March 12, 1980, retrieved October 31, 2021 Richard Hummler. Legitimate: Piccadilly Hotel Owners Sue To Block Portman Hotel Plan Variety, March 12, 1980^
  120. Stephen Hesse. Portman's Hotel Plans Draw New Opposition The Atlanta Constitution, April 23, 1980, retrieved October 31, 2021^
  121. See: C. Gerald Fraser. Board Vote Approves Portman Hotel The New York Times, July 18, 1980, retrieved October 31, 2021 Portman Plans Passed 23–15 Back Stage, July 25, 1980^
  122. Stern. Fishman^
  123. Don Nelsen. Portman Hotel: room for disagreement New York Daily News, July 18, 1980, retrieved October 31, 2021^
  124. The Portman Hotel, Without Reservations The New York Times, July 17, 1980, retrieved October 31, 2021^
  125. Portman Hotel Gets Praise and Censure The New York Times, August 7, 1980, retrieved October 31, 2021^
  126. Jean Joyce. Charge board okayed Portman without sufficient data on plans New York Daily News, October 13, 1981, retrieved November 1, 2021^
  127. Ronald Smothers. Proposal for Hotel Clears One Hurdle; City Gives Initial Approval to Seek More Federal Aid for 30-Story Times Square Complex 'A Strong Commitment' Grant Would Be Largest Yet The New York Times, November 23, 1980, retrieved October 31, 2021^
  128. See: Randy Smith. Key Times Square hotel clears last legal hurdle New York Daily News, December 3, 1980, retrieved October 31, 2021 Ronald Smothers. Hotel for Times Sq. Clears Key Hurdle; Accord Is Reached on Gaining Last Parcel for Portman Project 1984 Completion Is Planned Portman Hotel Project on Times Sq. Clears Key Hurdle in Acquiring Site 'It Looks Very Good' Obtaining the Financing The New York Times, December 3, 1980, retrieved October 31, 2021^
  129. Legitimate: Get O.K. For Portman Hotel; See Boom For Times Sq. Area, Though Foes File Another Suit Variety, December 10, 1980^
  130. Clyde Haberman. U.S. Withholds Funds for the Portman Hotel Planned for Times Square The New York Times, January 9, 1981, retrieved October 31, 2021^
  131. Randy Smith. HUD stalls Portman's Times Square hotel New York Daily News, January 9, 1981, retrieved October 31, 2021^
  132. See: Vincent Cosgrove. Koch sees threat to Portman project New York Daily News, February 9, 1981, retrieved October 31, 2021 Steven R. Weisman. Reagan Is Reported Ready to Eliminate Urban Aid Program The New York Times, February 4, 1981, retrieved October 31, 2021^
  133. Irvin Molotsky. Times Sq. Plans Tied to Program Reagan Opposes The New York Times, February 4, 1981, retrieved October 31, 2021^
  134. See: Grant OKd for Hotel, Green Says Newsday, April 3, 1981, retrieved October 31, 2021 Ron Howell. Portman Hotel gets fed grant New York Daily News, April 4, 1981, retrieved October 31, 2021 Miscellany: O.K. Key Federal Grant For Portman Hotel, N.Y.; Equity Suit Still A Snag Variety, April 8, 1981^
  135. Chris Jennewein. Portman Going Ahead On Plan For NYC Hotel The Atlanta Constitution, January 9, 1981, retrieved October 31, 2021^
  136. Site To Be Cleared The Atlanta Constitution, January 30, 1981, retrieved October 31, 2021^
  137. Sallye Salter. Marriott May Run Portman's New Hotel The Atlanta Constitution, March 18, 1981, retrieved October 31, 2021^
  138. Charles V. Bagli. Audit Criticizes 1998 Deal by City for Times Sq. Hotel The New York Times, February 12, 2013, retrieved November 6, 2021^
  139. Edward A. Gargan. Package Signed for Financing Portman Hotel The New York Times, March 22, 1982, retrieved November 1, 2021^
  140. See Way Clearing For Construction Of Portman Hotel Variety, July 8, 1981^
  141. See: Robin Schatz. Portman's N.Y. Project Still Controversial The Atlanta Constitution, August 14, 1981, retrieved October 31, 2021 Legitimate: Opponents Dominate Public Hearing Debate On Portman Hotel, N.Y. Variety, July 15, 1981^
  142. Paul Goldberger. Architecture View; the Portman Project: Is It an Asset or an Albatross? The New York Times, January 31, 1982, retrieved November 1, 2021^
  143. See: Joyce Purnick. Revised Hotel Design Urged to Save Theaters The New York Times, September 13, 1981, retrieved October 31, 2021 Bruce Chadwick. New design offered for Portman Hotel New York Daily News, September 15, 1981, retrieved October 31, 2021 Miscellany: Portman Foes Suggest Way to Retain Theatres but Developer Says Nix Variety, September 16, 1981 Joyce Purnick. Revised Hotel Design Urged to Save Theaters The New York Times, September 13, 1981, retrieved October 31, 2021^
  144. See: Bruce Chadwick. Roadblock averted for Portman Hotel New York Daily News, October 5, 1981, retrieved November 1, 2021 Legitimate: City Commission Nixes New Plan For Portman N.Y. Variety, October 7, 1981^
  145. Bruce Chadwick. Honor architect's plan to save theaters New York Daily News, June 3, 1982, retrieved November 1, 2021^
  146. Abercrombie. 1982^
  147. Paul Goldberger. Projected Mall in Times Sq. Area Losing Support The New York Times, May 5, 1982, retrieved November 1, 2021^
  148. Morosco Fails to Get U.S. Historic Status The New York Times, March 9, 1981, retrieved October 31, 2021^
  149. U.S. Interior Dept. Is New Factor On Portman Hotel Variety, November 11, 1981^
  150. See: Morosco Gains as Landmark The New York Times, November 22, 1981, retrieved November 1, 2021 Owen Moritz. Portman hotel start delayed New York Daily News, November 19, 1981, retrieved November 1, 2021^
  151. Stern. Fishman^
  152. Ben A. Franklin. 2 Reagan Aides Acted to Speed Portman Hotel The New York Times, December 28, 1981, retrieved November 1, 2021^
  153. Stern. Fishman^
  154. See: Court Bars Demolitions On Portman Hotel Site The Atlanta Constitution, January 7, 1982, retrieved November 1, 2021 Mary Ann Giordano. Court stalls razing of Broadway theaters New York Daily News, January 7, 1982, retrieved November 1, 2021 Arnold H. Lubasch. Stay Is Granted on Plan to Raze 2 City Theaters The New York Times, January 7, 1982, retrieved November 1, 2021^
  155. Ronald Sullivan. State and U.S. Courts Conflict on Portman Project The New York Times, January 10, 1982, retrieved November 1, 2021^
  156. See: Broadway Theater Razed Newsday, January 15, 1982, retrieved November 1, 2021 Glenn Fowler. Demolition of Bijou Starts for Portman Hotel The New York Times, January 14, 1982, retrieved November 1, 2021^
  157. See: Judge Says White House Didn't Push Portman Plan The Atlanta Constitution, February 12, 1982, retrieved November 1, 2021 Clear Ron aides in Portman flap New York Daily News, February 12, 1982, retrieved November 1, 2021 Arnold H. Lubasch. Portman Plan Clears Another Hurdle The New York Times, February 12, 1982, retrieved November 1, 2021^
  158. See: Here and there... New York Daily News, March 2, 1982, retrieved November 1, 2021 C. Gerald Fraser. Two Broadway Theaters Given a Reprieve by Appeals Judge The New York Times, March 2, 1982, retrieved November 1, 2021^
  159. Legitimate: Appeals Judge Extends Delay Of Morosco, Hayes Demolition Variety, March 10, 1982^
  160. Paul L. Montgomery. Judge Dismisses Another Appeal in Portman Plan The New York Times, March 20, 1982, retrieved November 1, 2021^
  161. See: Frank J. Prial. Top State Court Refuses to Block Theater Razing The New York Times, March 17, 1982, retrieved November 1, 2021 State's Top Court OKs Portman Hotel Newsday, March 17, 1982, retrieved November 1, 2021^
  162. Theater appeal rejected The Daily Times, March 21, 1982, retrieved November 1, 2021^
  163. See: Bruce Chadwick. Robert Redford among Portman Hotel foes New York Daily News, March 19, 1982, retrieved November 1, 2021 The City; A New Petition On Portman Hotel The New York Times, March 19, 1982, retrieved November 1, 2021^
  164. See: Frank J. Prial. Court Stay Lifted and Demolition Begins at Two Broadway Theaters The New York Times, March 23, 1982, retrieved November 1, 2021 Randy Banner, T.J. Collins. Bringing Down the House a Final Time Newsday, March 23, 1982, retrieved November 1, 2021^
  165. Carol Lawson. Wrecking Halts at the Helen Hayes to Save Artworks The New York Times, March 27, 1982, retrieved November 1, 2021^
  166. Bruce Chadwick. Guilt seems to be driving pols to save theaters New York Daily News, May 28, 1982, retrieved November 1, 2021^
  167. Frank J. Prial. Final Contracts to Be Signed Today for the Portman Hotel The New York Times, July 2, 1982, retrieved November 1, 2021^
  168. See: Owen Moritz. Goodby, Piccadilly; Hello, Portman New York Daily News, July 1, 1982, retrieved November 1, 2021 Dennis Duggan. Portman Hotel Gets Financing Newsday, July 2, 1982, retrieved November 1, 2021^
  169. Hotel work progresses Star-Gazette, July 4, 1982, retrieved November 1, 2021^
  170. Legitimate: Sign Portman Hotel Contracts; $320-Mil Cost, See '85 Completion Variety, July 7, 1982^
  171. See: Larry Sutton. Midtown memories on sale New York Daily News, July 15, 1982, retrieved November 1, 2021 Clyde Haberman, Laurie Johnston. New York Day by Day; Buying a Piece of the Past The New York Times, July 16, 1982, retrieved November 1, 2021^
  172. Liz Smith. An expensive Selleck-tion of denim New York Daily News, November 21, 1982, retrieved November 1, 2021^
  173. George W. Goodman. City Adding 3,500 Hotel Rooms The New York Times, November 7, 1982, retrieved November 1, 2021^
  174. Brown. 1984^
  175. Sallye Salter. New hotel dubbed 'Marriott Marquis' The Atlanta Constitution, December 18, 1982, retrieved November 1, 2021^
  176. Glenn Fowler. New York Tourism Nearly Matches 1981 Levels The New York Times, December 26, 1982, retrieved November 1, 2021^
  177. Liz Smith. Berle jumps back in the Friaring pan New York Daily News, January 30, 1983, retrieved November 1, 2021^
  178. Mark McCain. NYC plans new look for 42d street: A $1.5b project to restore major block of Times Square Boston Globe, August 24, 1983^
  179. Martin Gottlieb. Minority Protesters Interrupt Marriott Hotel Construction The New York Times, July 26, 1983, retrieved November 2, 2021^
  180. THE CITY; Marriott Marquis Meets Hiring Rule The New York Times, August 27, 1983, retrieved November 2, 2021^
  181. Robert Guenther. Building Distrust: Construction Industry In New York Is Hotbed Of Extortion, Bribery; Organized Crime, Sabotage By Workers Contribute To High Cost of Building; Complicity of Management Building Distrust: New York's Construction Industry Has Problems Ranging From Extortion to Sabotage The Wall Street Journal, 7 May 1986^
  182. Marriott Refinances New York City Hotel With Lender Group The Wall Street Journal, January 5, 1984^
  183. M. J. Ogden. Looking ahead: Some thoughts The Daily Item, March 10, 1984, retrieved November 2, 2021^
  184. James Barron. The Year 2000: the Hyperbole; a Countdown Worth the Wait Vs. A Big Ho-hum The New York Times, January 2, 2000, retrieved November 7, 2021^
  185. Ellen Uzelac. Marriott beats 2d-generation jinx as son builds on success: 'Uncannily correct' leadership praised The Sun, March 10, 1985^
  186. Anna Quindlen. The Great Quest for Hotel Guests The New York Times, April 28, 1985, retrieved November 2, 2021^
  187. Matthew L. Wald. The Hoary Tradition of Topping-out The New York Times, October 21, 1984, retrieved November 2, 2021^
  188. James Harney. 'Gem' of a hotel is tops with them New York Daily News, October 24, 1984, retrieved November 2, 2021^
  189. Briefly Star-Gazette, October 24, 1984, retrieved November 2, 2021^
  190. Nederlanders To Operate New Marriott Hotel Back Stage, November 16, 1984^
  191. Painter dies at construction site New York Daily News, July 2, 1985, retrieved November 2, 2021^
  192. Susan Heller Anderson, David W. Dunlap. New York Day by Day; Dining for Practice The New York Times, August 23, 1985, retrieved November 2, 2021^
  193. Company News; Host Marriott Adds to Marquis Hotel Stake The New York Times, December 28, 1993, retrieved November 7, 2021^
  194. Ethan Schwartz. Marriott Marquis Opens Its Doors The New York Times, September 4, 1985, retrieved October 30, 2021^
  195. The City; Marriott Marquis Delays Opening The New York Times, September 2, 1985, retrieved November 2, 2021^
  196. Bill Reel. Here's the Marquis; de Sade's next door New York Daily News, September 5, 1985, retrieved November 2, 2021^
  197. Samuel G. Freedman. Actors Equity Opposes Marriott Benefit The New York Times, October 5, 1985, retrieved November 2, 2021^
  198. Owen Moritz. New Jersey staging a coup New York Daily News, October 13, 1985, retrieved November 2, 2021^
  199. Kate Rounds. How a Visitor to the Big Apple Distributes a Dollar All Around Crain's New York Business, March 31, 1986^
  200. Jeremy Gerard. A Brassy Bassey Opens the Marquis Newsday, July 11, 1986, retrieved November 7, 2021^
  201. Legitimate: Koch Opens New Marquis Theater, Vows To Preserve Older Houses Variety, July 16, 1986^
  202. Linda Moss. How Marriott Makes It Here: With Discounts Crain's New York Business, August 31, 1987^
  203. Jonathan Mandell. The Board of Broadway Newsday, October 13, 1987, retrieved November 6, 2021^
  204. Matt Vasilogambros. The Roots of NFL Draft Obsession The Atlantic, April 28, 2016, retrieved November 7, 2021^
  205. Damon Hack. N.F.L. Is Seeking New Home for Draft The New York Times, February 11, 2005, retrieved November 7, 2021^
  206. Mark McCain. COMMERCIAL PROPERTY: New Times Square Hotels; 3 Hostelries to Join the Marquis, a Hit on Broadway The New York Times, May 21, 1989, retrieved November 7, 2021^
  207. David W. Dunlap. From Dust of Demolition, a New Times Square Rises The New York Times, July 6, 1988, retrieved November 7, 2021^
  208. Growing Big Apple Tourism Yields New Crop of Hotels The Wall Street Journal, May 23, 1988^
  209. Host Marriott mulls Fairfield sale, takes New York hotel stake The Wall Street Journal, December 29, 1993^
  210. Stuart Elliott. The Media Business: Advertising; After a 55-year absence, Maxwell House coffee embraces the Times Square market again. The New York Times, November 17, 1994, retrieved November 7, 2021^
  211. Charles V. Bagli. Marriott Set Out to Prove Itself In New York; Now It Dominates The New York Times, May 22, 1997, retrieved November 7, 2021^
  212. Emily DeNitto. More room at inn Crain's New York Business, August 12, 1996^
  213. Alex Markels. Management: How One Hotel Manages Staffs Diversity The Wall Street Journal, November 20, 1996^
  214. Lisa W. Foderaro. New Sign in Times Square The New York Times, July 18, 1997, retrieved November 6, 2021^
  215. Laura Kusisto. Old Marriott Deal Gets New Scrutiny The Wall Street Journal, February 13, 2013, retrieved November 6, 2021^
  216. Brittany Natale. Marriott Marquis 'Sweetheart Deal' With Giuliani-Era City Hall Is the Gift That Keeps On Taking, Comptroller John Liu Says The Village Voice, February 12, 2013, retrieved November 6, 2021^
  217. Fred A. Bernstein. An Elevator to Your Floor, With No Local Stops The New York Times, November 2, 2005, retrieved November 8, 2021^
  218. Paul B. Brown. How Many Miles to the Bushel? The New York Times, May 27, 2006, retrieved November 8, 2021^
  219. Cara Tabachnick. Spending the night in Times Square luxury The Real Deal, October 10, 2007, retrieved November 6, 2021^
  220. Diane Cardwell, Ray Rivera. Long Robust, Gains in New York City Property Values Start to Flatten Out The New York Times, January 16, 2008, retrieved November 8, 2021^
  221. Richard L. Johnson. Marriott and Host Hotels & Resorts Unveil $39 Million Renovation of the 1,946-room New York Marriott Marquis in Times Square / September 2011 Hotel-Online, September 22, 2011, retrieved November 6, 2021^
  222. Jacqueline Palank. Kodak Aims to Sell Lease on Times Square Billboard The Wall Street Journal, April 5, 2012, retrieved November 7, 2021^
  223. Noreen Malone. The Huge Kodak Sign in Times Square Won't Be There Much Longer Intelligencer, April 6, 2012, retrieved November 7, 2021^
  224. Barbra Murray. Marriott Marquis Times Square to Get $140M Retail Makeover Commercial Property Executive, August 3, 2012, retrieved November 6, 2021^
  225. Retail of Times Square Marriott to get upgrade Crain's New York Business, August 2, 2012, retrieved November 6, 2021^
  226. Eliot Brown. Ads, Not Tenants, Make Times $quare The Wall Street Journal, December 26, 2012, retrieved November 6, 2021^
  227. Rowley Amato. ESD Sells Times Sq Marriott Marquis for Mere $20 Million Curbed NY, December 15, 2013, retrieved November 6, 2021^
  228. Katherine Clarke. Times Square Marriott Marquis sold in controversial $20M deal The Real Deal New York, December 12, 2013, retrieved November 6, 2021^
  229. Eddie Small. Vornado is buying Marriott Marquis retail for $442M The Real Deal New York, September 24, 2018, retrieved November 6, 2021^
  230. Betsy Kim. Vornado Acquires Marriott Marquis Retail GlobeSt, September 26, 2018, retrieved November 6, 2021^
  231. NYC's Marriott Marquis Set To Outsource $50 Million+ Food & Beverage Operation Total Food Service, March 17, 2021, retrieved November 6, 2021^
  232. Kate King. Marriott Lays Off Hundreds of Workers at Times Square Hotel The Wall Street Journal, December 15, 2020, retrieved November 6, 2021^
  233. 850 Workers Fired at Non-union Marriott Marquis in Times Square hotelworkers.org, retrieved November 6, 2021^
  234. Sophia Chang. Marriott Marquis Workers Rally For Severance And Rehire Rights Following Layoff Announcement Gothamist, January 16, 2021, retrieved November 6, 2021^
  235. Nick Garber. Laid-Off Marriott Marquis Workers Protest In Times Square Midtown-Hell's Kitchen, NY Patch, December 27, 2020, retrieved November 6, 2021^
  236. Nick Garber. Layoffs Of 850 Marriott Marquis Workers Probed By State AG Midtown-Hell's Kitchen, NY Patch, April 8, 2021, retrieved November 6, 2021^
  237. After a 35-Year Battle, Marriott Marquis Workers Win Union Recognition With The Hotel Trades Council, Finally Organizing The Largest & Oldest Non-Union Hotel In NYC WNY Labor Today, January 13, 2021, retrieved November 6, 2021^
  238. Earl Caldwell. As hotel rises, so do union's hopes New York Daily News, May 25, 1983, retrieved November 6, 2021^
  239. Omnibuild completes $30 million renovation of Marriott Marquis in Times Square New York Business Journals, August 24, 2021, retrieved November 6, 2021^
  240. Omnibuild completes $30 million renovation of Marriott Marquis in Times Square NYREJ, August 24, 2021, retrieved November 6, 2021^
  241. Rachel Chapman. You Can Book An Insta-Worthy 'Beetlejuice' Suite In NYC That's Peak Tim Burton Elite Daily, October 19, 2022, retrieved November 17, 2022^
  242. Morgan Carter. New York's only revolving restaurant, The View, is getting a makeover Time Out New York, October 9, 2024, retrieved October 10, 2024^
  243. Emma Orlow. Danny Meyer Is Reopening New York's Revolving Restaurant Eater NY, October 8, 2024, retrieved October 10, 2024^
  244. Florence Fabricant. The View Rotates Above Manhattan Once Again The New York Times, February 11, 2025, retrieved February 12, 2025^
  245. Anna Hezel. The Revolving Restaurant Above Times Square Is Spinning Again Grub Street, February 5, 2025, retrieved February 12, 2025^
  246. Aaron Elstein. Vornado taps Times Square property for $450M in cash Crain's New York Business, April 24, 2025, retrieved April 27, 2025^
  247. Vornado to boost cash by $425M from Times Square financing deal The Real Deal, April 25, 2025, retrieved April 29, 2025^
  248. Florian Rotberg. NRF 2026: Farewell to Times Square's Iconic Marriott LED invidis, 2026-01-12, retrieved 2026-01-15^
  249. Ada Louise Huxtable. Architecture View: More Bad News About Times Square The New York Times, February 9, 1975^
  250. Stern. Mellins^
  251. George W. S. Trow. The Talk of the Town; Some Dazzle for the Garden The New Yorker, July 23, 1973^
  252. Stern. Fishman^
  253. Abercrombie. 1982^
  254. Michael Sorkin. Leisure and the Arts: Portman's Hotel: Assault on a Mythic Center? The Wall Street Journal, January 22, 1982^
  255. Stern. Fishman^
  256. Herbert Muschamp. Architecture View; The Thrill of Outer Space for Earthbound Lives The New York Times, September 20, 1992, retrieved November 7, 2021^