Wynental and Suhrental Railway
A former Swiss privately owned metre-gauge railway company serving the Wynental and Suhrental valleys in the canton of Aargau.
Last updated August 25, 2026
Overview
The Wynental and Suhrental Railway, commonly abbreviated WSB and known in German as Wynental- und Suhrentalbahn, was a privately owned railway company in the Swiss canton of Aargau. It was created on 24 June 1958 through the merger of two electrically operated metre-gauge railway undertakings: the Wynental Railway, which connected Aarau with Reinach and later Menziken, and the Aarau-Schöftland Railway, which linked Aarau with Schöftland in the Suhrental. The merged company provided regional passenger transport in two adjoining valleys, although its routes were initially separated by the Swiss Federal Railways station and infrastructure in Aarau. The constituent lines had different origins. The Aarau-Schöftland Railway opened in 1901 after being developed from the outset as a narrow-gauge electric railway with substantial tramway-style street running. The Wynental Railway followed in 1904, opening first between Aarau and Reinach and extending to Menziken later that year. Earlier proposals for the Wynental had envisaged standard-gauge steam railway lines, but local authorities and communities ultimately favored a less expensive electric narrow-gauge system suited to the valley's constrained geography. After the 1958 merger, WSB had to manage both physical and operational fragmentation. Its two routes did not form a continuous railway, and increasing road traffic created reliability and safety problems where tracks ran in or alongside public roads. The company progressively modernized its infrastructure by relocating tracks, constructing separated alignments, improving stations, and reducing tramway-like sections. A significant connection between the two former railway systems was created in 1967, when the Aarau-Schöftland branch was diverted through a tunnel to the WSB station on the south side of Aarau's SBB railway station. Further route improvements continued for several decades. The line through Gränichen was substantially realigned in 1985. Following the end of passenger services on the former SBB route between Beinwil am See and Beromünster in 1991, WSB developed plans to use part of the released corridor. The Reinach Nord–Menziken section was rebuilt and opened on 15 December 2002. In Muhen, the Suhrental route was diverted away from the road in 2004. Between 2008 and 2010, the Aarau–Suhr section was also rebuilt on the former right of way of a closed standard-gauge SBB branch, including a new underpass and improved interchange facilities at Suhr. WSB also participated in a broader regional transport identity. In 2002 it introduced the AAR bus+bahn umbrella brand jointly with Busbetrieb Aarau, the city's bus operator. The two companies retained separate legal identities but shared some senior management and presented their services under the common brand. This arrangement ended when WSB merged with BDWM Transport on 19 June 2018 to create Aargau Verkehr. The WSB corporate identity and the AAR bus+bahn umbrella brand were consequently discontinued, while the railway line continued operating under Aargau Verkehr ownership and management. The surviving metre-gauge service remains an important regional public-transport corridor between Menziken, Aarau, and Schöftland.
History
The railway history of the Wynental began with local efforts in 1871 to secure concessions for standard-gauge steam railway routes from Aarau through the valley toward Reinach and from Beinwil am See toward Menziken. The proposals were approved in principle by the canton of Aargau in 1872 but failed to progress, in part because communities disagreed about the precise route through the narrow valley. A section between Beinwil am See and Menziken was eventually built by the Seetal Railway and opened in 1883, later extending to Münster, now Beromünster. Local communities subsequently concluded that a metre-gauge electric tramway would be more practical and economical than a standard-gauge railway. Construction of the Wynental Railway began in January 1903. Service between Aarau and Reinach opened on 5 March 1904, followed by the extension to Menziken on 1 May. The line initially used a street terminus north of the Swiss Federal Railways station in Aarau; in 1924, the company opened its own station south of the SBB tracks. The neighboring Suhrental developed a separate railway project. Brown, Boveri & Cie obtained the concession for an electrically powered narrow-gauge railway, much of which was designed to operate as a tramway. The Aarau-Schöftland Railway began service on 19 November 1901. An intended extension from Schöftland to Triengen, where it could have connected with the Sursee-Triengen Railway, was never constructed. Like the Wynental line, the Aarau-Schöftland Railway originally terminated in the street north of Aarau's SBB station. The two companies merged on 24 June 1958. WSB inherited two routes that were not physically joined and that were increasingly affected by motor-vehicle traffic. In 1967, the former Aarau-Schöftland route was moved from city streets into a 260-metre tunnel leading to the former Wynental Railway station south of the SBB station, creating a more coherent operating arrangement. Infrastructure modernization continued as road traffic increased. The company sought to remove tracks from busy roads or provide fully separated alignments where space permitted. A major reconstruction in Gränichen changed the route in 1985. After passenger services on the SBB line between Beinwil am See and Beromünster ended in 1991, WSB planned to use the released railway corridor. Work began in 1999 after freight traffic had also ceased, and the rebuilt Reinach Nord–Menziken section opened on 15 December 2002. The Suhrental line received a major diversion in Muhen on 5 December 2004. The Aarau–Suhr section was later rebuilt between 2008 and 2010. The new alignment used the right of way of a closed SBB standard-gauge branch running broadly parallel to the former route in the Kantonsstrasse K 242. The project included an underpass beneath the SBB Zofingen–Wettingen line and new platforms at Suhr station, enabling more direct interchange. The rebuilt section entered service on 22 November 2010. In 2002, WSB and Busbetrieb Aarau adopted the AAR bus+bahn umbrella brand. The companies remained legally distinct but coordinated their public presentation and shared some senior managers. On 19 June 2018, WSB merged with BDWM Transport to create Aargau Verkehr. The formation of Aargau Verkehr ended the independent WSB corporate structure and also brought the AAR bus+bahn umbrella brand to an end. The Menziken–Aarau–Schöftland railway continued in service under Aargau Verkehr.
- 2018Aargau Verkehr formed
WSB merged with BDWM Transport on 19 June to create Aargau Verkehr.
- 2010Aarau–Suhr rebuilt section entered service
The rebuilt section opened on 22 November with a new alignment, an underpass, and improved interchange facilities at Suhr.
- 2004Muhen diversion opened
The Suhrental route through Muhen was moved away from the road on 5 December.
- 2002AAR bus+bahn launched
WSB and Busbetrieb Aarau introduced a shared umbrella brand for their railway and bus operations.
- 2002Reinach Nord–Menziken reconstruction opened
The rebuilt section using part of the former SBB corridor opened on 15 December.
- 1985Gränichen route reconstruction
The railway alignment through Gränichen was substantially changed to improve separation from road traffic.
- 1967Aarau tunnel connection
The former Aarau-Schöftland route was diverted through a 260-metre tunnel to the WSB station south of Aarau's SBB station.
- 1958Formation of WSB
The Wynental Railway and Aarau-Schöftland Railway merged on 24 June to create the Wynental and Suhrental Railway.
- 1924New Wynental Railway station in Aarau
The Wynental Railway moved from its original street terminus north of the SBB station to a dedicated station south of the railway tracks.
- 1904Wynental Railway opened
The Wynental Railway opened from Aarau to Reinach on 5 March and extended to Menziken on 1 May.
- 1901Aarau-Schöftland Railway opened
The electrically operated narrow-gauge Aarau-Schöftland Railway began service between Aarau and Schöftland on 19 November.
- 1883Beinwil am See–Menziken section opened
The Seetal Railway opened the section that later formed part of the historical rail network serving the upper Wynental.
- 1871Initial Wynental railway proposal
Municipalities in the Wynental formed a committee seeking concessions for proposed railway routes through the valley.
Products and positioning
A regional electric narrow-gauge railway focused on reliable public transport between valley communities and the transport hub at Aarau.
Menziken–Aarau–Schöftland railway lineRegional passenger railway1958
WSB's principal operating asset was a metre-gauge electric railway linking Menziken in the upper Wynental with Aarau and continuing through the Suhrental to Schöftland. The route combined dedicated railway alignments with historically tramway-like sections and provided local access to communities along both valleys. After WSB's 2018 merger, ownership and operation of the line continued under Aargau Verkehr.
Regional public transport servicesRail transport1958
The company provided scheduled regional passenger transportation rather than manufactured consumer products. Its service model centered on electrically powered narrow-gauge trains, connections at Aarau with the Swiss Federal Railways network, and local mobility within the Wynental and Suhrental valleys.
Flagship businesses
- Menziken–Aarau–Schöftland railway service
- Aarau-area connections with Swiss Federal Railways services
- Regional service in the Wynental and Suhrental valleys
Marketing campaigns
- 2002AAR bus+bahn
Aarau · Aargau, Switzerland
WSB and Busbetrieb Aarau introduced AAR bus+bahn as a shared umbrella identity for railway and city-bus services. The initiative presented the two legally separate operators as part of a coordinated regional mobility offering.
Outcome. The umbrella identity was discontinued after WSB and BDWM Transport merged to form Aargau Verkehr in 2018.
Brand decisions
- 2018Merge with BDWM TransportM&A
The regional railway sector in Aargau was reorganized around cooperation between WSB and the other narrow-gauge operator BDWM Transport.
What changed. WSB merged with BDWM Transport on 19 June 2018, forming Aargau Verkehr.
Aftermath. WSB ceased to exist as an independent company. Its former railway line continued under Aargau Verkehr, while the AAR bus+bahn umbrella brand was dissolved.
- 2002Adopt the AAR bus+bahn umbrella brandStrategy
WSB and Busbetrieb Aarau sought to present their railway and bus services as a coordinated regional public-transport network.
What changed. Both companies placed the AAR bus+bahn identity prominently on vehicles and used the umbrella name in public presentation while remaining legally distinct.
Aftermath. The shared brand ended in 2018 when WSB became part of Aargau Verkehr and the two operators returned to separate brands and management structures.
- 2002Rebuild the Reinach Nord–Menziken sectionGeneration change
The end of passenger services on the parallel SBB route between Beinwil am See and Beromünster created an opportunity to relocate WSB away from tramway-like infrastructure.
What changed. After preparatory work beginning in 1999, WSB opened a rebuilt Reinach Nord–Menziken section on 15 December 2002 using part of the former SBB corridor.
Aftermath. The reconstruction provided a more railway-like alignment in the upper Wynental and reduced exposure to road traffic.
- 1967Connect the two Aarau railway terminiStrategy
The merged company's Wynental and Suhrental routes were not physically connected, and the former Aarau-Schöftland line still used a street terminus north of the SBB station.
What changed. WSB routed the former Aarau-Schöftland branch through a 260-metre tunnel to the former Wynental Railway station south of the SBB tracks.
Aftermath. The project created a more integrated operating arrangement in Aarau and reduced reliance on the former city-centre street alignment.
Recent events
- 2018WSB merged with BDWM Transport to form Aargau Verkehr
The merger on 19 June 2018 ended WSB as an independent railway company and transferred the line to the newly formed Aargau Verkehr.
M&ALeadership change - 2002WSB introduced the AAR bus+bahn umbrella brand
WSB and Busbetrieb Aarau began using AAR bus+bahn as a shared public-facing identity while remaining legally separate organizations.
Campaign - 1958WSB created through merger of the Wynental Railway and Aarau-Schöftland Railway
The two Aargau metre-gauge railway companies merged on 24 June 1958 to form the Wynental and Suhrental Railway.
M&A
Sources
Cite this profile: Cite the canonical profile. /brand-wiki/wynental-and-suhrental-railway · Editorial policy · How profiles are compiled