Sabah State Railway
Sabah's state-operated metre-gauge railway, providing passenger and freight services between the west coast and the interior town of Tenom.
Last updated August 25, 2026
Overview
Sabah State Railway, also known as Jabatan Keretapi Negeri Sabah, is the railway system and operating department of the Malaysian state of Sabah. It is the only operational rail system on the island of Borneo and is administered separately from Keretapi Tanah Melayu Berhad, Malaysia's federally owned railway operator in Peninsular Malaysia. Although KTMB has assisted with rehabilitation, training and technical work, Sabah State Railway remains a distinct state railway organization rather than a branch of KTMB. The railway's current operational route is a 134-kilometre, single-track, metre-gauge, non-electrified line running from Tanjung Aru and the Kota Kinabalu area on Sabah's west coast to Tenom in the Interior Division. Intermediate stations include Putatan, Papar, Beaufort, Halogilat, Rayoh and Pangi. Beaufort serves as an important interchange and operating point, while the section beyond Halogilat toward Tenom has more demanding track and terrain conditions. The railway carries both passengers and freight, although passenger services form the most visible part of its public role. Services are relatively infrequent, journey times are long, and operations can be affected by landslides, flooding and other problems associated with Sabah's terrain and heavy rainfall. The system originated during the late nineteenth-century development of North Borneo under the North Borneo Chartered Company. Expansion of tobacco plantations created a need to move agricultural produce from inland areas to coastal ports. Construction began in 1896 under engineer Arthur Joseph West, with assistance from Gounon Lulus, a Murut member from the Keningau area. The first section connected the Bukau River area with Beaufort and Weston. Extensions reached Tenom in 1905 and Melalap in 1906, while a separate coastal route linked Beaufort with Jesselton, now Kota Kinabalu. At its greatest extent, the network covered approximately 193 kilometres. Much of the network was destroyed during the Second World War. Post-war rehabilitation was undertaken in stages, including major programmes in 1949 and 1960. Declining use, high operating costs and the growth of road transport led to the closure of the Weston branch in 1963, the Melalap extension in 1970 and the Kota Kinabalu section beyond Tanjung Aru in 1974. The surviving railway therefore became a truncated west-coast-to-interior route rather than a wider regional network. A major maintenance closure took place in 2007, during which large numbers of wooden sleepers were replaced with concrete sleepers. The Tanjung Aru–Beaufort section reopened in February 2011 with improved operating speeds. Subsequent modernization efforts included the purchase or allocation of diesel multiple units, track equipment and rehabilitation funding. The state and federal governments also considered restoring or expanding parts of the network, including proposed connections toward Kudat, Sandakan and Tawau. These projects have required feasibility studies and funding decisions and should not be treated as completed extensions. Sabah State Railway also supports tourism. The heritage-oriented North Borneo Railway service operates as a separate tourism offering using the historic railway corridor between Kota Kinabalu and Papar. The railway continues to serve remote communities, local travel and the movement of goods, but its aging infrastructure, safety challenges and limited frequency have remained recurring public concerns. Its present role is consequently both practical and symbolic: it is a modest regional railway, an important rural transport link and a surviving remnant of Sabah's colonial-era transport infrastructure.
History
Sabah State Railway developed from the railway network built in North Borneo during the period of the North Borneo Chartered Company. In the 1880s, tobacco cultivation expanded and created demand for reliable inland transport. Roads and other infrastructure were insufficient for moving plantation output to coastal shipping points, encouraging the company to develop a railway. Construction began in 1896 under engineer Arthur Joseph West, assisted by Gounon Lulus. The first line ran between the Bukau River area and Beaufort, with a southern continuation to Weston. A further extension reached Tenom in 1905, and the line was extended from Tenom to Melalap the following year. Work also proceeded on a coastal route between Beaufort and Jesselton, the town now known as Kota Kinabalu. The resulting network covered roughly 193 kilometres and supported both commercial agriculture and local transport. The Second World War caused extensive destruction. In 1945, after the railway was secured from Japanese control, the 24th Australian Infantry Brigade operated portions of it using improvised equipment, including converted jeeps. Reconstruction followed after the war. Rehabilitation programmes in 1949 and 1960 restored parts of the system, but the network did not retain its former extent. The Weston branch closed in 1963, the Melalap extension stopped operating in 1970, and the main line was cut back from Kota Kinabalu to Tanjung Aru in 1974. Road construction and the high cost of maintaining lightly used branches contributed to these decisions. The surviving line became a 134-kilometre route linking Tanjung Aru with Tenom. It uses metre gauge, single track and diesel traction. Passenger and freight traffic share the route. The railway's operational limitations include low speeds, aging rolling stock, difficult terrain and vulnerability to landslides during wet weather. Maintenance and modernization became more prominent in the 2000s. The line closed in 2007 for repair, and substantial numbers of timber sleepers were replaced with concrete sleepers. The Tanjung Aru–Beaufort section reopened on 21 February 2011. Later initiatives included diesel multiple units from Japan and India, the purchase of a tamping machine, staff-training cooperation with KTMB and further federal allocations for the Beaufort–Tenom section. A new headquarters and principal station were also developed in the Tanjung Aru Aeropod area. The railway has periodically been proposed as the foundation of a larger Sabah network. Proposals have included extensions toward Kudat, Sandakan and Tawau, and longer-term concepts involving links with Sarawak and Indonesian Kalimantan under a Trans-Borneo railway idea. These proposals have involved announcements and feasibility studies, but the referenced material does not establish that the extensions were completed. In addition to regular transport, the corridor supports the North Borneo Railway tourism service, operated by a private tourism company. The heritage service markets the historic railway environment to visitors traveling between Kota Kinabalu and Papar. Sabah State Railway remains a state-administered railway separate from KTMB, although the two organizations have cooperated on rehabilitation, training and technical matters.
- 2017Railways Enactment adopted
Sabah approves a new railway law intended to replace the older railway ordinance and provide a framework for future expansion.
- 2011Tanjung Aru–Beaufort section reopens
The rehabilitated section resumes service with improved track conditions.
- 2007System closes for rehabilitation
The railway is closed for major maintenance, including widespread sleeper replacement.
- 1974Main line cut back to Tanjung Aru
The Kota Kinabalu end of the main route is shortened to Tanjung Aru.
- 1963Weston branch closes
The Weston branch is closed as operating costs and road competition increase.
- 1945Post-war railway recovery begins
Australian forces operate and secure railway infrastructure after the wartime destruction of much of the network.
- 1906Melalap extension completed
The line is extended from Tenom to Melalap.
- 1905Line reaches Tenom
The railway is extended to Tenom in the interior of North Borneo.
- 1896Construction begins
Construction of the North Borneo Railway begins to improve the movement of plantation produce to the coast.
Products and positioning
A state-operated regional railway providing essential west-coast and interior connectivity in Sabah, with an additional heritage-tourism role.
Regional passenger railPassenger transport
Scheduled passenger trains operate on the Tanjung Aru–Beaufort and Beaufort–Tenom sections. The service uses diesel multiple units and conventional passenger coaches, generally with single-class, non-air-conditioned accommodation. Some journeys require a change at Halogilat because of operating constraints on the more difficult Tenom section.
Freight railFreight transport
The railway's operational line carries freight as well as passengers. Freight trains use diesel locomotives, including Hitachi and Kawasaki units, and some passenger movements have historically been combined with freight operations.
North Borneo RailwayHeritage tourism
North Borneo Railway is a tourism-oriented train experience running between the Kota Kinabalu area and Papar, with stops or passage through locations including Putatan, Kinarut and Kawang. It is operated by Kinabalu Heritage Tours & Car Rental Sdn Bhd rather than being the ordinary scheduled service of Sabah State Railway.
Flagship businesses
- Tanjung Aru–Beaufort passenger service
- Beaufort–Tenom passenger service
- Beaufort–Halogilat local services
- North Borneo Railway tourism service
Brand decisions
- 2019Feasibility study for Kudat extensionStrategy
Sabah had repeatedly proposed expanding rail coverage beyond the existing west-coast-to-interior line.
What changed. The state reported that RM2 million had been set aside for a 12-month feasibility study concerning a possible railway extension to Kudat.
Aftermath. The referenced material does not confirm construction or completion of the proposed extension.
- 2017Additional diesel multiple units for the Beaufort–Tenom sectionProduct launch
The interior section required suitable rolling stock and further rehabilitation.
What changed. Additional diesel multiple units purchased from India were delivered for use between Beaufort and Tenom, while federal funding supported further upgrades.
Aftermath. The railway continued operating with a mix of newer and older equipment while longer-term modernization remained incomplete.
- 2015State-funded modernization programmeStrategy
The state railway needed improved rolling stock and track-maintenance equipment.
What changed. Sabah allocated RM27.99 million for railway improvements, including diesel multiple units and a tamping machine.
Aftermath. Additional rolling stock was subsequently acquired, and cooperation with KTMB was used for staff training and operational methods.
State allocation. RM27.99 million (2015)
- 2007Major rehabilitation closureStrategy
The railway required extensive track maintenance and replacement of aging timber sleepers.
What changed. The system was closed for repair, with substantial quantities of concrete sleepers installed on the Tanjung Aru–Tenom route.
Aftermath. The Tanjung Aru–Beaufort section returned to service in February 2011 with improved operating capability.
Controversies
- 2018Public criticism and anti-corruption investigation callControversy
Sabah's infrastructure minister publicly described the railway as seriously lagging behind rail services in Peninsular Malaysia and urged the Malaysian Anti-Corruption Commission to investigate alleged failures by the railway department to modernize its system. The referenced material records the call for investigation but does not establish a resulting finding or prosecution.
Recent events
- 2019Feasibility study announced for a possible Kudat railway extension
The state government reported funding for a feasibility study concerning a proposed extension toward Kudat.
Other - 2017Federal funding approved for railway upgrades between Halogilat and Tenom
Federal funding was approved for projects involving the interior section and the acquisition of new diesel multiple units.
Product launchOther - 2015Sabah allocates funding for railway modernization
The state government allocated funds for infrastructure improvements, diesel multiple units and track-maintenance equipment.
Other - 2013Rail-crossing collisions and trackside accidents continue to affect operations
The railway was associated with several reported crossing and passenger-safety incidents between 2013 and 2020, including fatal and serious injuries.
Other - 2011Sabah State Railway reopens the Tanjung Aru–Beaufort section after rehabilitation
The rehabilitated section resumed service with concrete sleepers and improved operating capability.
Other - 2011Fuel tanker collision near Kepayan causes train fire and injuries
A passenger train collided with a fuel tanker at an alleged illegal crossing near Kota Kinabalu. The resulting fire seriously injured several people.
Other - 2008Train derailment near Tenom kills two passengers
A train derailed after a landslide near Tenom and fell into the Padas River, killing two passengers.
Other