Ignalina Nuclear Power Plant
A decommissioned two-unit RBMK-1500 nuclear power station in Lithuania.
Last updated August 24, 2026
Overview
Ignalina Nuclear Power Plant was a major Soviet-designed nuclear generating station in what is now Visaginas Municipality, Lithuania. Although named after the nearby city of Ignalina, the facility was built beside Lake Drūkšiai and became closely associated with the planned settlement of Visaginas, which was developed to house its workforce. The station contained two RBMK-1500 reactors, a high-power Soviet channel-type design using graphite moderation and water cooling. Each reactor was connected to two turbine-generator sets. The plant’s design was related to that used at Chernobyl and lacked a full modern containment structure, making its eventual closure a central condition of Lithuania’s accession to the European Union. Preparatory work began in 1974, field construction started in 1977, and Unit 1 entered service in December 1983. Unit 2 began operation in August 1987 after a delay associated with the Chernobyl disaster. A third unit was started in 1985, suspended in 1988, cancelled, and later dismantled. Following the Chernobyl accident, the reactors were derated from their original planned output. At its peak, Ignalina supplied roughly 70 percent of Lithuania’s electricity demand and represented approximately one quarter of the country’s generating capacity. During the Soviet period, it also exported electricity to other parts of the Soviet Union. Ignalina’s location beside Lake Drūkšiai provided cooling water but also created environmental concerns. Operation increased the lake’s temperature and contributed to eutrophication, while radionuclides and heavy metals accumulated in lake water and sediments. Spent nuclear fuel and radioactive waste became central technical and financial issues after the plant stopped generating electricity. Fuel was transferred into dry-storage systems using CASTOR and CONSTOR casks, while the wider decommissioning program required specialized storage, transport, treatment, and disposal facilities. Lithuania agreed in 1999 to close both operating units as part of its EU accession commitments. Unit 1 shut down on 31 December 2004, and Unit 2 ceased generation on 31 December 2009. The closure was politically controversial because the station provided substantial employment and inexpensive domestic electricity in the Visaginas region. A 2008 referendum proposal to extend Unit 2’s operation did not meet the required turnout threshold. After closure, Lithuania relied on a combination of other domestic generation and electricity imports while beginning a lengthy dismantling and waste-management program. The decommissioning project was designed in two broad phases: an initial phase running from 2004 to 2013 and a second phase planned through 2029, with the site intended to be suitable for brownfield reuse around 2030. Most financing came from the European Union and international donors through the Ignalina International Decommissioning Support Fund, with the Lithuanian state providing a smaller share. The program experienced schedule delays, contracting disputes, financing pressures, and disagreements involving waste-storage and transport arrangements. A replacement Visaginas nuclear project was explored by Lithuania, Latvia, Estonia, and Poland during the 2000s, with GE Hitachi selected as a strategic investor. The proposal ultimately lost political momentum after the 2012 Lithuanian nuclear referendum did not provide a mandate to continue. Ignalina is now principally a decommissioning, radioactive-waste-management, industrial-heritage, and guided-tourism site rather than an electricity brand. Its control-room and reactor-site environments also served as filming locations for the 2019 HBO miniseries Chernobyl, which increased public interest and visitor demand.
History
Ignalina was conceived by the Soviet Union as a showcase for large-scale nuclear engineering and regional electricity production. Preparatory work began in 1974, followed by construction activity in 1977. The plant was built near Lake Drūkšiai, whose water was used for cooling, and a purpose-built settlement, Visaginas, was developed for employees and their families. Unit 1 entered service in December 1983. Unit 2 followed in August 1987, although its planned 1986 commissioning was postponed after the Chernobyl accident. Construction of a third unit began in 1985, was suspended in 1988, cancelled, and dismantled during the following years. The two operating reactors were RBMK-1500 units, graphite-moderated, water-cooled channel reactors with turbine-generators supplied by Soviet industry. Their scale made Ignalina one of the most powerful nuclear stations in the region. It supplied most of Lithuania’s electricity demand at certain points and exported power during the Soviet period. The plant’s relationship to Chernobyl was significant not only because of the shared reactor family but also because Ignalina lacked a robust full containment structure. A control-rod design problem identified when Unit 1 started was later addressed through modifications, with changes tested at Ignalina in 1987 and 1988. Environmental management was a continuing issue. Heat discharged to Lake Drūkšiai raised its temperature and contributed to ecological change, including eutrophication. Radioactive substances and heavy metals also accumulated in the lake and sediments. These issues, combined with the reactor design and European nuclear-safety concerns, shaped the plant’s post-independence future. In 1999 Lithuania agreed to close the units as a condition of EU accession. Unit 1 closed in 2004 and Unit 2 in 2009, despite opposition from local communities and concern about employment, electricity prices, energy security, and the cost of dismantling. The decommissioning program covers the reactors, auxiliary buildings, spent fuel, nuclear materials, and radioactive waste. Lithuania selected an immediate-dismantling approach rather than preserving the facility for a later dismantling date. The initial phase was planned for 2004–2013, followed by a second phase extending to 2029 and a target of preparing the site for reuse around 2030. International support has been essential: the European Union and donor governments supplied most financing through the Ignalina International Decommissioning Support Fund, administered by the European Bank for Reconstruction and Development, while Lithuania supplied the remainder. Implementation has involved dry storage, fuel unloading, radioactive-material transport, waste repositories, and dismantling contracts. The program has faced delays, cost pressures, disputes over the administration of international funds, and disagreements concerning waste transport and storage casks. These difficulties illustrate the long time horizon and technical complexity of closing a large Soviet-era nuclear station. Lithuania and neighboring Baltic states also considered a replacement nuclear plant at Visaginas. Regional agreements were signed in 2006 and 2007, and Lithuania, Estonia, Latvia, and Poland later agreed to establish a project company. GE Hitachi was selected as a strategic investor, but the project did not proceed after the 2012 referendum failed to provide the political support required for continuation. Today Ignalina is a decommissioned site whose principal functions are dismantling, spent-fuel management, radioactive-waste handling, environmental monitoring, and public education. Its appearance in the Chernobyl television miniseries has also made it a notable destination for industrial and nuclear tourism.
- 2012Replacement nuclear project halted
The proposed Visaginas replacement project lost political momentum after the national referendum.
- 2011Unit 2 fuel unloading began
Used-fuel removal from Unit 2 started in February.
- 2009Generation ended
Unit 2 shut down on 31 December, completing the plant’s transition to decommissioning.
- 2004Unit 1 closed
Unit 1 ceased generation on 31 December.
- 1999Closure commitment adopted
Lithuania agreed to close the plant as part of its European Union accession commitments.
- 1987Unit 2 entered service
The second reactor began operation in August after a delay associated with the Chernobyl disaster.
- 1985Unit 3 construction began
A third reactor project was started but was later suspended, cancelled, and dismantled.
- 1983Unit 1 entered service
The first RBMK-1500 reactor began commercial operation in December.
- 1977Field construction started
Construction work began at the Lake Drūkšiai site.
- 1974Preparatory work began
The Soviet project to develop the Ignalina nuclear station entered its preparatory phase.
Products and positioning
A nationally significant Soviet-era nuclear power station transformed into a long-term decommissioning and radioactive-waste-management enterprise.
Unit 1Nuclear electricity generation1983
Ignalina’s first RBMK-1500 reactor entered service in December 1983 and generated electricity for Lithuania and the wider Soviet electricity system. Following post-Chernobyl safety work and reactor derating, the unit continued operating until its permanent shutdown on 31 December 2004. It is now part of the station’s dismantling and radioactive-waste-management program.
Unit 2Nuclear electricity generation1987
The second RBMK-1500 reactor entered service in August 1987 and became the station’s final operating unit. It supplied electricity until 31 December 2009, when Lithuania completed its EU-related closure commitment. Used-fuel unloading began in February 2011, followed by the broader process of defueling, dismantling, and waste management.
Decommissioning programNuclear decommissioning2004
The decommissioning program covers the two reactors, auxiliary systems, spent fuel, radioactive materials, storage facilities, transport systems, and repositories. It was organized into an initial phase and a later phase intended to prepare the site for brownfield reuse. Financing combines Lithuanian public funds with major support from the European Union and international donors.
Flagship businesses
- Unit 1 electricity generation
- Unit 2 electricity generation
- Ignalina decommissioning and nuclear-waste-management program
Marketing campaigns
- 2019Chernobyl filming-location tourism
International
The plant served as a filming location for the HBO miniseries Chernobyl. The production brought international attention to Ignalina’s architecture and reactor-site environment and contributed to increased demand for guided visits.
Outcome. Ignalina became more prominent as an industrial-heritage and nuclear-tourism destination.
Brand decisions
- 2012Termination of the proposed Visaginas replacement projectStrategy
Lithuania had explored a new regional nuclear plant at the Ignalina site, with GE Hitachi selected as strategic investor.
What changed. After a referendum failed to meet the required turnout and political support weakened, the replacement project was stopped.
Aftermath. No new nuclear station was built at the site, leaving Ignalina as a decommissioned facility rather than the host of a successor reactor.
- 2009Permanent shutdown of Unit 2Other
Lithuania’s EU accession commitment required the second operating reactor to close by the end of 2009.
What changed. Unit 2 stopped generating electricity at 23:00 Eastern European Time on 31 December 2009.
Aftermath. Electricity supply was replaced by domestic fossil generation and imports, while the site entered full decommissioning.
- 2006Regional replacement-plant initiativeStrategy
Lithuania, Latvia, and Estonia were concerned about future regional generating capacity after Ignalina’s planned closure.
What changed. The three countries invited their state-owned energy companies to participate in planning a new nuclear station in Lithuania.
Aftermath. The initiative developed into the proposed Visaginas Nuclear Plant project, later involving Poland and GE Hitachi, but did not reach construction.
- 2002Immediate dismantling selected for Unit 1Strategy
The Lithuanian government evaluated safety, economic, social, employment, and practical decommissioning considerations.
What changed. A government resolution directed that Unit 1 be decommissioned and dismantled immediately rather than preserved for later dismantling.
Aftermath. The approach shaped the wider program around active defueling, dismantling, waste treatment, and construction of storage and repository facilities.
- 1999Commitment to close both reactorsStrategy
The plant used RBMK technology associated with Chernobyl and did not have a robust full containment structure. Closure became a condition of Lithuania’s European Union accession.
What changed. Lithuania agreed to shut Unit 1 and Unit 2, with Unit 1 closing in 2004 and Unit 2 in 2009.
Aftermath. The decision ended Ignalina’s generation role and created a multi-decade decommissioning obligation supported largely by European and international funds.
EU decommissioning support and compensation. €820 million committed (Support associated with the closure program; payments continued through 2013)
Leadership
| Name | Title | Tenure |
|---|---|---|
| Osvaldas Čiukšys | Former chief executive officerformer | — |
| Romas Švedas | Former chairman of the boardformer | –2011 |
Controversies
- 2010Decommissioning delays and contract disputesControversy
Government criticism focused on delayed projects, spending without completed facilities, an anticipated additional payment request from Nukem Technologies, and disputes over international-fund administration and radioactive-waste transport. These issues generated public controversy around oversight and project execution.
- 2005Security investigation involving Vladimir AlganovControversy
Lithuania’s State Security Department investigated contacts between plant management and Vladimir Alganov, a former Polish espionage suspect who had obtained a long-term Lithuanian visa in 2002. The episode raised security and governance concerns but does not establish that the plant itself committed wrongdoing.
Recent events
- 2019Chernobyl television series increased interest in site tours
The plant was used as a filming location for HBO’s Chernobyl miniseries, after which guided visits reportedly became heavily booked.
CampaignOther - 2012Visaginas replacement nuclear project lost political mandate
A national referendum did not meet the required turnout for its proposal concerning a new nuclear plant, and the replacement project was subsequently stopped.
OtherRegulation - 2011Spent-fuel unloading from Unit 2 began
Removal of used fuel from Unit 2 began on 1 February 2011 as part of the transition from shutdown to dismantling and long-term storage.
Other - 2010Government reported delays and incomplete decommissioning projects
Lithuania’s energy minister stated that a substantial share of decommissioning funds had been spent while key projects remained unfinished, prompting scrutiny of project management and financing.
Other - 2009Automatic protection system shut down Unit 2 without a radiation release
On 6 June 2009, an automatic reactor-protection action shut down Unit 2. Plant officials reported no radioactive release and kept the unit offline for preventive maintenance.
OtherRegulation - 2009Unit 2 permanently shut down
The remaining generating unit stopped operating on 31 December 2009, ending Ignalina’s role as a power generator.
OtherRegulation - 2004Unit 1 permanently shut down under Lithuania’s EU accession commitment
Ignalina’s first reactor ceased operation on 31 December 2004 as part of Lithuania’s agreement to close the Soviet-designed units.
OtherRegulation