Commonwealth Fusion Systems (CFS) is an American fusion power company founded in 2018 in Cambridge, Massachusetts, after a spin-off from the Massachusetts Institute of Technology (MIT). Its stated goal is to build a small fusion power plant based on the ARC tokamak design.[1] It has participated in the United States Department of Energy’s INFUSE public-private knowledge innovation scheme with several national labs and universities.[2]
History
CFS was founded in 2018 as a spin-off from the MIT Plasma Science and Fusion Center.[3] After initial funding of $50 million in 2018 from the Italian multinational Eni,[1] CFS closed its series A round of venture capital funding in 2019 with a total of US$115 million in funding from Eni,[4] Bill Gates's Breakthrough Energy Ventures, Vinod Khosla's Khosla Ventures, and others.[5][6] CFS raised an additional US$ 84million in series A2 funding from Singapore's Temasek, Norway's Equinor, and Devonshire Investors, as well as from previous investors.[7]
In September 2020, the company reported significant progress in the physics and engineering design of the SPARC tokamak,[8] and in October 2020, the development of a new high temperature superconducting cable, called VIPER.[9] Over the 9-month period from 2019 to 2020, the company purchased over 186 miles of the wire in 400-600 meter lengths from vendors, more than was produced by some vendors over the preceding 6 years.[10]
In March 2021, CFS announced plans to build a headquarters, manufacturing, and research campus (including the SPARC tokamak) in Devens, Massachusetts.[11] In the same year, CEO Bob Mumgaard was appointed to the board of directors of the Fusion Industry Association, which was incorporated as a non profit association with a focus on combating climate change.[12] Later in September 2021, the company announced the demonstration of a high temperature superconducting magnet, able to generate magnetic fields of 20 tesla.[13][14]
The company raised an additional $1.8 billion in Series B funding in November 2021, to construct and operate the SPARC tokamak.[15] This was funded by Temasek Holdings, Google, Bill Gates and Eni. In December of that year, the company began construction on SPARC in Devens, Massachusetts.[16]
By late 2022, CFS had grown to approximately 350 employees and was preparing to move into its Devens campus.[17] A ceremonial opening for the Devens campus was held in February 2023.[18]
In March 2023, Eni and CFS signed a multi-year agreement to collaborate in obtaining the components and authorizations necessary for the construction of the first SPARC experimental plant, as well as the construction of the first Arc power plant and the identification of countries that may be interested in hosting it.[19] In May of that year, the United States Department of Energy granted the company additional funding along with seven other US companies via the Milestone-Based Fusion Development Program.[20] The following year, in 2024, CFS announced plans to build the world's first grid-scale commercial nuclear fusion power plant at the James River Industrial Center in Chesterfield County, Virginia. The plant will produce about 400 MWe.[21][22] The company plans to build it by the early 2030s.[23]
Google announced in July 2025 that it had signed a direct corporate power purchase agreement, a first of its kind, with CFS. The agreement will give Google 200 megawatts of power from CFS’s ARC project in Virginia.[24] Later in August, CFS announced $863 million had been raised in a Series B2 round.[25][26] In September 2025, Eni made a $1 billion deal with CFS to use power from its first fusion reactor.[27][28]
Technology
CFS intends to demonstrate net-positive energy in a tokamak via the SPARC tokamak, which will pave the way for a multi-hundred MW electric ARC plant.[29][30][31] They plan to achieve this by incorporating a large-bore, high field (20 tesla) superconducting magnet made of VIPER, a yttrium barium copper oxide superconducting tape.[32] As a high-temperature superconductor, VIPER can sustain higher electric currents and magnetic fields than were previously possible. Previous tokamaks used copper or low-temperature superconducting magnets that need to be large in size to create the magnetic field that is necessary to achieve net energy. The CFS high-temperature superconductor magnet is intended to create much stronger magnetic fields, allowing the tokamaks to be much smaller.
The first magnet of this type was built and tested in 2021. The D-shaped magnet consisted of 16 layers, each containing HTS tape. It weighed 10 tons and stood 8 feet tall, including 165 miles of tape. SPARC will include 18 similar magnets.[16] The magnet technology used in SPARC is intended to give "the world a clear path to fusion power,"[33] according to the CFS CEO Bob Mumgaard.
As of October 2024, SPARC was targeted to begin operations in 2026, with the goal of demonstrating net power (Q > 1) in 2027.[34] CFS also plans to build a power plant based on the ARC design[1] at the beginning of the 2030s.[35] Both SPARC and ARC plan to use deuterium-tritium fuel, which produces helium as a by-product.[36][37]
SPARC is predicted to have a burning plasma. That means that the fusion process would be predominantly self-heating.[38]
See also
- General Fusion
- Helium production in the United States
- List of fusion experiments
- List of nuclear fusion companies
- Tokamak Energy
External links
References
- David Chandler. MIT and newly formed company launch novel approach to fusion power MIT News, March 9, 2018, retrieved April 16, 2018^
- Princeton Plasma Physics Laboratory. Future Zero-Emissions Power Plants: Scientists Collaborate on Development of Commercial Fusion Energy SciTechDaily, January 2, 2021, retrieved February 8, 2021^
- Jeff Tollefson. MIT launches multimillion-dollar collaboration to develop fusion energy Nature, March 9, 2018^
- Hannah Devlin. Nuclear fusion on brink of being realized, say MIT scientists The Guardian, March 9, 2018, retrieved April 16, 2018^
- Akshat Rathi. In search of clean energy, investments in nuclear-fusion startups are heating up Quartz, September 26, 2018, retrieved February 4, 2019^
- Dan Primack. Nuclear fusion startup raises $115 million, promises a prototype by 2025 Axios, 2019-06-28, retrieved 2026-01-02^
- Srividya Kalyanaraman. Commonwealth Fusion Systems snags another $84M in Series A2 Boston Business Journal, 26 May 2020, retrieved 2025-08-25^
- Henry Fountain. Compact Nuclear Fusion Reactor Is 'Very Likely to Work,' Studies Suggest New York Times, September 29, 2020, retrieved September 29, 2020^
- Superconductor technology for smaller, sooner fusion MIT PSFC, retrieved October 8, 2020^
- Molodyk, A., et al. "Development and large volume production of extremely high current density YBa2Cu3O7 superconducting wires for fusion." Scientific reports 11.1 (2021): 1-11.^
- Jon Chesto. MIT energy startup homes in on fusion, with plans for 47-acre site in Devens BostonGlobe.com, March 3, 2021, retrieved March 3, 2021^
- Fusion Industry Association Announces Independent Incorporation and Expansion Yahoo! Finance, May 5, 2021^
- MIT-designed project achieves major advance toward fusion energy MIT News, September 8, 2021, retrieved September 14, 2021^
- Commonwealth Fusion Systems creates viable path to commercial fusion power with world's strongest magnet www.cfs.energy, retrieved September 14, 2021^
- retrieved 2025-01-09^
- James Temple. A hole in the ground could be the future of fusion power MIT Technology Review, retrieved 2022-10-03^
- Birthplace of a fusion industry? Commonwealth Fusion Systems prepares to open Devens campus The Harvard Press, October 21, 2022^
- Shane Rhodes. Commonwealth Fusion Systems celebrates newest campus at Devens Sentinel & Enterprise, February 16, 2023^
- Eni joins forces with the American CFS for nuclear fusion: the first prototype in 2025 La Stampa, March 9, 2023, retrieved March 12, 2023^
- DOE picks eight fusion companies to design pilot power plants Nuclear Newswire, American Nuclear Society, retrieved 20 March 2026^
- World's first commercial fusion power plant coming to Chesterfield 6AM - RICtoday, 2024-12-18, retrieved 2024-12-19^
- Virginia to host world's first fusion power plant Virginia Mercury, December 18, 2024^
- Ella Nilsen. Google just bought 200 megawatts of fusion energy that doesn't even exist yet CNN, 2025-06-30, retrieved 2025-07-16^
- Timothy Gardner. Google strikes deal to buy fusion power from MIT spinoff Commonwealth Reuters, 2025-06-30, retrieved 2025-07-16^
- Lisa Martine Jenkins. Commonwealth Fusion Systems tops up its Series B with $863 million Latitude Media, 2025-08-29, retrieved 2025-09-12^
- Tim De Chant. Nvidia, Google, and Bill Gates help Commonwealth Fusion Systems raise $863M TechCrunch, 2025-08-28, retrieved 2025-09-24^
- Casey Crownhartarchive page. An oil and gas giant signed a $1 billion deal with Commonwealth Fusion Systems MIT Technology Review, retrieved 2025-09-24^
- Tim De Chant. Commonwealth Fusion Systems books a $1B+ power deal for its future fusion reactor TechCrunch, 2025-09-22, retrieved 2025-09-24^
- A New Approach to Fusion Energy Starts Today eapsweb.mit.edu, retrieved April 9, 2019^
- Martin Greenwald. Fusion Energy: Research at the Crossroads Joule, 2019^
- A. J. Creely, M. J. Greenwald, S. B. Ballinger, D. Brunner, J. Canik, J. Doody, T. Fülöp, D. T. Garnier. Overview of the SPARC tokamak Journal of Plasma Physics, 2020^
- David Chandler. MIT-designed project achieves major advance toward fusion energy MIT, September 8, 2021, retrieved September 8, 2021^
- PR Newswire Encyclopedia of Public Relations, SAGE Publications, Inc., 2005, retrieved 2022-04-28^
- Casey Crownhart. Inside a fusion energy facility 1 October 2024, retrieved 3 November 2024^
- Eni and Commonwealth Fusion Systems, together for fusion energy Eni^
- DOE Explains...Fusion Reactions Energy.gov^
- Charlie Paullin. Virginia to host world's first fusion power plant • Virginia Mercury December 18, 2024^
- Nuclear Fusion Articles Based on Papers Presented at the 27th Fusion Energy Conference Nuclear Fusion, 2020-06-12^