Batwing (roller coaster)

Batwing was a steel flying roller coaster built by Vekoma at Six Flags America in Prince George's County, Maryland. The ride was a clone of the now-defunct Firehawk at Kings Island, and similar to the also-defunct Nighthawk at Carowinds, however that ride had a slightly different ending, and different paint scheme. Batwing was the last operating Vekoma Flying Dutchman until its closure in 2025.

History

In February 2001, it was confirmed that Six Flags America would be receiving Batwing. This attraction would be a Vekoma Flying Dutchman coaster themed to Batman. It would be built towards the back of the park in the Gotham City section. Although the ride was set to open in May 2001, the opening was delayed. On June 16, 2001, Batwing officially opened to guests. It was the first flying roller coaster on the East Coast.[1]

On May 1, 2025, Six Flags announced that the Six Flags America park would close at the end of the 2025 season on November 2, 2025.[2] The status on the future of the Batwing roller coaster was not given at the time of the announcement.[3]

On July 8, 2025, Batwing was closed indefinitely due to an accident involving the front decorative fiberglass part of the train falling off and shattering. No riders were injured. However, the ride closed immediately after the incident. On August 31, 2025, Batwing was removed from the Six Flags app and map.[4] That September, the park announced that the coaster had been closed permanently, ahead of the park's scheduled permanent closure date. A sign was placed at the ride's entrance which stated "Soaring since 2001, this ride has taken its final flight. Thank you for the memories."[5]

Ride experience

Track

The steel track was approximately 3340 ft in length and the height of the lift is approximately 115 ft.[6]

Batwing had a total of five inversions. It featured one vertical loop, two inline twists, two "Lie to Fly" and two "Fly to Lie" elements.[6] Each "Lie to Fly" and "Fly to Lie" element was counted as a half inversion.[7][8] A "Lie to Fly" element was when riders are on their backs, facing the sky and they are flipped and face the ground.[9] A "Fly to Lie" element was the opposite.

Layout

Once riders were seated and restrained, the train tilts backwards into a 'lay-down' position and dispatches. The train traveled backwards out of the station, turned left and traveled up the 115 ft lift hill at a 33-degree angle. Once the train reached the top of the lift hill, it dipped down into a twist (called a "Lie-to-Fly") that turned the trains upside down into a flying position where riders face the ground. After the twist, the train traveled down the first drop, reaching speeds of 51 mi/h. Riders then go through an over banked Horseshoe Curve element. Following the Horseshoe, the train entered a "Fly-to-Lie" element that turns riders back to a lay-down position. After the banked turn, the ride enters the 66 ft tall vertical loop, where riders experience 4.3 G's. The train then went into another "Lie-to-Fly" element. Following the loop, riders went through another turn and then hit two consecutive inline twists. Following the inline twists, the train entered the final helix. After the helix, riders hit the final "Fly-to-Lie" element and the train was slowed down on the brake run.[10][11]

Trains

Batwing operated with two trains. Each train had six cars that had four seats in a single row for a total of 24 riders.[6] It originally operated with three trains but was reduced to two in 2007. Riders are secured by a vest over the chest and a lap bar.

See also

References

  1. Incredible Flying Coaster Coming to Six Flags America Ultimate Rollercoaster^
  2. Ittai Sopher. Six Flags in Bowie to close later this year WUSA (TV), May 1, 2025, retrieved May 1, 2025^
  3. Peter Marzano. Six Flags America, Hurricane Harbor to close after 2025 season, company announces WMAQ-TV, May 1, 2025, retrieved May 1, 2025^
  4. Six Flags America www.screamscape.com, retrieved 2025-09-07^
  5. John Gregory. This Six Flags America coaster is already closed as park begins final days Theme Park Tribune, September 6, 2025, retrieved September 7, 2025^
  6. retrieved November 17, 2012^
  7. retrieved November 7, 2012^
  8. retrieved November 7, 2012^
  9. Flying Coasters Coaster Force, retrieved November 7, 2012^
  10. Alex Bove. Batwing Review, Ultimate Roller Coaster Ultimate Roller Coaster, retrieved November 17, 2012^
  11. Batwing POV Coaster Force, retrieved November 17, 2012^