Starting in mid-1961, the route between Paris and Lausanne was operated by the Trans Europ Express Cisalpin trains, which continued on to Milan. On 22 January 1984 this service was replaced by a new TGV service with tri-current locomotives, though service was cut back to Lausanne. In the spirit of the previous European expresses, the trains were christened with names: Champs-Élysées, Lemano, Lutetia and Cisalpin. On 31 May 1987 the train service was rebranded as EuroCity. By this time, a service to Bern was in place as well.[4]
The GIE was created for the first time on 23 May 1993, to operate the segments between Paris and Lausanne/Bern. Service to Geneva was not covered at that time. During the winter of 1995–1996, a single roundtrip per day was extended from Lausanne to Brig to stop at stations serving ski resorts in the Rhône Valley. As was the case with other trains with similar service, these trains were branded as TGV des Neiges. On 28 September 1997 the service was slightly reorganized and rebranded as Ligne de Cœur, with new livery applied to the rolling stock. On 4 March 2002 the name Lyria was applied for the first time to the service. The name then slowly came to stand for all TGV services between France and Switzerland and was applied to Paris–Geneva trains around January 2005. Service to Geneva had existed as part of LGV Sud-Est since 1981.[4],[5]
At the end of 2005, Lyria transported its 3 millionth passenger.
After the opening of the LGV Est in June 2007, Lyria service between Paris and Zurich began using the newly constructed line instead of the previous route, passing through Strasbourg, Colmar, Mulhouse and Basel. Consequently, service from Paris departed from Gare de l'Est instead of Gare de Lyon until 2011. [4],[5]
In February 2011, service improvements were announced, with a fleet of 19 TGV POS trains offering increased frequencies.[6]
Since 12 December 2010, the travel time on the Paris–Geneva line has improved with the reconstruction of the Haut-Bugey line, which connects Bourg-en-Bresse and Bellegarde-sur-Valserine. Until then, only the western part of the line was open (up to Oyonnax), and the project has restored the entire length of the line. Travel time between Paris and Geneva reduced by 30 minutes, to 3 hours and 5 minutes, and track capacity was also increased, allowing nine trains each way per day instead of the previous seven.[4],[5]
In 2011, with the completion of the LGV Rhin-Rhône, travel time between Paris and Basel/Zurich was reduced by 30 minutes, passing through Dijon, Mulhouse and Basel. The departure station in Paris returned to Gare de Lyon.[4][7]