Speed increases
Tōhoku Shinkansen
E5 series trains, capable of up to 320 km/h, initially limited to 300 km/h, were introduced on the Tōhoku Shinkansen in March 2011. Operation at the maximum speed of 320 km/h between Utsunomiya and Morioka on this route commenced on 16 March 2013. It reduced the journey time to around 3 hours for trains from Tokyo to Shin-Aomori, a distance of 674 km.
Extensive trials using the Fastech 360 test trains have shown that operation at 360 km/h is not feasible because of problems of noise pollution (particularly tunnel boom), overhead wire wear, and braking distances. On 30 October 2012, JR East announced that it was pursuing research and development to increase speeds to 360 km/h on the Tohoku Shinkansen by 2020.[93] The ALFA-X is undergoing testing.
Hokkaido Shinkansen
Upon commencement of services in 2016, the maximum speed on the approximately 82 km dual gauge section of the Hokkaido Shinkansen (including through the Seikan Tunnel) was 140 km/h, which was increased to 160 km/h by March 2019.[94] There are approximately 50 freight trains using the dual gauge section each day, so limiting the travel of such trains to times outside of Shinkansen services is not an option. Because of this and other weather-related factors cited by JR East and JR Hokkaido, the fastest journey time between Tokyo and Shin-Hakodate-Hokuto is 3 hours, 57 minutes.
During the 2020–21 New Year Holiday period, certain Shinkansen services were operated at 210 km/h on the dual gauge section and was proposed again for the Golden Week Holiday period from 3–6 May 2021, due to fewer freight trains operating.[94]
To achieve the full benefit of Shinkansen trains travelling on the dual gauge section at 260 km/h (the maximum speed proposed through the tunnel), alternatives are being considered, such as a system to automatically slow Shinkansen trains to 200 km/h when passing narrow-gauge trains, and/or loading freight trains onto special "Train on Train" standard-gauge trains (akin to a covered piggyback flatcar train) built to withstand the shock wave of oncoming Shinkansen trains traveling at full speed. This would enable a travel time from Tokyo to Shin-Hakodate-Hokuto of 3 hours and 45 minutes, a saving of 12 minutes.
Tōhoku Shinkansen
E5 series trains, capable of up to 320 km/h, initially limited to 300 km/h, were introduced on the Tōhoku Shinkansen in March 2011. Operation at the maximum speed of 320 km/h between Utsunomiya and Morioka on this route commenced on 16 March 2013. It reduced the journey time to around 3 hours for trains from Tokyo to Shin-Aomori, a distance of 674 km.
Extensive trials using the Fastech 360 test trains have shown that operation at 360 km/h is not feasible because of problems of noise pollution (particularly tunnel boom), overhead wire wear, and braking distances. On 30 October 2012, JR East announced that it was pursuing research and development to increase speeds to 360 km/h on the Tohoku Shinkansen by 2020.[93] The ALFA-X is undergoing testing.
Hokkaido Shinkansen
Upon commencement of services in 2016, the maximum speed on the approximately 82 km dual gauge section of the Hokkaido Shinkansen (including through the Seikan Tunnel) was 140 km/h, which was increased to 160 km/h by March 2019.[94] There are approximately 50 freight trains using the dual gauge section each day, so limiting the travel of such trains to times outside of Shinkansen services is not an option. Because of this and other weather-related factors cited by JR East and JR Hokkaido, the fastest journey time between Tokyo and Shin-Hakodate-Hokuto is 3 hours, 57 minutes.
During the 2020–21 New Year Holiday period, certain Shinkansen services were operated at 210 km/h on the dual gauge section and was proposed again for the Golden Week Holiday period from 3–6 May 2021, due to fewer freight trains operating.[94]
To achieve the full benefit of Shinkansen trains travelling on the dual gauge section at 260 km/h (the maximum speed proposed through the tunnel), alternatives are being considered, such as a system to automatically slow Shinkansen trains to 200 km/h when passing narrow-gauge trains, and/or loading freight trains onto special "Train on Train" standard-gauge trains (akin to a covered piggyback flatcar train) built to withstand the shock wave of oncoming Shinkansen trains traveling at full speed. This would enable a travel time from Tokyo to Shin-Hakodate-Hokuto of 3 hours and 45 minutes, a saving of 12 minutes.
Hokuriku extension
The Hokuriku Shinkansen was extended from Kanazawa to Tsuruga on 16 March 2024.[95]
There are further plans to extend the line from Tsuruga to Osaka, with the Obama-Kyoto route chosen by the government on 20 December 2016,[96] after a government committee investigated the five nominated routes.[97]
Construction of the extension beyond Tsuruga is not expected to commence before 2030, with a projected 15-year construction period. On 6 March 2017 the government committee announced the chosen route from Kyoto to Shin-Osaka is to be via Kyotanabe, with a station at Matsuiyamate on the Katamachi Line.[98][99]
Abandoned interim Gauge Change plans
To extend the benefits of the Hokuriku Shinkansen to stations west of Tsuruga before the line to Osaka is completed, JR West was working in partnership with Talgo on the development of a Gauge Change Train (CGT) capable of operating under both the 25 kV AC electrification used on the Shinkansen and the 1.5 kV DC system employed on conventional lines. A trial of the proposed bogie was undertaken on a purpose-built 180 m gauge-changer at Tsuruga, but it was unsuccessful and the plans were abandoned.[100]
Tohoku extension/Hokkaido Shinkansen
The Hokkaido Shinkansen forms an extension of the Tohoku Shinkansen north of Shin-Aomori to Shin-Hakodate-Hokuto Station (north of the Hokkaido city of Hakodate) through the Seikan Tunnel, which was converted to dual gauge as part of the project, opening in March 2016.
JR Hokkaido is extending the Hokkaido Shinkansen from Shin-Hakodate-Hokuto to Sapporo to open by 2038. The 211.3 km extension will be approximately 76% in tunnels, including major tunnels such as Toshima (~32.675 km) Oshima (~26.5 km), Teine (~26.5 km) and Shiribeshi (~18 km).[101]
Although an extension from Sapporo to Asahikawa was included in the 1973 list of planned lines, at this time it is unknown whether the Hokkaido Shinkansen will be extended beyond Sapporo.
Nishi Kyushu Shinkansen
JR Kyushu opened the Nishi Kyushu Shinkansen from Takeo-Onsen to Nagasaki (built to full Shinkansen standard) on 23 September 2022, with the existing narrow-gauge section between Shin-Tosu and Takeo Onsen proposed to be upgraded as part of this project.
This proposal initially involved introducing Gauge Change Trains (GCT) travelling from Hakata to Shin-Tosu (26.3 km) on the existing Kyushu Shinkansen line, then passing through a specific gauge changing (standard to narrow) section of track linking to the existing Nagasaki Main Line, along which it would travel to Hizen Yamaguchi (37.6 km), then onto the Sasebo Line to Takeo-Onsen (13.7 km), where another gauge changing section (narrow to standard) would lead onto the final Shinkansen line to Nagasaki (66 km). However, significant technical issues with the axles of the GCT resulted in its cancellation.
On 28 October 2020, JR Kyushu announced it would utilize a 6-car version of the N700S for the isolated Shinkansen section from Nagasaki, with 'cross platform' change to a relay service at Takeo Onsen station to connect to Hakata.[102] JR Kyushu also announced the service would continue to use the name 'Kamome' for the Hakata-Nagasaki service, which has been in use since 1961.[103]
The Shinkansen line shortens the distance between Hakata and Nagasaki by 6.2% (9.6 km), and while only 64% of the route is built to full Shinkansen standards, it eliminated the slowest sections of the previous narrow-gauge route.
Maglev (Chūō Shinkansen)
Maglev trains have been undertaking test runs on the Yamanashi test track since 1997, running at speeds of over 500 km/h. As a result of this extensive testing, maglev technology is almost ready for public usage.[105] An extension of the test track from 18.4 to 42.8 km was completed in June 2013, enabling extended high-speed running trials to commence in August 2013. This section will be incorporated into the Chūō Shinkansen which will eventually link Tokyo to Osaka. Construction of the Shinagawa to Nagoya section began in 2014, with 86% of the 286 km route to be in tunnels. Plans were approved in 2017 for the Chūō Shinkansen to begin at Tokyo Station, rather than Shinagawa Station as initially planned due to difficulties in securing land.[106]
JR Central originally aimed to begin commercial service between Tokyo and Nagoya in 2027. However, in 2024, Central Japan Railway Co President Shunsuke Niwa said that due to construction delays a 2027 opening was now impossible and it is not expected to open until at least 2034.[39][31]
Mini-Shinkansen
Mini-shinkansen (ミニ新幹線) is the name given to the routes where former narrow-gauge lines have been converted to standard gauge to allow Shinkansen trains to travel to cities without the expense of constructing full Shinkansen standard lines.
Two mini-shinkansen routes have been constructed: the Yamagata Shinkansen and Akita Shinkansen. Shinkansen services to these lines traverse the Tohoku Shinkansen line from Tokyo before branching off to traditional main lines. On both the Yamagata/Shinjo and Akita lines, the narrow-gauge lines were regauged, resulting in the local services being operated by standard-gauge versions of suburban/interurban rolling stock. On the Akita line between Omagari and Akita, one of the two narrow-gauge lines was regauged, and a section of the remaining narrow-gauge line is dual gauge, providing opportunity for Shinkansen services to pass each other without stopping.
The maximum speed on these lines is 130 km/h, however the overall travel time to/from Tokyo is improved due to the elimination of the need for passengers to change trains at Fukushima and Morioka respectively.
As the loading gauge (size of the train that can travel on a line) was not altered when the rail gauge was widened, only Shinkansen trains specially built for these routes can travel on the lines. They are the E3 and E6 series trains.
Whilst no further Mini-shinkansen routes have been proposed, it remains an option for providing Shinkansen services to cities on the narrow-gauge network.
Proposed Ou Base Tunnel
Construction of a base tunnel on the Yamagata Shinkansen is proposed, with JR East having undertaken a survey of a planned route from Niwasaka to Sekine, just south of Yonezawa station.[111] 23.1 km of the proposed 24.9 km line would be in tunnel, mostly to the north of the existing 88 km Fukushima – Yamagata section. To be built on an improved alignment, the tunnel would lower journey times between Fukushima and Yamagata by ~10 min due to a proposed line speed of up to 200 km/h.
The tunnel would avoid the Itaya Toge pass through the Ōu Mountains west of Fukushima. Gradients range from 3.0% to 3.8% and the line reaches an altitude of 548 m. The curvature and steep grades of the current line limit train speeds to 55 km/h or less, and it is vulnerable to heavy rain and snowfall as well as high winds. Between 2011 and 2017 a total of 410 Yamagata mini-Shinkansen services were either suspended or delayed, and 40% of these incidents occurred on the line over the Itaya Toge pass.
If the ¥150 billion base tunnel is authorised, detailed design would take five years and construction another 15 years. The cost could increase by ¥12 billion if the tunnel were to be built with a cross-section large enough to permit the line to be upgraded to the full Shinkansen loading gauge.
Gauge Change Train
This is the name for the concept of using a single train that is designed to travel on both narrow-gauge railway lines and the standard gauge used by Shinkansen train services in Japan. The trucks/bogies of the Gauge Change Train (GCT) allow the wheels to be unlocked from the axles, narrowed or widened as necessary, and then relocked. This allows a GCT to traverse both standard-gauge and narrow-gauge tracks without the expense of regauging lines.
Three test trains were constructed, with the second set having completed reliability trials on the Yosan Line east of Matsuyama (in Shikoku) in September 2013. The third set was undertaking gauge changing trials at Shin-Yatsushiro Station (on Kyushu), commencing in 2014 for a proposed three-year period, however testing was suspended in December 2014 after accumulating approximating 33,000 km, following the discovery of defective thrust bearing oil seals on the bogies.[112] The train was being trialled between Kumamoto, travelling on the narrow-gauge line to Shin-Yatsushiro, where a gauge changer was installed, so the GCT could be trialled on the Shinkansen line to Kagoshima. It was anticipated the train would travel approximately 600,000 km over the three-year trial.
A new "full standard" Shinkansen line was opened in 2022 from Takeo Onsen to Nagasaki, with the Shin-Tosu – Takeo Onsen section of the Nishi Kyushu Shinkansen remaining narrow gauge. GCTs were proposed to provide Shinkansen service from the line's opening, however with the GCT being cancelled, JR Kyushu announced it would provide an interim 'relay' service.[102]