Modernisation
The line was closed in 2007 for maintenance and repair. As part of the works undertaken during 2006 and 2007, about 52,530 and 76,600 concrete sleepers were introduced for Sector 2 and 1 of the Tanjung Aru-Tenom section, for better train operation. This replacement mirrors the trend of changing from wooden sleepers as earlier carried out by Keretapi Tanah Melayu Berhad (KTMB) two decades earlier at Kerdau-Jerantut and Sungai Yu-Tumpat lines. These sleepers were manufactured in Peninsular Malaysia by the same local manufacturer.
The section Tanjung Aru-Beaufort reopened on 21 February 2011, and the trip now takes 2 hours and 15 minutes as the coaches can run at a speed of up to 80 kilometres/hour compared to 50 kilometres/hour previously. There are a total of 15 stations between Sembulan and Tenom, namely:
In 2015, a total of RM27.99 million has been allocated by the state government to improve and upgrade the state railway, the provisions include the acquisition of diesel multiple units (DMUs) train set from Japan[7] and a tamping machine for the areas from Beaufort to Tanjung Aru.[8] Additional DMUs from India cost RM8 million purchased in 2016 was delivered in early 2017 for the use in Beaufort to Tenom areas.[9][10] The state railway have since collaborated with KTMB and the country Human Resource Ministry for staff training and new methods of operations including for the track maintenance. A new headquarters and main station for the railway have also been constructed in Tanjung Aru as part of the Aeropod.[11] On 15 September 2017, around RM101 million allocation by the federal government through Transport Ministry has been approved for three projects to upgrade the railway lines from Halogilat in Beaufort to Tenom with three new DMUs.[12]
Despite some modernisation have been carried out in the past, the train service in Sabah remain in poor condition until 2018 in contrast to modern train service in Peninsular Malaysia.[13] This had been addressed by the State Infrastructure Development Minister Peter Anthony who admitted the train service in Sabah is really far behind compared to its Peninsular counterparts and become an embarrassment to the state with some of the equipment are nearly a hundred years old which should have been sent to the museum, blaming the situation as one of the cause from the failure of the previous state government in administering the locomotive service. The minister stated that the State Ministry under the new government plans to conduct a study to upgrade the state train service to make it in par with its West Malaysia counterparts.[14]
The minister had also urged the Malaysian Anti-Corruption Commission (MACC) to investigate the Railway Department (SRD) for their failure to modernise the state train systems with the new state government promised under their new Key Performance Index (KPI), the railway system and its infrastructure will be developed, including having quality trains with better comfort with the requests for funding from the federal government will be forwarded to connecting Melalap, Beaufort and expanding the rail network to Tuaran, Kudat, Pitas until Tawau in the eastern coast of Sabah.[15]
- Secretariat – Tanjung Aru – Putatan – Kinarut – Kawang – Papar – Kimanis – Bongawan – Membakut – Beaufort – Saliwangan Baru – Halogilat – Rayoh – Pangi – Tenom
Leisure and tourism service
A train for tourism called North Borneo Railway was also established from Kota Kinabalu to Papar passing through Putatan, Kinarut and Kawang. The train is operated by the Kinabalu Heritage Tours & Car Rental Sdn Bhd management.[16]
Line extension plan
On 17 September 2015, it was announced that the railway line in Sabah will be extended to cover the northern and east coast areas, mainly to major towns of Kudat, Sandakan and Tawau.[10][17] On 21 March 2017, around RM1 million has been allocated for the project study.[18]
Once the project is complete, there is also a proposal to connecting the rail networks of Sabah and Sarawak in Malaysia with the provinces of Kalimantan in Indonesia that will be called as "Trans-Borneo Railway",[19] as Indonesia were currently developing the railway network on their side.[20][21]