Arabian Ranches
Construction of the 1,650-acre Arabian Ranches private residential development began in 2012.[26] It consists of a number of individual communities, each with their own architectural style. The project also encompasses commercial and leisure facilities, including an 18-hole Golf Course and Dubai Equestrian & Polo Club.[27] It is scheduled for completion in 2019 and, once finished, will contain over 4,000 villas.
Arabian Ranches is a wholly owned project under development, and as of 30 September 2017, 99% of the residential units in the development had been sold.[28]
Dubai Creek Harbour
Emaar Development has a joint development agreement for Dubai Creek Harbour with 50% of the economic benefits.[29]
It consists of 9 distinct districts and contains the site for the flagship Dubai Creek Tower, this 1,480-acre mixed-use development was announced in 2013.[30] Upon completion, it will be home to residential, commercial, and leisure facilities.[31]
The Dubai Creek Tower is scheduled to surpass the Burj Khalifa as the world's tallest building.[32] It has been designed by architect Santiago Calatrava.[33]
Dubai Hills Estate
Announced in 2013, this mixed-use development is the first stage in the construction of Mohammed bin Rashid City (MBR City).[34] It will be a 'city within a city' that will spread over an area of 2,700 acres and will be home to several residential neighbourhoods, leisure facilities, and commercial properties – including the Dubai Hills Mall.[35][36] Two Metro lines and three stations will serve the development when completed. Some of the development – predominately residential units – have already launched, and are set around an 18-hole Championship golf course.
Dubai Hills Estate is a consolidated joint venture with Meraas Estates LLC. A total of 5,279 total units are under development.
The development will include:
- The Hills View and Hills Grove
- Acacia Park Heights
- Mulberry at Mark Heights
- Maple I, II and III
Emaar Beachfront
Emaar Beachfront is a master-planned gated community in Dubai, UAE. The project was announced in September 2017 and its initial offering of residential units sold out immediately.[37] One of the development's key features is access to two beaches which, when combined, total 1.5 km of waterfront access.[38] As of November 2018, a total of three residential projects have been launched at Emaar Beachfront. The first project to be launched was Beach Vista followed by Sunrise Bay and Marina Vista.[39]
At least four alleged Aussie Cartel members, a group of Australian criminals, own apartments in the Sunrise Bay Tower 1 of Emaar Beachfront.[40]
Emaar South
Emaar South is one of the principal components in Emaar Development's Dubai South project.[41] Emaar South was announced in August 2016 and, upon completion, will encompass 22,700 residential units, leisure facilities, public amenities, and commercial properties, spread over a 6,700,000m² site.[42]
Emaar South is a joint venture project with DACC (Dubai Aviation City Corporation), owned in equal shares.