Production
Production started in December 1975 from the Auk 'A' platform.
The topsides facilities included capability to drill, produce meter and pump oil. There were 10 well slots with 6 initially drilled. The plant has a capacity of 80,000 barrels of oil per day, Production start up was in December 1975.[1] Initially production was to an ELSBM and then to the Fulmar Alpha platform in August 1986.The Exposed Location Single Buoy Mooring (ELSBM) has a height of 74 metres and stands in a water depth of 86 metres. It comprises a helideck, a mooring trunk, a mooring rope reel turntable buoyancy compartments and a ballast compartment. It is anchored to the seabed by eight 13.5 tonne anchors and 600 metre chains. It is supplied with oil through two 10 inch diameter hoses.[1]
Associated gas from the reservoir was separated and used to power electrical generation with the excess being flared.
Oil production (in thousands of barrels) was as follows:[1] { "version": 2, "width": 500, "height": 200, "data": [ { "name": "table", "values": [ { "x": 1975, "y": 4 }, { "x": 1976, "y": 9091 }, { "x": 1977, "y": 17547 }, { "x": 1978, "y": 9791 }, { "x": 1979, "y": 6340 }, { "x": 1980, "y": 4706 }, { "x": 1981, "y": 4683 }, { "x": 1982, "y": 4601 }, { "x": 1983, "y": 4250 } ] } ], "scales": [ { "name": "x", "type": "ordinal", "range": "width", "zero": false, "domain": { "data": "table", "field": "x" } }, { "name": "y", "type": "linear", "range": "height", "nice": true, "domain": { "data": "table", "field": "y" } } ], "axes": [ { "type": "x", "scale": "x" }, { "type": "y", "scale": "y" } ], "marks": [ { "type": "rect", "from": { "data": "table" }, "properties": { "enter": { "x": { "scale": "x", "field": "x" }, "y": { "scale": "y", "field": "y" }, "y2": { "scale": "y", "value": 0 }, "fill": { "value": "steelblue" }, "width": { "scale": "x", "band": "true", "offset": -1 } } } } ] }